mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2024-11-24 16:21:56 +00:00
Edit cave names into logbook entries
This commit is contained in:
parent
bf24014aa3
commit
96899c1ce2
@ -8,7 +8,7 @@
|
||||
|
||||
<body>
|
||||
<H1>Prospecting notes</H1>
|
||||
<div class="centre"><img alt="" src="/1626/i/2013-BL-01.jpg" />
|
||||
<div class="centre"><img alt="" src="../i/2013-BL-01.jpg" />
|
||||
</div>
|
||||
|
||||
<p>This is the complete sum total of the information we have,
|
||||
|
52
years/2013/logbook.html
Normal file → Executable file
52
years/2013/logbook.html
Normal file → Executable file
@ -14,7 +14,7 @@ maintain half a dozen parser functions.
|
||||
Sorry about all the crap that surrounds the image tags which has been imported along with the content
|
||||
when UK Caving blogs have been parsed.
|
||||
|
||||
Exported on 2023-11-04 18:11 using either the control panel webpage or when editing a logbook entry online
|
||||
Exported on 2023-11-23 17:11 using either the control panel webpage or when editing a logbook entry online
|
||||
See troggle/code/views/other.py and core.models/logbooks.py writelogbook(year, filename)
|
||||
-->
|
||||
<body>
|
||||
@ -390,7 +390,7 @@ this is the deepest part of Tunnocks at -397! Woo hoo! [smiley]
|
||||
|
||||
<div class="tripdate" id="2013-08-01a">2013-08-01</div>
|
||||
<div class="trippeople">OllyB, <u>Jenny</u>, </div>
|
||||
<div class="triptitle">Too Bold for This Spit</div>
|
||||
<div class="triptitle">107 - Too Bold for This Spit</div>
|
||||
<br /><br />Yet again back into sleepless and heading ever closer to KH. Took
|
||||
more rope, and the last of our hangers and the last drill battery to the
|
||||
pushing front. Rigged 2 short pitches with one longer rope and headed
|
||||
@ -468,7 +468,7 @@ walking.
|
||||
|
||||
<div class="tripdate" id="2013-08-02b">2013-08-02</div>
|
||||
<div class="trippeople">Holly, Chris D, <u>Anthony</u>, </div>
|
||||
<div class="triptitle">258 Pushing Determination</div>
|
||||
<div class="triptitle">Tunnocks - 258 Pushing Determination</div>
|
||||
<br /><br />Lured by tales of an ongoing spacious pitch series, I found myself heading off to Holly’s
|
||||
favourite lead at the far north of Tunnocks. After the usual tedium of the entrance series,
|
||||
a long sweaty uphill stromp through Flying High etc, we found ourselves staring at the start
|
||||
@ -526,8 +526,8 @@ bunde we made it back to top camp just before our callout.
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2013-08-03a">2013-08-03</div>
|
||||
<div class="trippeople"><u>Becka</u>, Matt, Chris D, Holly, </div>
|
||||
<div class="triptitle">Ants In Pants</div>
|
||||
<div class="trippeople">Matt, Chris D, Holly, <u>Becka</u>, </div>
|
||||
<div class="triptitle">2012-ns-01 - Ants In Pants</div>
|
||||
<br /><br />After a hot, heavy carry in the morning I rehydrated than headed off to 2012-NS-01 and
|
||||
surrounding holes with Chris + Matt. Chris watched Matt descend the furthest of four holes
|
||||
(#1) which led to a window into hole #2. </br>
|
||||
@ -569,12 +569,12 @@ journey.
