[svn r7135] Fixed typos

This commit is contained in:
expo 2005-08-14 23:53:56 +02:00
parent 31d0ec4674
commit 89dccecc5f

View File

@ -36,7 +36,7 @@ reaching the conclusion that the potential was good.
as well as three significant discoveries:
<p><span lang="de">Br&auml;uningh&ouml;hle</span> was found first, an obvious
horizontal cave on a fault led to severl pitches and a small stream. This led
horizontal cave on a fault led to several pitches and a small stream. This led
to a large rift descending in pitches of 25, 50, 25 and 30m to a sump at
-220m.
@ -46,7 +46,7 @@ climb and a very tight passage to the head of a deep rift. This dropped down
pitches of 15,20,20,15,30,15 &amp; 15m in quick succession to some horizontal
passage and three more short pitches. More horizontal passage led to a large
shaft. A continuation could be seen beyond but could not be reached. The
shaft was 25m and there was no longer a draught. at the bottom. Three short
shaft was 25m and there was no longer a draught at the bottom. Three short
pitches led to a final 20m drop and the way on became too narrow at -265m.
<p><span lang="de">Eislufth&ouml;hle</span> was a group of three powerfully
@ -92,7 +92,7 @@ surface curtailed exploration at this point and we were forced to derig.
<p>In 1979, only a small group was able to return, so
<span lang="de">Eislufth&ouml;hle</span> was our main objective. The 70m
PLugged Shaft had again totally changed its snow configuration and rebolting
Plugged Shaft had again totally changed its snow configuration and rebolting
was needed, but after this, the pot was quickly rigged to -260m. From the
second chamber here, the other outlet was explored and led to pitches of 17m
and 9m and thence back to the original route part way down the stream canyon.