mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2024-11-25 16:52:00 +00:00
fix a link in survey/how and provide some other notes on scale drawing.
also begin splitting up hints into stuff more or less relevant to modern instruments.
This commit is contained in:
parent
03aae39788
commit
cbfeb30e6d
@ -8,37 +8,18 @@
|
||||
<h2 id="tophead">CUCC Expo Surveying Handbook</h2>
|
||||
<h1>Wookey's hints and tips</h1>
|
||||
|
||||
<p>... to save you going back to do it again.
|
||||
<p>... to save you going back to do it again.</p>
|
||||
|
||||
<p><i>"hmm - not going to finish this even slightly, so some points to bear
|
||||
in mind:"</i></p>
|
||||
|
||||
<ul>
|
||||
<li>The compass must be held level to get a meaningful reading. A left/right
|
||||
tilt will cause a systematic over or under reading, whilst sighting up or
|
||||
down a steep leg may cause the compass to stick. It is easier to sight from
|
||||
the lower station by keeping the tape in position and sighting along it.</li>
|
||||
|
||||
<li>Take care with lights, batteries, helmets and anything else which could
|
||||
be magnetic - check your gear on the surface, or your work could be seriously
|
||||
impaired. If your light affects the compass, then hold it away from the
|
||||
instrument when lighting it. Keep the compass well away from steel objects
|
||||
like bolts, steel karabiners or maillons, tripods or ammo cans when sighting.</li>
|
||||
|
||||
<li>Practice using the compass above ground to avoid classic errors like
|
||||
reading 56 as 64 (ie. counting the wrong way from the 60 marker).</li>
|
||||
|
||||
<li>Degrees are on the <b>left hand</b> scale on clinos. The other scale is
|
||||
percent gradient - this is better than nothing if you can't read the degree
|
||||
scale (make it abundantly clear in the notes), but reading the wrong one
|
||||
without realising gives useless results.</li>
|
||||
|
||||
<li>Pick survey points so you can get your head in, and so you can see both
|
||||
ways as easily as possible. Note that Bolts are good things to use as
|
||||
stations (because we can find them again), but don't put the compass within
|
||||
30cm as it will give joke readings. Sight from the other end of the leg, or
|
||||
put the compass behind it and look <em>past</em> the bolt.</li>
|
||||
|
||||
<li>Write decimal points as slashes to stop them getting lost in the mud.
|
||||
Make sure they don't look like "1"s. It is helpful to always write compass
|
||||
readings as three digits before the decimal point, and clino as two digits
|
||||
@ -59,16 +40,6 @@ might get rubbed off.</li>
|
||||
|
||||
<li>Take at least one spare pencil!</li>
|
||||
|
||||
<li>Return instuments to the dessicator before you fall asleep
|
||||
otherwise they are likely to fog up the next time. Don't leave them in the
|
||||
cave, both for the above reason and because the next survey may need them
|
||||
somewhere else entirely.</li>
|
||||
|
||||
<li>Leapfrogging is a good idea in general but you don't have to be religious
|
||||
about it. It is almost impossible in tiny passage, and sometimes a point for
|
||||
a survey station is so obvious that you <em>have</em> to use it, but can't
|
||||
actually take readings <i>from</i> it.</li>
|
||||
|
||||
<li>Draw plans and extended elevations in horizontal bits of cave, with
|
||||
cross sections for each typical section of passage. Orientate your cross
|
||||
sections (ie. show which direction they are looking) on the plans. It helps
|
||||
@ -80,10 +51,6 @@ impossible to orientate later. A plan with only one station and no direction
|
||||
indicator cannot be orientated. It is easiest if the drawer takes a spare
|
||||
compass for this (doesn't have to be a good one) in vertical work.</li>
|
||||
|
||||
<li>Think ahead when surveying pitches, especially long ones. Take two tape
|
||||
measures for stuff over 30m, or three well-organised people and some handy
|
||||
big croc-clips!</li>
|
||||
|
||||
<li>Record the serial numbers of instruments (comp/clino/tape). Also write
|
||||
down dates, endpoints, surveyors, cave, any conventions used for symbols,
|
||||
passage widths etc.</li>
|
||||
@ -93,6 +60,43 @@ otherwise your surveys will be left hanging in space. From 1996, the QM
|
||||
list is supposed to tell you the nearest existing survey station - make
|
||||
sure that you can identify this (look at the relevant year's survey book).</li>
|
||||
|
||||
</ul>
|
||||
|
||||
<h3>If using analogue instruments (i.e. Suunto)</h3>
|
||||
<ul>
|
||||