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2013-08-04a">2013-08-04</div>
|
||||
<div class="trippeople"><u>Chris D</u>, Becka, Matt, </div>
|
||||
<div class="triptitle">Tunnocks – Procrastination – bolting the climb ‘Bring on the Clowns’</div>
|
||||
<div class="trippeople">Becka, Matt, <u>Chris D</u>, </div>
|
||||
<div class="triptitle">Tunnocks - Procrastination – bolting the climb ‘Bring on the Clowns’</div>
|
||||
<br /><br />Becka started bolting across the traverse from 31/7 to reach aven, then Chris took over
|
||||
while Matt froze in the gale. After some time I reached the top:</br>
|
||||
<img alt="Elevation and riging topo for Bring on the Clowns"
|
||||
src="logbkimg03.png">
|
||||
src="/years/2013/logbkimg03.png">
|
||||
|
||||
<br /><br />Stepping across the top to the passage at the top of the aven,
|
||||
initially all I could see was a body sized tube at the top of another
|
||||
@ -627,8 +627,8 @@ some new marks.
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2013-08-05a">2013-08-05</div>
|
||||
<div class="trippeople"><u>Holly</u>, Becka, Matt, Cameron, </div>
|
||||
<div class="triptitle">Antsinpantsschacht</div>
|
||||
<div class="trippeople">Becka, Matt, Cameron, <u>Holly</u>, </div>
|
||||
<div class="triptitle">2013-03 - Antsinpantsschacht</div>
|
||||
<br /><br />In the hunt for a new entrance to Tunnocks we headed to the area of plateau above the
|
||||
‘snow + leaves’ bit of Tunnocks (near Starfish Junction). A days prospecting 2 days before
|
||||
had identified a number of holes in the area of which Matt had already dropped a couple. Of
|
||||
@ -717,8 +717,8 @@ further tomorrow.
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2013-08-06a">2013-08-06</div>
|
||||
<div class="trippeople"><u>Chris D</u>, Anthony, </div>
|
||||
<div class="triptitle">258 Tunnocks – The Number of the Beast</div>
|
||||
<div class="trippeople">Anthony, <u>Chris D</u>, </div>
|
||||
<div class="triptitle">Tunnocks - The Number of the Beast</div>
|
||||
<br /><br />Dour + Chris took in over 100m rope to see what they could do with the pitch at the top
|
||||
of Bring on the Clowns. On the way in Chris put in a bolt to shift the Procrastination part
|
||||
II Y-hang one bolt over in an attempt to hand the rope out to dry after Becka’s exit on
|
||||
@ -889,8 +889,8 @@ then a further ~20-25m(??) to bottom. Hard to judge but 60m rope needed.
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2013-08-07a">2013-08-07</div>
|
||||
<div class="trippeople">Matt, <u>Becka</u>, Cameron, </div>
|
||||
<div class="triptitle">Tour of upper level Tunnocks + gear haul</div>
|
||||
<div class="trippeople">Matt, Cameron, <u>Becka</u>, </div>
|
||||
<div class="triptitle">Tunnocks - Tour of upper level Tunnocks + gear haul</div>
|
||||
<br /><br />Fetched the gear we’d dumped yesterday just beyond the boulder choke + tottered down
|
||||
Flying High to dump them at Starfish Junction. Left a tacklesack arrow for the others then
|
||||
up to the snow + leaves aven. I climbed up as far as the window in the main aven but way
|
||||
@ -967,8 +967,8 @@ wider.
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2013-08-10a">2013-08-10</div>
|
||||
<div class="trippeople"><u>Jenny</u>, Olly, Stuart, </div>
|
||||
<div class="triptitle">107</div>
|
||||
<div class="trippeople">Olly, Stuart, <u>Jenny</u>, </div>
|
||||
<div class="triptitle">107 - Lucky and stupid</div>
|
||||
<br /><br />It thunderstormed all night and was still raining in the morning so we altered our
|
||||
planned trip to land of confusion and decided to look at leads in Ropeless and
|
||||
Sleepless. The drill was at the pushing front so we were a bit limited. Headed to the end of
|
||||
@ -1017,8 +1017,8 @@ down further or 2) go up the inlet rift. We did the latter but ran out of rope.
