mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2024-11-25 08:41:54 +00:00
URLs to images fixed
This commit is contained in:
parent
108ef80377
commit
e3016fde6a
@ -370,7 +370,7 @@ carefully passed rigging items back and forth to each other in order to
|
|||||||
not drop them down the ptich (we were nicely wedged above the pitch, but
|
not drop them down the ptich (we were nicely wedged above the pitch, but
|
||||||
smaller items would fall all the way to the floor). Mike beautifully
|
smaller items would fall all the way to the floor). Mike beautifully
|
||||||
rigged the pitch as follows <img alt="riging topo of pitch beyond the
|
rigged the pitch as follows <img alt="riging topo of pitch beyond the
|
||||||
flap" src="logbkimg01.png">.</p>
|
flap" src="/years/2013/logbkimg01.png">.</p>
|
||||||
|
|
||||||
<p>A 39m rope was used, however Mike had to 'elastic band' the rope between
|
<p>A 39m rope was used, however Mike had to 'elastic band' the rope between
|
||||||
the Y-hang + the rebelay in order to reach the floor. At the bottom
|
the Y-hang + the rebelay in order to reach the floor. At the bottom
|
||||||
@ -410,7 +410,7 @@ Determination Series is getting close to the level of the horizontal development
|
|||||||
bottom of String Theory.</p>
|
bottom of String Theory.</p>
|
||||||
|
|
||||||
<img alt="riging topo - 2nd pitch of Determination"
|
<img alt="riging topo - 2nd pitch of Determination"
|
||||||
src="logbkimg02.png">
|
src="/years/2013/logbkimg02.png">
|
||||||
|
|
||||||
<p>With that, it was time to do battle with ‘The Flap/ again. This time, Holly had to
|
<p>With that, it was time to do battle with ‘The Flap/ again. This time, Holly had to
|
||||||
perform an overtaking manoeuvre in the rift in order to show me how it should be done. With
|
perform an overtaking manoeuvre in the rift in order to show me how it should be done. With
|
||||||
@ -482,7 +482,7 @@ back after back after a few meters, but a too exposed climb at the end
|
|||||||
soon saw Becka back thritching up to the body sized tube – it all
|
soon saw Becka back thritching up to the body sized tube – it all
|
||||||
reconnected up with the zig zag at the head if a big pitch: </br>
|
reconnected up with the zig zag at the head if a big pitch: </br>
|
||||||
<img alt="Plan Sketch"
|
<img alt="Plan Sketch"
|
||||||
src="logbkimg04.png"></p>
|
src="/years/2013/logbkimg04.png"></p>
|
||||||
|
|
||||||
<p>At ca. 6:30pm as Becka was prussicking up lower Procrastination pitch there was a sudden
|
<p>At ca. 6:30pm as Becka was prussicking up lower Procrastination pitch there was a sudden
|
||||||
roar and a waterfall appeared. Chris looked down in horror from pitch above and a little
|
roar and a waterfall appeared. Chris looked down in horror from pitch above and a little
|
||||||
@ -505,7 +505,7 @@ reasonable rig up Bring on the Clowns. Anthony begin rigging the pitch down at t
|
|||||||
the wind. Some 30m down he met the wall of the shaft. So came nack up and Chris went down
|
the wind. Some 30m down he met the wall of the shaft. So came nack up and Chris went down
|
||||||
with the drill and thrubolts (having run out of Hiltis 2 days ago).</br>
|
with the drill and thrubolts (having run out of Hiltis 2 days ago).</br>
|
||||||
<img alt="elv/rigging guide of The Number of the Beast"
|
<img alt="elv/rigging guide of The Number of the Beast"
|
||||||
src="logbkimg05.png"></p>
|
src="/years/2013/logbkimg05.png"></p>
|
||||||
|
|
||||||
<p>* Dour: "Can you remember those numbers while I get my book out?"</br>
|
