More logbook update. Jenny

This commit is contained in:
expouser 2013-06-26 17:20:27 +12:00
parent ce0d385f60
commit 9d3dab1aaf

View File

@ -210,7 +210,36 @@ Derigged back to entrance chamber and began to survey out. Checked the bottom of
Surveyed back to entrance chamber, and left the cave.
</p>
<div class="timeug">T/U: Jenny 7hrs, Olly 6:50</div>
<div class="tripdate" id="t2012-08-12c">2012-08-12</div>
<div class="trippeople">OllyB, <u>Jenny</u></div>
<div class="triptitle">83 - Under a Rock, Down Under</div>
<p>
Went back into Under a Rock and dropped the pitch. The bottom was a tall rift, up didn't go far, the way the water flows rapidly got too narrow. We followed the 3rd way on, up a short climb and down the other side (via a bolt). We scrambled further down and down some more to find ourselves back at the bottom of the p32. Olly was amused at where we were, I was annoyed. But at least our loop closure was good!
</p><p>
Went back to entrance chamber to survey out. Olly spotted a hole thru' some rocks. It drafted so we pulled some rocks out. We couldn't easily make the gap big enough, so tried a meter or so higher up. I managed to get through, and amazingly got under and through a window into another passage underneath <u>Down Under</u>, removed more rocks so Olly could follow me through. Followed the passage past a squeeze and a climb down. Found ourselves above a reasonable sized passage ~5m above. Didn't look climbable down, but I could traverse over. Did this to another 6m drop into the same passage, but excitingly could see a snow plug. We wondered if this was 107. Surveyed out and up to the tag bolt.
</p><p>
Scrambled in 107 on the way back and saw a similar looking snow plug. Down the hill the survey data confirms we connected! Not as impressive as The Connection, but we have made 107 ~9m deeper (by the CUCC way) and ~500m longer.
</p>
<div class="timeug">TU: 7:40hrs Jenny, 7:30hrs Olly</div>
<div class="tripdate" id="t2012-08-15d">2012-08-15</div>
<div class="trippeople">OllyB, <u>Jenny</u></div>
<div class="triptitle">83 - derig and survey</div>
<p>
Went back to 83 for the actual final trip. I retrieved the rigging gear while Olly sketched the entrance chamber. I derigged and swung across to look at side tubes. One near the top generated another ~15m of passage.
</p><p>
Finished de-rigging. [rigging diagram in original]
</p>
<div class="timeug">2.5hrs
<div class="tripdate" id="t2012-08-15e">2012-08-15</div>
<div class="trippeople">OllyB, <u>Jenny</u></div>
<div class="triptitle">148 rig</div>
<p>
Went to 148 and rigged in the first 4 pitches (i.e. to just before deep space). I'd forgotten how cold and drafty 148 is.
</p>
<div class="timeug">2.5hrs</div>
</body>