<li>The compass must be held level to get a meaningful reading. A left/right
|
||||
tilt will cause a systematic over or under reading, whilst sighting up or
|
||||
down a steep leg may cause the compass to stick. It is easier to sight from
|
||||
the lower station by keeping the tape in position and sighting along it.</li>
|
||||
|
||||
<li>Practice using the compass above ground to avoid classic errors like
|
||||
reading 56 as 64 (ie. counting the wrong way from the 60 marker).</li>
|
||||
|
||||
<li>Degrees are on the <b>left hand</b> scale on clinos. The other scale is
|
||||
percent gradient - this is better than nothing if you can't read the degree
|
||||
scale (make it abundantly clear in the notes), but reading the wrong one
|
||||
without realising gives useless results.</li>
|
||||
|
||||
<li>Pick survey points so you can get your head in, and so you can see both
|
||||
ways as easily as possible. Note that Bolts are good things to use as
|
||||
stations (because we can find them again), but don't put the compass within
|
||||
30cm as it will give joke readings. Sight from the other end of the leg, or
|
||||
put the compass behind it and look <em>past</em> the bolt.</li>
|
||||
|
||||
<li>Return instuments to the dessicator before you fall asleep
|
||||
otherwise they are likely to fog up the next time. Don't leave them in the
|
||||
cave, both for the above reason and because the next survey may need them
|
||||
somewhere else entirely.</li>
|
||||
|
||||
<li>Leapfrogging is a good idea in general but you don't have to be religious
|
||||
about it. It is almost impossible in tiny passage, and sometimes a point for
|
||||
a survey station is so obvious that you <em>have</em> to use it, but can't
|
||||
actually take readings <i>from</i> it.</li>
|
||||
|
||||
<li>Think ahead when surveying pitches, especially long ones. Take two tape
|
||||
measures for stuff over 30m, or three well-organised people and some handy
|
||||
big croc-clips!</li>
|
||||
|
||||
<li>Calibration is useful at 161a: ie. compass from lower to upper cairn, and
|
||||
from lower cairn to Bräuning Zinken (if you know where it is - highest
|
||||
point near right-hand edge of Bräuning Wall (just over the bush!)). See
|
||||
|
@ -26,6 +26,7 @@ chance to survey, on the derigging trip of a cave which is now "finished"),
|
||||
it is better to record all the passage, rather than part of it to a very high
|
||||
standard. Particularly to be avoided is a survey that doesn't connect to the
|
||||
rest of the cave.</p>
|
||||
|
||||
<p><img class="onleft" width=70% src ="../i/76-clipart.png" />
|
||||
You are collecting data to fulfill a number of needs: the actual position
|
||||
of the passage for finding where it goes and possible connections; the shape
|
||||
@ -81,9 +82,19 @@ visible, to record the location of shelly bands, faults, dip and strike of
|
||||
any prominent bedding or other cleavage planes, and any old flow markings
|
||||
(direction and approx diameter). Anything unusual which would make a good
|
||||
landmark is also useful, and of course, man-made things like pitch rigging,
|
||||
traverse lines or cairns.</li>
|
||||
traverse lines or cairns. Refer to the
|
||||
<a href=https://www.carto.net/neumann/caving/cave-symbols/uis_signatures_english.pdf>
|
||||
UIS standard symbols</a> for a general guide.</li>
|
||||
|
||||
<li>We use Therion protractors undergound for estimating directions when we are sketching passage shape and direction. We have templates in <a href="../templates/therion1_250.pdf">1:250</a> and <a href="../../templates/therion1_500.pdf">1:500</a> scales. (Thanks to Martin Budaj for these.)
|
||||
<li>We use Therion protractors undergound for estimating directions when we are
|
||||
sketching passage shape and direction. We have templates in
|
||||
<a href="../../templates/therion1_250.pdf">1:250</a> and
|
||||
<a href="../../templates/therion1_500.pdf">1:500</a> scales. (Thanks to Martin
|
||||
Budaj for these.). Some alternatives for those without access to transparency
|
||||
slides include an orienteering compass with scale (e.g.
|
||||
<a href=https://silvasweden.com/collections/compasses/products/compass-classic>
|
||||
a silva compass</a>), or a metric
|
||||
<a href="http://cavecompass.com/">cave compass</a></li>
|
||||
|
||||
<li>The left, right, up, down (LRUD) from the survey station to the general
|
||||
passage wall, not the closest piece of rock. These should be <b>measured</b>
|
||||
|
Loading…
Reference in New Issue
Block a user