URLs to images fixed

This commit is contained in:
Philip Sargent 2023-02-28 17:40:09 +00:00
parent 108ef80377
commit e3016fde6a

View File

@ -370,7 +370,7 @@ carefully passed rigging items back and forth to each other in order to
not drop them down the ptich (we were nicely wedged above the pitch, but not drop them down the ptich (we were nicely wedged above the pitch, but
smaller items would fall all the way to the floor). Mike beautifully smaller items would fall all the way to the floor). Mike beautifully
rigged the pitch as follows <img alt="riging topo of pitch beyond the rigged the pitch as follows <img alt="riging topo of pitch beyond the
flap" src="logbkimg01.png">.</p> flap" src="/years/2013/logbkimg01.png">.</p>
<p>A 39m rope was used, however Mike had to 'elastic band' the rope between <p>A 39m rope was used, however Mike had to 'elastic band' the rope between
the Y-hang + the rebelay in order to reach the floor. At the bottom the Y-hang + the rebelay in order to reach the floor. At the bottom
@ -410,7 +410,7 @@ Determination Series is getting close to the level of the horizontal development
bottom of String Theory.</p> bottom of String Theory.</p>
<img alt="riging topo - 2nd pitch of Determination" <img alt="riging topo - 2nd pitch of Determination"
src="logbkimg02.png"> src="/years/2013/logbkimg02.png">
<p>With that, it was time to do battle with The Flap/ again. This time, Holly had to <p>With that, it was time to do battle with The Flap/ again. This time, Holly had to
perform an overtaking manoeuvre in the rift in order to show me how it should be done. With perform an overtaking manoeuvre in the rift in order to show me how it should be done. With
@ -482,7 +482,7 @@ back after back after a few meters, but a too exposed climb at the end
soon saw Becka back thritching up to the body sized tube it all soon saw Becka back thritching up to the body sized tube it all
reconnected up with the zig zag at the head if a big pitch: </br> reconnected up with the zig zag at the head if a big pitch: </br>
<img alt="Plan Sketch" <img alt="Plan Sketch"
src="logbkimg04.png"></p> src="/years/2013/logbkimg04.png"></p>
<p>At ca. 6:30pm as Becka was prussicking up lower Procrastination pitch there was a sudden <p>At ca. 6:30pm as Becka was prussicking up lower Procrastination pitch there was a sudden
roar and a waterfall appeared. Chris looked down in horror from pitch above and a little roar and a waterfall appeared. Chris looked down in horror from pitch above and a little
@ -505,7 +505,7 @@ reasonable rig up Bring on the Clowns. Anthony begin rigging the pitch down at t
the wind. Some 30m down he met the wall of the shaft. So came nack up and Chris went down the wind. Some 30m down he met the wall of the shaft. So came nack up and Chris went down
with the drill and thrubolts (having run out of Hiltis 2 days ago).</br> with the drill and thrubolts (having run out of Hiltis 2 days ago).</br>
<img alt="elv/rigging guide of The Number of the Beast" <img alt="elv/rigging guide of The Number of the Beast"
src="logbkimg05.png"></p> src="/years/2013/logbkimg05.png"></p>
<p>* Dour: "Can you remember those numbers while I get my book out?"</br> <p>* Dour: "Can you remember those numbers while I get my book out?"</br>
Chris: "Maybe. Distance 6.66, Clino +66, Ooer!"</p> Chris: "Maybe. Distance 6.66, Clino +66, Ooer!"</p>
@ -587,7 +587,7 @@ numb I couldnt concentrate on anything other than the burning sunshine awaiti
outside. Once we were out + the survey was complete we lay in the sunshine drying out and outside. Once we were out + the survey was complete we lay in the sunshine drying out and
reflecting on what a shame it was that there is still no way through.</br> reflecting on what a shame it was that there is still no way through.</br>
<img alt="Rigging Guide" <img alt="Rigging Guide"
src="logbkimg06.png"></p> src="/years/2013/logbkimg06.png"></p>
<div class="timeug">T/U: 4hrs?</div> <div class="timeug">T/U: 4hrs?</div>
@ -600,7 +600,7 @@ src="logbkimg06.png"></p>
part of the system. No major comments for the journey in except that Ill quote Becka who part of the system. No major comments for the journey in except that Ill quote Becka who
