This is the complete sum total of the information we have, diff --git a/years/2013/logbook.html b/years/2013/logbook.html old mode 100644 new mode 100755 index 47cdf8552..7886b8478 --- a/years/2013/logbook.html +++ b/years/2013/logbook.html @@ -14,7 +14,7 @@ maintain half a dozen parser functions. Sorry about all the crap that surrounds the image tags which has been imported along with the content when UK Caving blogs have been parsed. -Exported on 2023-11-04 18:11 using either the control panel webpage or when editing a logbook entry online +Exported on 2023-11-23 17:11 using either the control panel webpage or when editing a logbook entry online See troggle/code/views/other.py and core.models/logbooks.py writelogbook(year, filename) --> @@ -390,7 +390,7 @@ this is the deepest part of Tunnocks at -397! Woo hoo! [smiley]

2013-08-01
OllyB, Jenny,
-
Too Bold for This Spit
+
107 - Too Bold for This Spit


Yet again back into sleepless and heading ever closer to KH. Took more rope, and the last of our hangers and the last drill battery to the pushing front. Rigged 2 short pitches with one longer rope and headed @@ -468,7 +468,7 @@ walking.
2013-08-02
Holly, Chris D, Anthony,
-
258 Pushing Determination
+
Tunnocks - 258 Pushing Determination


Lured by tales of an ongoing spacious pitch series, I found myself heading off to Holly’s favourite lead at the far north of Tunnocks. After the usual tedium of the entrance series, a long sweaty uphill stromp through Flying High etc, we found ourselves staring at the start @@ -526,8 +526,8 @@ bunde we made it back to top camp just before our callout.
2013-08-03
-
Becka, Matt, Chris D, Holly,
-
Ants In Pants
+
Matt, Chris D, Holly, Becka,
+
2012-ns-01 - Ants In Pants


After a hot, heavy carry in the morning I rehydrated than headed off to 2012-NS-01 and surrounding holes with Chris + Matt. Chris watched Matt descend the furthest of four holes (#1) which led to a window into hole #2.
@@ -569,12 +569,12 @@ journey.
2013-08-04
-
Chris D, Becka, Matt,
-
Tunnocks – Procrastination – bolting the climb ‘Bring on the Clowns’
+
Becka, Matt, Chris D,
+
Tunnocks - Procrastination – bolting the climb ‘Bring on the Clowns’


Becka started bolting across the traverse from 31/7 to reach aven, then Chris took over while Matt froze in the gale. After some time I reached the top:
Elevation and riging topo for Bring on the Clowns +src="/years/2013/logbkimg03.png">

Stepping across the top to the passage at the top of the aven, initially all I could see was a body sized tube at the top of another @@ -627,8 +627,8 @@ some new marks.
2013-08-05
-
Holly, Becka, Matt, Cameron,
-
Antsinpantsschacht
+
Becka, Matt, Cameron, Holly,
+
2013-03 - Antsinpantsschacht


In the hunt for a new entrance to Tunnocks we headed to the area of plateau above the ‘snow + leaves’ bit of Tunnocks (near Starfish Junction). A days prospecting 2 days before had identified a number of holes in the area of which Matt had already dropped a couple. Of @@ -717,8 +717,8 @@ further tomorrow.
2013-08-06
-
Chris D, Anthony,
-
258 Tunnocks – The Number of the Beast
+
Anthony, Chris D,
+
Tunnocks - The Number of the Beast


Dour + Chris took in over 100m rope to see what they could do with the pitch at the top of Bring on the Clowns. On the way in Chris put in a bolt to shift the Procrastination part II Y-hang one bolt over in an attempt to hand the rope out to dry after Becka’s exit on @@ -889,8 +889,8 @@ then a further ~20-25m(??) to bottom. Hard to judge but 60m rope needed.
2013-08-07
-
Matt, Becka, Cameron,
-
Tour of upper level Tunnocks + gear haul
+
Matt, Cameron, Becka,
+
Tunnocks - Tour of upper level Tunnocks + gear haul


Fetched the gear we’d dumped yesterday just beyond the boulder choke + tottered down Flying High to dump them at Starfish Junction. Left a tacklesack arrow for the others then up to the snow + leaves aven. I climbed up as far as the window in the main aven but way @@ -967,8 +967,8 @@ wider.
2013-08-10
-
Jenny, Olly, Stuart,
-
107
+
Olly, Stuart, Jenny,
+
107 - Lucky and stupid


It thunderstormed all night and was still raining in the morning so we altered our planned trip to land of confusion and decided to look at leads in Ropeless and Sleepless. The drill was at the pushing front so we were a bit limited. Headed to the end of @@ -1017,8 +1017,8 @@ down further or 2) go up the inlet rift. We did the latter but ran out of rope.
2013-08-11
-
Olly, Jenny, Stuart,
-
Surface Prospecting
+
Olly, Stuart, Jenny,
+
2012-SW-01, 2012-SW-02 - Surface Prospecting


My hip and neck were quite sore after a yesterday’s fall and Olly was also feeling tired, so we decided on a surface day. We started at laser5 and headed ~ parallel to the 204 path but west of it. @@ -1069,8 +1069,8 @@ src="/years/2013/logbkimg12.png">

2013-08-12
-
Olly, Jenny, Stuart,
-
107 China
+
Olly, Stuart, Jenny,
+
107 - China


Set off to Land of Confusion hoping to find ourselves in KH by the end of the trip. Got to Land of Confusion fairly efficiently, Olly set off to rig the pitch at the end while Stuart and I surveyed leads on the west of the passage. The first went along a little rift @@ -1117,8 +1117,8 @@ of Stuart’s previous longest trip!
2013-08-13
-
Fleur, Tom Clayton,
-
Tunnocks, West Side Story – "Clayton’s Cock-up"
+
Tom Clayton, Fleur,
+
Tunnocks - West Side Story – "Clayton’s Cock-up"


After a day of research following the expo dinner I had spotted a QMA at the end of West Side Story at String Theory/Fellows level. The survey notes reported an undescended p20 with a passage visible beyond. My plan was to take Tom down there and get him bolting. @@ -1169,8 +1169,8 @@ appears to be at least one poor surface survey in this region.
2013-08-14
-
Fleur, Tom, Pete,
-
Tunnocks, West Side Story – Bacm Bccm Afridi
+
Tom, Pete, Fleur,
+
Tunnocks - West Side Story – Bacm Bccm Afridi


This time hiltis were stashed in multiple locations and Clayton’s Cock-up was conquered. However the other side just led to a brief rocky bridge and more holes in a massive drafty hading rift. So instead we went down the first hole (Thus avoiding the nasty @@ -1227,8 +1227,8 @@ src="/years/2013/logbkimg16.png">


2013-08-15
-
Jenny, Olly, Stuart,
-
107 final derig – Wonderland survey
+
Olly, Stuart, Jenny,
+
107 - final derig – Wonderland survey


Stuart rejoined us for the final derig. Got the gear to ropeless junction and had a quick side trip to show Stuart Wonderland and look at the roof tube there. Frustratingly after getting all the gear in, the fully charged, unused drill battery did half a hole. I