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2013-08-11b">2013-08-11</div>
|
||||
<div class="trippeople">Olly, <u>Jenny</u>, Stuart, </div>
|
||||
<div class="triptitle">Surface Prospecting</div>
|
||||
<div class="trippeople">Olly, Stuart, <u>Jenny</u>, </div>
|
||||
<div class="triptitle">2012-SW-01, 2012-SW-02 - Surface Prospecting</div>
|
||||
<br /><br />My hip and neck were quite sore after a yesterday’s fall and Olly was also feeling tired,
|
||||
so we decided on a surface day. We started at laser5 and headed ~ parallel to the 204
|
||||
path but west of it.
|
||||
@ -1069,8 +1069,8 @@ src="/years/2013/logbkimg12.png"></br>
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2013-08-12b">2013-08-12</div>
|
||||
<div class="trippeople">Olly, <u>Jenny</u>, Stuart, </div>
|
||||
<div class="triptitle">107 China</div>
|
||||
<div class="trippeople">Olly, Stuart, <u>Jenny</u>, </div>
|
||||
<div class="triptitle">107 - China</div>
|
||||
<br /><br /> Set off to Land of Confusion hoping to find ourselves in KH by the end of the trip. Got
|
||||
to Land of Confusion fairly efficiently, Olly set off to rig the pitch at the end while
|
||||
Stuart and I surveyed leads on the west of the passage. The first went along a little rift
|
||||
@ -1117,8 +1117,8 @@ of Stuart’s previous longest trip!
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2013-08-13a">2013-08-13</div>
|
||||
<div class="trippeople"><u>Fleur</u>, Tom Clayton, </div>
|
||||
<div class="triptitle">Tunnocks, West Side Story – "Clayton’s Cock-up"</div>
|
||||
<div class="trippeople">Tom Clayton, <u>Fleur</u>, </div>
|
||||
<div class="triptitle">Tunnocks - West Side Story – "Clayton’s Cock-up"</div>
|
||||
<br /><br />After a day of research following the expo dinner I had spotted a QMA at the end of West
|
||||
Side Story at String Theory/Fellows level. The survey notes reported an undescended p20 with
|
||||
a passage visible beyond. My plan was to take Tom down there and get him bolting.
|
||||
@ -1169,8 +1169,8 @@ appears to be at least one poor surface survey in this region.
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2013-08-14a">2013-08-14</div>
|
||||
<div class="trippeople"><u>Fleur</u>, Tom, Pete, </div>
|
||||
<div class="triptitle">Tunnocks, West Side Story – Bacm Bccm Afridi</div>
|
||||
<div class="trippeople">Tom, Pete, <u>Fleur</u>, </div>
|
||||
<div class="triptitle">Tunnocks - West Side Story – Bacm Bccm Afridi</div>
|
||||
<br /><br />This time hiltis were stashed in multiple locations and Clayton’s Cock-up was
|
||||
conquered. However the other side just led to a brief rocky bridge and more holes in a
|
||||
massive drafty hading rift. So instead we went down the first hole (Thus avoiding the nasty
|
||||
@ -1227,8 +1227,8 @@ src="/years/2013/logbkimg16.png"></div></br>
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2013-08-15a">2013-08-15</div>
|
||||
<div class="trippeople"><u>Jenny</u>, Olly, Stuart, </div>
|
||||
<div class="triptitle">107 final derig – Wonderland survey</div>
|
||||
<div class="trippeople">Olly, Stuart, <u>Jenny</u>, </div>
|
||||
<div class="triptitle">107 - final derig – Wonderland survey</div>
|
||||
<br /><br />Stuart rejoined us for the final derig. Got the gear to ropeless junction and had a quick
|
||||
side trip to show Stuart Wonderland and look at the roof tube there. Frustratingly after
|
||||
getting all the gear in, the fully charged, unused drill battery did half a hole. I
|
||||
|
Loading…
Reference in New Issue
Block a user