said the following about the Flap (rift): “this is lovely” Yes thats right my rift is said the following about the Flap (rift): “this is lovely” Yes thats right my rift is
lovely! Ha! Youre all wimps!<img alt="Smiley" lovely! Ha! Youre all wimps!<img alt="Smiley"
src="logbkimg07.png"></p> src="/years/2013/logbkimg07.png"></p>
[Ed: One para crossed out] (Sorry this didn't make sense! It's too early after expo dinner) [Ed: One para crossed out] (Sorry this didn't make sense! It's too early after expo dinner)
@ -635,7 +635,7 @@ cave). Becka had done the rift 3 times lugging the bags through!</p>
<p>The three of us managed to drag the bafs to March of the Penguins where we then dumped <p>The three of us managed to drag the bafs to March of the Penguins where we then dumped
some weight to collect another day &amp; also make our call out!</br> some weight to collect another day &amp; also make our call out!</br>
<img alt="rigging diagram" <img alt="rigging diagram"
src="logbkimg08.png"></p> src="/years/2013/logbkimg08.png"></p>
<p>[Trip dated 3rd in Logbook, but 6th in callout book and survey data: 3rd must be a mistake]</p> <p>[Trip dated 3rd in Logbook, but 6th in callout book and survey data: 3rd must be a mistake]</p>
@ -708,7 +708,7 @@ out and slowly caved back to outside.</p>
Estimated lengths by CD. Please amend on derig! Chris Estimated lengths by CD. Please amend on derig! Chris
</br> </br>
<img alt="String Theory Rigging Guide" <img alt="String Theory Rigging Guide"
src="logbkimg09.png"> src="/years/2013/logbkimg09.png">
<h2>For the Bad Aussee rag:</h2> <h2>For the Bad Aussee rag:</h2>
@ -762,7 +762,7 @@ wider.</p>
surrounding holes with Chris + Matt. Chris watched Matt descend the furthest of four holes surrounding holes with Chris + Matt. Chris watched Matt descend the furthest of four holes
(#1) which led to a window into hole #2. </br> (#1) which led to a window into hole #2. </br>
<img alt="Plan of holes layout" <img alt="Plan of holes layout"
src="logbkimg10.png"></br>Meanwhile Holly + I found hole #4 which turned src="/years/2013/logbkimg10.png"></br>Meanwhile Holly + I found hole #4 which turned
out to have been tagged by Noel last year [[see image above]]. Holly dropped her sunglasses down onto the snow out to have been tagged by Noel last year [[see image above]]. Holly dropped her sunglasses down onto the snow
bank in it so I climbed down a bit to fetch them + there was definitely a cool cave breeze bank in it so I climbed down a bit to fetch them + there was definitely a cool cave breeze
coming out quite strongly. Matt then rigged #4 + he + I went down but this just led to a coming out quite strongly. Matt then rigged #4 + he + I went down but this just led to a
@ -800,7 +800,7 @@ be a long term dig needing capping perhaps.</p>
<p> <p>
<img alt="Matts hand-bolted hole" <img alt="Matts hand-bolted hole"
src="logbkimg11.png"></p> src="/years/2013/logbkimg11.png"></p>
<p>The team was being toasted by hot sun, and beginning to wander in small circles. This was <p>The team was being toasted by hot sun, and beginning to wander in small circles. This was
in area in line between a prominent dead tree and of a snow pole. Matts pit was somewhat in area in line between a prominent dead tree and of a snow pole. Matts pit was somewhat
@ -950,7 +950,7 @@ immediately to another pitch. A partial descent was made but no more drill batte
Pete &amp; Cameron returned 13th August, but made little more progress Pete &amp; Cameron returned 13th August, but made little more progress
having forgotten the drill bit...... But it remains ongiong + great having forgotten the drill bit...... But it remains ongiong + great
draught. <br /><img alt="Rigging diagram of DOWN GRADE" draught. <br /><img alt="Rigging diagram of DOWN GRADE"
src="logbkimg12.png"></br> src="/years/2013/logbkimg12.png"></br>
<hr /> <hr />
<div class="tripdate" id="t2013-08-13a">2013-08-13</div> <div class="tripdate" id="t2013-08-13a">2013-08-13</div>
@ -991,7 +991,7 @@ close together).</p>
<div class="timeug">T/U: 10hrs</div> <div class="timeug">T/U: 10hrs</div>
<br /><img alt="Rigging topo for Clayton's Cock-up" <br /><img alt="Rigging topo for Clayton's Cock-up"
src="logbkimg13.png" width="75%" height="50%"></br> src="/years/2013/logbkimg13.png" width="75%" height="50%"></br>
