More logbook update. Jenny

This commit is contained in:
expouser 2013-06-26 17:20:27 +12:00
parent ce0d385f60
commit 9d3dab1aaf

@ -210,7 +210,36 @@ Derigged back to entrance chamber and began to survey out. Checked the bottom of
Surveyed back to entrance chamber, and left the cave. Surveyed back to entrance chamber, and left the cave.
</p> </p>
<div class="timeug">T/U: Jenny 7hrs, Olly 6:50</div> <div class="timeug">T/U: Jenny 7hrs, Olly 6:50</div>
<div class="tripdate" id="t2012-08-12c">2012-08-12</div>
<div class="trippeople">OllyB, <u>Jenny</u></div>
<div class="triptitle">83 - Under a Rock, Down Under</div>
<p>
Went back into Under a Rock and dropped the pitch. The bottom was a tall rift, up didn't go far, the way the water flows rapidly got too narrow. We followed the 3rd way on, up a short climb and down the other side (via a bolt). We scrambled further down and down some more to find ourselves back at the bottom of the p32. Olly was amused at where we were, I was annoyed. But at least our loop closure was good!
</p><p>
Went back to entrance chamber to survey out. Olly spotted a hole thru' some rocks. It drafted so we pulled some rocks out. We couldn't easily make the gap big enough, so tried a meter or so higher up. I managed to get through, and amazingly got under and through a window into another passage underneath <u>Down Under</u>, removed more rocks so Olly could follow me through. Followed the passage past a squeeze and a climb down. Found ourselves above a reasonable sized passage ~5m above. Didn't look climbable down, but I could traverse over. Did this to another 6m drop into the same passage, but excitingly could see a snow plug. We wondered if this was 107. Surveyed out and up to the tag bolt.
</p><p>
Scrambled in 107 on the way back and saw a similar looking snow plug. Down the hill the survey data confirms we connected! Not as impressive as The Connection, but we have made 107 ~9m deeper (by the CUCC way) and ~500m longer.
</p>
<div class="timeug">TU: 7:40hrs Jenny, 7:30hrs Olly</div>
<div class="tripdate" id="t2012-08-15d">2012-08-15</div>
<div class="trippeople">OllyB, <u>Jenny</u></div>
<div class="triptitle">83 - derig and survey</div>
<p>
Went back to 83 for the actual final trip. I retrieved the rigging gear while Olly sketched the entrance chamber. I derigged and swung across to look at side tubes. One near the top generated another ~15m of passage.
</p><p>
Finished de-rigging. [rigging diagram in original]
</p>
<div class="timeug">2.5hrs
<div class="tripdate" id="t2012-08-15e">2012-08-15</div>
<div class="trippeople">OllyB, <u>Jenny</u></div>
<div class="triptitle">148 rig</div>
<p>
Went to 148 and rigged in the first 4 pitches (i.e. to just before deep space). I'd forgotten how cold and drafty 148 is.
</p>
<div class="timeug">2.5hrs</div>
</body> </body>
</html> </html>