<p>* Dour: "Can you remember those numbers while I get my book out?"</br>
|
||||||
Chris: "Maybe. Distance 6.66, Clino +66, Ooer!"</p>
|
Chris: "Maybe. Distance 6.66, Clino +66, Ooer!"</p>
|
||||||
@ -587,7 +587,7 @@ numb I couldn’t concentrate on anything other than the burning sunshine awaiti
|
|||||||
outside. Once we were out + the survey was complete we lay in the sunshine drying out and
|
outside. Once we were out + the survey was complete we lay in the sunshine drying out and
|
||||||
reflecting on what a shame it was that there is still no way through.</br>
|
reflecting on what a shame it was that there is still no way through.</br>
|
||||||
<img alt="Rigging Guide"
|
<img alt="Rigging Guide"
|
||||||
src="logbkimg06.png"></p>
|
src="/years/2013/logbkimg06.png"></p>
|
||||||
|
|
||||||
<div class="timeug">T/U: 4hrs?</div>
|
<div class="timeug">T/U: 4hrs?</div>
|
||||||
|
|
||||||
@ -600,7 +600,7 @@ src="logbkimg06.png"></p>
|
|||||||
part of the system. No major comments for the journey in except that I’ll quote Becka who
|
part of the system. No major comments for the journey in except that I’ll quote Becka who
|
||||||
said the following about the Flap (rift): “this is lovely” – Yes that’s right – my rift is
|
said the following about the Flap (rift): “this is lovely” – Yes that’s right – my rift is
|
||||||
lovely! Ha! You’re all wimps!<img alt="Smiley"
|
lovely! Ha! You’re all wimps!<img alt="Smiley"
|
||||||
src="logbkimg07.png"></p>
|
src="/years/2013/logbkimg07.png"></p>
|
||||||
|
|
||||||
[Ed: One para crossed out] (Sorry this didn't make sense! It's too early after expo dinner)
|
[Ed: One para crossed out] (Sorry this didn't make sense! It's too early after expo dinner)
|
||||||
|
|
||||||
@ -635,7 +635,7 @@ cave). Becka had done the rift 3 times lugging the bags through!</p>
|
|||||||
<p>The three of us managed to drag the bafs to March of the Penguins where we then dumped
|
<p>The three of us managed to drag the bafs to March of the Penguins where we then dumped
|
||||||
some weight to collect another day & also make our call out!</br>
|
some weight to collect another day & also make our call out!</br>
|
||||||
<img alt="rigging diagram"
|
<img alt="rigging diagram"
|
||||||
src="logbkimg08.png"></p>
|
src="/years/2013/logbkimg08.png"></p>
|
||||||
|
|
||||||
<p>[Trip dated 3rd in Logbook, but 6th in callout book and survey data: 3rd must be a mistake]</p>
|
<p>[Trip dated 3rd in Logbook, but 6th in callout book and survey data: 3rd must be a mistake]</p>
|
||||||
|
|
||||||
@ -708,7 +708,7 @@ out and slowly caved back to outside.</p>
|
|||||||
Estimated lengths by CD. Please amend on derig! Chris
|
Estimated lengths by CD. Please amend on derig! Chris
|
||||||
</br>
|
</br>
|
||||||
<img alt="String Theory Rigging Guide"
|
<img alt="String Theory Rigging Guide"
|
||||||
src="logbkimg09.png">
|
src="/years/2013/logbkimg09.png">
|
||||||
|
|
||||||
<h2>For the Bad Aussee rag:</h2>
|
<h2>For the Bad Aussee rag:</h2>
|
||||||
|
|
||||||
@ -762,7 +762,7 @@ wider.</p>
|
|||||||
surrounding holes with Chris + Matt. Chris watched Matt descend the furthest of four holes
|
surrounding holes with Chris + Matt. Chris watched Matt descend the furthest of four holes
|
||||||
(#1) which led to a window into hole #2. </br>
|
(#1) which led to a window into hole #2. </br>
|
||||||
<img alt="Plan of holes layout"
|
<img alt="Plan of holes layout"
|
||||||
src="logbkimg10.png"></br>Meanwhile Holly + I found hole #4 which turned
|
src="/years/2013/logbkimg10.png"></br>Meanwhile Holly + I found hole #4 which turned
|
||||||