<hr /> <hr />
<div class="tripdate" id="t2013-08-13b">2013-08-13</div> <div class="tripdate" id="t2013-08-13b">2013-08-13</div>
@ -1003,7 +1003,7 @@ everything but a drill bit. Unable to fashion one from Mars bars or limestone th
manage to drop an extra pitch on a natural. This involved getting wet in spray from small manage to drop an extra pitch on a natural. This involved getting wet in spray from small
stream so only Pete descended. He landed in pretty wide rift. An easy 2m climb led to a stream so only Pete descended. He landed in pretty wide rift. An easy 2m climb led to a
further 10-15m pitch which is undescended. <br /><img alt="Rigging guide/elevation" further 10-15m pitch which is undescended. <br /><img alt="Rigging guide/elevation"
src="logbkimg14.png"></br> src="/years/2013/logbkimg14.png"></br>
The team then derigged. </p> The team then derigged. </p>
@ -1156,7 +1156,7 @@ attempts. Sadly the spike then came down the pitch, so the lead is still going
derigging + hauled the 6 bags up the entrance pitch and carted them back to camp. There derigging + hauled the 6 bags up the entrance pitch and carted them back to camp. There
are a lot of great leads in 107 and possible connections with 101 and 76 still to be are a lot of great leads in 107 and possible connections with 101 and 76 still to be
found. If only expo lasted longer.<p>Below is the rigging guide found in the logbook, but a beautiful PDF version can now be found <a href="http://survex.com/~olly/107rigging2013.pdf">here</a>.</p><br /><img alt="2013 rigging guide for 107" found. If only expo lasted longer.<p>Below is the rigging guide found in the logbook, but a beautiful PDF version can now be found <a href="http://survex.com/~olly/107rigging2013.pdf">here</a>.</p><br /><img alt="2013 rigging guide for 107"
src="logbkimg15.png"></br></p> src="/years/2013/logbkimg15.png"></br></p>
<div class="timeug">T/U: 6hrs</div> <div class="timeug">T/U: 6hrs</div>
<hr /> <hr />
@ -1173,7 +1173,7 @@ the rope was able to hang nearer the window allowing a swing across to it. Time
by then so exploring the continuing passage was left for the next day. </p> by then so exploring the continuing passage was left for the next day. </p>
<br /><div style="text-align: center"><img alt="Rigging Guide" <br /><div style="text-align: center"><img alt="Rigging Guide"
src="logbkimg16.png"></div></br> src="/years/2013/logbkimg16.png"></div></br>
<hr /> <hr />
<div class="tripdate" id="t2013-08-15b">2013-08-15</div> <div class="tripdate" id="t2013-08-15b">2013-08-15</div>
@ -1217,7 +1217,7 @@ traverse and was confirmed as such when the traverse was found from the other di
<p>Both of the tubes (Double barrel passage) had a small rift in the floor which is believed <p>Both of the tubes (Double barrel passage) had a small rift in the floor which is believed
to drop to a lower level, the best place to drop this would probably be the traverse in the to drop to a lower level, the best place to drop this would probably be the traverse in the
second tube mentioned above.<div style="text-align: center"><br /><img alt="Rigging guide" second tube mentioned above.<div style="text-align: center"><br /><img alt="Rigging guide"
src="logbkimg17.png"></br></div></p> src="/years/2013/logbkimg17.png"></br></div></p>
<div class="timeug">T/U: 12hrs</div> <div class="timeug">T/U: 12hrs</div>
@ -1233,7 +1233,7 @@ clean washed aven and downstream a series of boulder climbs. A possible lead was
halfway up the wall in the chamber above the pitch. This would require a traverse or a climb halfway up the wall in the chamber above the pitch. This would require a traverse or a climb
or possibly a tube on the left of the passage above this chamber might give slightly easier or possibly a tube on the left of the passage above this chamber might give slightly easier
access. Then derigged Tunnocks entrance and caramel Catharsis.<br /><img alt="Rigging guide" access. Then derigged Tunnocks entrance and caramel Catharsis.<br /><img alt="Rigging guide"
src="logbkimg18.png"></br></p> src="/years/2013/logbkimg18.png"></br></p>
<div class="timeug">T/U: 6hrs 30</div> <div class="timeug">T/U: 6hrs 30</div>
<hr /></body></html> <hr /></body></html>