Logbook edited 2023-07-12d

This commit is contained in:
Philip Sargent 2024-07-24 21:50:08 +01:00
parent 83fed8fafb
commit abf6291161

View File

@ -892,6 +892,8 @@ was no evidence of a draft at the bottom so not particularly promising.
<div class="triptitle">Fishface - Persied Showers 2023</div>
All on through bolts, about 300m of rope, taken in 1 bag to much regret.
<p>
[RIGGING DIAGRAM MISSING]
<p>
Can't really remember the rigging exactly. Continues for about 200 m of rope to a boulder floor, dropped a 15M pitch to the left side of a house sized boulder. At least five streams converge in this area. below the 15m pitch the floor is choked by boulders with a pool/ gravley sump at the downstream end. Still a strong draught but not obvious way on. Could be many side passages on the way down. As I was alone with no disto and with a thunderstorm forecast (rightly) for the next day, this was not surveyed so a return visit to survey, drop the parallel shaft, and de rig is required. I was wearing a new AV hollock over suit which still had it's water proofing as well as a gimp mac over the top. Just about able to stay dry enough but a PVC would be better. This was a fantastic bit of cave, really enjoyed the splashy Yorkshire nature , even though I was a little scared of flood pulses at times. Was rather sad that it didn't break into the next horizontal level. Might still be worth pushing the parallel shaft from the end of the fist rope. - Mike
<div class="timeug">T/U: 0.0 hours</div>
<div class="editentry"><br /><a href="/logbookedit/2023-07-12d">Edit this entry</a><br /></div>