out to have been tagged by Noel last year [[see image above]]. Holly dropped her sunglasses down onto the snow
|
out to have been tagged by Noel last year [[see image above]]. Holly dropped her sunglasses down onto the snow
|
||||||
bank in it so I climbed down a bit to fetch them + there was definitely a cool cave breeze
|
bank in it so I climbed down a bit to fetch them + there was definitely a cool cave breeze
|
||||||
coming out quite strongly. Matt then rigged #4 + he + I went down but this just led to a
|
coming out quite strongly. Matt then rigged #4 + he + I went down but this just led to a
|
||||||
@ -800,7 +800,7 @@ be a long term dig – needing capping perhaps.</p>
|
|||||||
|
|
||||||
<p>
|
<p>
|
||||||
<img alt="Matt’s hand-bolted hole"
|
<img alt="Matt’s hand-bolted hole"
|
||||||
src="logbkimg11.png"></p>
|
src="/years/2013/logbkimg11.png"></p>
|
||||||
|
|
||||||
<p>The team was being toasted by hot sun, and beginning to wander in small circles. This was
|
<p>The team was being toasted by hot sun, and beginning to wander in small circles. This was
|
||||||
in area in line between a ‘prominent dead tree’ and of a snow pole. Matt’s pit was somewhat
|
in area in line between a ‘prominent dead tree’ and of a snow pole. Matt’s pit was somewhat
|
||||||
@ -950,7 +950,7 @@ immediately to another pitch. A partial descent was made but no more drill batte
|
|||||||
Pete & Cameron returned 13th August, but made little more progress
|
Pete & Cameron returned 13th August, but made little more progress
|
||||||
having forgotten the drill bit...... But it remains ongiong + great
|
having forgotten the drill bit...... But it remains ongiong + great
|
||||||
draught. <br /><img alt="Rigging diagram of DOWN GRADE"
|
draught. <br /><img alt="Rigging diagram of DOWN GRADE"
|
||||||
src="logbkimg12.png"></br>
|
src="/years/2013/logbkimg12.png"></br>
|
||||||
|
|
||||||
<hr />
|
<hr />
|
||||||
<div class="tripdate" id="t2013-08-13a">2013-08-13</div>
|
<div class="tripdate" id="t2013-08-13a">2013-08-13</div>
|
||||||
@ -991,7 +991,7 @@ close together).</p>
|
|||||||
<div class="timeug">T/U: 10hrs</div>
|
<div class="timeug">T/U: 10hrs</div>
|
||||||
|
|
||||||
<br /><img alt="Rigging topo for Clayton's Cock-up"
|
<br /><img alt="Rigging topo for Clayton's Cock-up"
|
||||||
src="logbkimg13.png" width="75%" height="50%"></br>
|
src="/years/2013/logbkimg13.png" width="75%" height="50%"></br>
|
||||||
|
|
||||||
<hr />
|
<hr />
|
||||||
<div class="tripdate" id="t2013-08-13b">2013-08-13</div>
|
<div class="tripdate" id="t2013-08-13b">2013-08-13</div>
|
||||||
@ -1003,7 +1003,7 @@ everything but a drill bit. Unable to fashion one from Mars bars or limestone th
|
|||||||
manage to drop an extra pitch on a natural. This involved getting wet in spray from small
|
manage to drop an extra pitch on a natural. This involved getting wet in spray from small
|
||||||
stream – so only Pete descended. He landed in pretty wide rift. An easy 2m climb led to a
|
stream – so only Pete descended. He landed in pretty wide rift. An easy 2m climb led to a
|
||||||
further 10-15m pitch which is undescended. <br /><img alt="Rigging guide/elevation"
|
further 10-15m pitch which is undescended. <br /><img alt="Rigging guide/elevation"
|
||||||
src="logbkimg14.png"></br>
|
src="/years/2013/logbkimg14.png"></br>
|
||||||
The team then derigged. </p>
|
The team then derigged. </p>
|
||||||
|
|
||||||
|
|
||||||
@ -1156,7 +1156,7 @@ attempts. Sadly the spike then came down the pitch, so the lead is still going
|
|||||||
derigging + hauled the 6 bags up the entrance pitch and carted them back to camp. There
