Online edit of cave 1626-359
This commit is contained in:
parent
125de113dd
commit
72f930fa04
@ -113,41 +113,37 @@ down and one short pitch up in 2019; extensively rerigged in 2023; problems with
|
||||
drops down to the base of a large meander then lands on a ledge. From
|
||||
the ledge, two short hangs lead to a very exposed stance below which
|
||||
the continuing meander bells out into a large free hanging rift
|
||||
pitch, <b>Grommit</b> (p55). (<i>Traversing S along the walls of the
|
||||
</i><i><b>Grommit</b></i><i> is likely to gain entry to the upstream
|
||||
continuation of </i><i><b>The Second Coming; </b></i><i>this is QMA
|
||||
2019-12A). </i>Around 10m from the base of Grommit pitch it is
|
||||
pitch, <b>Grommit</b> (p55). <i>Traversing S along the walls of <b>Grommit</b> is likely to gain entry to the upstream
|
||||
continuation of <b>The Second Coming; </b>this is QMA 2019-12A). </i>.
|
||||
|
||||
<p>Around 10m from the base of Grommit pitch it is
|
||||
possible to swing onto a ledge on the W wall (this is awkward to rig;
|
||||
the easiest option is to descend to the base of the pitch and climb
|
||||
up the wall protected with jammers on the pitch rope). Traversing
|
||||
along the ledge leads to an abandoned meander with a very strong
|
||||
outward draft. A short p5 N at PT03 at the far end of the traverse
|
||||
drops down to the start of <b>The Second Coming. whilst a p8 up from PT03 to a small phreatic tube on the R leads to <b>Propane
|
||||
Nightmares). </b> </p>
|
||||
drops down to the start of <b>The Second Coming</b> whilst a p8 up from PT03 to a small phreatic tube on the R leads to <b>Propane Nightmares.</b></p>
|
||||
|
||||
<p> <i>Continuing
|
||||
to the bottom of ><b>Grommit </b>lands on a rock floor
|
||||
<p> <i>Continuing to the bottom of ><b>Grommit </b>lands on a rock floor
|
||||
with a vadose trench and a stream in the bottom. This leads via a p10
|
||||
to a short series of narrow tubes which end in tight sumps and
|
||||
chokes.</i></p>
|
||||
|
||||
<H3>The Second Coming</H3>
|
||||
|
||||
<p><b>The Second Coming
|
||||
</b>starts below the p5 N of PT03 (which is at the end of the
|
||||
<p><b>The Second Coming</b> starts below the p5 N of PT03 (which is at the end of the
|
||||
traverse from the Entrance Series). The passage continues as a very drafty phreatic
|
||||
tube with a vadose trench to quickly reach a junction at PT04.
|
||||
(<i>Heading L at this junction leads to </i><i><b>Hobnob Hallway</b></i><i>
|
||||
(described in a separate section below). </i>Continuing directly NE
|
||||
along <b>The Second Coming </b>the passage immediately passes a small
|
||||
(<i>Heading L at this junction leads to <b>Hobnob Hallway</b> (described separately below). </i>Continuing directly NE
|
||||
along <b>The Second Coming</b> the passage immediately passes a small
|
||||
L passage (<i>this immediately goes to a junction. Here, L oxbows
|
||||
down Kitkat Connection straight back to Hobnob Hallway whilst R goes
|
||||
to a passage which eventually connects back in to The Second Coming at PT05). </i>After a further
|
||||
down <b>Kitkat Connection</b> straight back to <b>Hobnob Hallway</b> whilst R goes
|
||||
to a passage which eventually connects back in to <b>The Second Coming</b> at PT05). </i>After a further
|
||||
section of straight, high rift to the NE it quickly reaches a junction at
|
||||
PT05 with a large, abandoned meander. (<i>Dropping down 3m to the floor here and heading back L heads SW. The roof gradually lowers - passing a
|
||||
junction on the L that goes to Kitkat Connection - until a high aven
|
||||
junction on the L that goes to <b>Kitkat Connection</b> - until a high aven
|
||||
with a flowstone floor is reached. Beyond this aven a short section
|
||||
of passage leads to a series of holes that may still be QMs after 2024 (2018-10C, 2018-11B, 2018-11A. Continuing SW leads via a 15m drop to a further connection with Hobnob Hallway with several avens in the connection area.</i></p>
|
||||
of passage leads to a series of holes that may still be QMs after 2024 (2018-10C, 2018-11B, 2018-11A. Continuing SW leads via a 15m drop to a further connection with <b>Hobnob Hallway</b> with several avens in the connection area.</i></p>
|
||||
|
||||
<p>From PT05, heading
|
||||
‘upstream’ (though there is not always any water flowing) from
|
||||
|