|
derigging + hauled the 6 bags up the entrance pitch and carted them back to camp. There
|
||||||
are a lot of great leads in 107 and possible connections with 101 and 76 still to be
|
are a lot of great leads in 107 and possible connections with 101 and 76 still to be
|
||||||
found. If only expo lasted longer.<p>Below is the rigging guide found in the logbook, but a beautiful PDF version can now be found <a href="http://survex.com/~olly/107rigging2013.pdf">here</a>.</p><br /><img alt="2013 rigging guide for 107"
|
found. If only expo lasted longer.<p>Below is the rigging guide found in the logbook, but a beautiful PDF version can now be found <a href="http://survex.com/~olly/107rigging2013.pdf">here</a>.</p><br /><img alt="2013 rigging guide for 107"
|
||||||
src="logbkimg15.png"></br></p>
|
src="/years/2013/logbkimg15.png"></br></p>
|
||||||
<div class="timeug">T/U: 6hrs</div>
|
<div class="timeug">T/U: 6hrs</div>
|
||||||
|
|
||||||
<hr />
|
<hr />
|
||||||
@ -1173,7 +1173,7 @@ the rope was able to hang nearer the window allowing a swing across to it. Time
|
|||||||
by then so exploring the continuing passage was left for the next day. </p>
|
by then so exploring the continuing passage was left for the next day. </p>
|
||||||
|
|
||||||
<br /><div style="text-align: center"><img alt="Rigging Guide"
|
<br /><div style="text-align: center"><img alt="Rigging Guide"
|
||||||
src="logbkimg16.png"></div></br>
|
src="/years/2013/logbkimg16.png"></div></br>
|
||||||
|
|
||||||
<hr />
|
<hr />
|
||||||
<div class="tripdate" id="t2013-08-15b">2013-08-15</div>
|
<div class="tripdate" id="t2013-08-15b">2013-08-15</div>
|
||||||
@ -1217,7 +1217,7 @@ traverse and was confirmed as such when the traverse was found from the other di
|
|||||||
<p>Both of the tubes (Double barrel passage) had a small rift in the floor which is believed
|
<p>Both of the tubes (Double barrel passage) had a small rift in the floor which is believed
|
||||||
to drop to a lower level, the best place to drop this would probably be the traverse in the
|
to drop to a lower level, the best place to drop this would probably be the traverse in the
|
||||||
second tube mentioned above.<div style="text-align: center"><br /><img alt="Rigging guide"
|
second tube mentioned above.<div style="text-align: center"><br /><img alt="Rigging guide"
|
||||||
src="logbkimg17.png"></br></div></p>
|
src="/years/2013/logbkimg17.png"></br></div></p>
|
||||||
|
|
||||||
<div class="timeug">T/U: 12hrs</div>
|
<div class="timeug">T/U: 12hrs</div>
|
||||||
|
|
||||||
@ -1233,7 +1233,7 @@ clean washed aven and downstream a series of boulder climbs. A possible lead was
|
|||||||
halfway up the wall in the chamber above the pitch. This would require a traverse or a climb
|
halfway up the wall in the chamber above the pitch. This would require a traverse or a climb
|
||||||
or possibly a tube on the left of the passage above this chamber might give slightly easier
|
or possibly a tube on the left of the passage above this chamber might give slightly easier
|
||||||
access. Then derigged Tunnocks entrance and caramel Catharsis.<br /><img alt="Rigging guide"
|
access. Then derigged Tunnocks entrance and caramel Catharsis.<br /><img alt="Rigging guide"
|
||||||
src="logbkimg18.png"></br></p>
|
src="/years/2013/logbkimg18.png"></br></p>
|
||||||
|
|
||||||
<div class="timeug">T/U: 6hrs 30</div>
|
<div class="timeug">T/U: 6hrs 30</div>
|
||||||
<hr /></body></html>
|
<hr /></body></html>
|
||||||
|
Loading…
Reference in New Issue
Block a user