mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2025-03-27 12:41:56 +00:00
Online edit of cave 1626-359
This commit is contained in:
parent
cf9e10be3e
commit
125de113dd
@ -91,13 +91,12 @@ the second snow plug a short, drafting crawl over boulders leads directly to two
|
|||||||
a short wriggle through boulders on the L side of the passage leads
|
a short wriggle through boulders on the L side of the passage leads
|
||||||
to a short section of rift passage ending at a p3 to a ledge. The
|
to a short section of rift passage ending at a p3 to a ledge. The
|
||||||
ledge looks out over a large chamber with jammed boulders in the roof
|
ledge looks out over a large chamber with jammed boulders in the roof
|
||||||
directly opposite the ledge. <i>(There may be passage leading off
|
directly opposite the ledge. <i>(There may be passage leading off from these jammed boulders, QMB - unclear if this QM remains). </i>The p30 from this ledge to the
|
||||||
from these jammed boulders, QMB). </i>The p30 from this ledge to the
|
|
||||||
boulder floor of the chamber is <b>Radagast</b>.<p>
|
boulder floor of the chamber is <b>Radagast</b>.<p>
|
||||||
|
|
||||||
<p><i>5m below the top of <b>Radagast</b> it is
|
<p><i>5m below the top of <b>Radagast</b> it is
|
||||||
possible to swing into a series of small phreatic tubes and immature
|
possible to swing into a series of small phreatic tubes and immature
|
||||||
vadose shafts trending SW at point PT01 and leading past PT02. This leads to a pitch series, <b>Welsh Engineering</b>, which, in 2024, was eventually connected to <b>Hobnob Hallway</b> via the <b>Eye of Sauron</b>. This therefore provides an alternate entrance series. However, in 2024 it was flood prone and the rigging caused problems and would need considerable effort to make safe so it may not be revisited despite the survey not being connected in or completed..</i></p>
|
vadose shafts trending SW at point PT01 and leading past PT02. This leads to a pitch series, <b>Welsh Engineering</b>, which, in 2024, was eventually connected to <b>Hobnob Hallway</b> via the <b>Eye of Sauron</b>. This therefore provides an alternate entrance series. However, in 2024 it was flood prone and the rigging caused problems and would need considerable effort to make safe so it may not be revisited despite the survey not being connected in or completed.</i></p>
|
||||||
|
|
||||||
<p>From the bottom of
|
<p>From the bottom of
|
||||||
<b>Radagast</b> a traverse on the L along a bedrock ledge with jammed
|
<b>Radagast</b> a traverse on the L along a bedrock ledge with jammed
|
||||||
@ -123,34 +122,32 @@ the easiest option is to descend to the base of the pitch and climb
|
|||||||
up the wall protected with jammers on the pitch rope). Traversing
|
up the wall protected with jammers on the pitch rope). Traversing
|
||||||
along the ledge leads to an abandoned meander with a very strong
|
along the ledge leads to an abandoned meander with a very strong
|
||||||
outward draft. A short p5 N at PT03 at the far end of the traverse
|
outward draft. A short p5 N at PT03 at the far end of the traverse
|
||||||
drops down to the start of <b>The Second Coming. </b><i>(Continuing
|
drops down to the start of <b>The Second Coming. whilst a p8 up from PT03 to a small phreatic tube on the R leads to <b>Propane
|
||||||
to the bottom of </i><i><b>Grommit </b></i><i>lands on a rock floor
|
Nightmares). </b> </p>
|
||||||
|
|
||||||
|
<p> <i>Continuing
|
||||||
|
to the bottom of ><b>Grommit </b>lands on a rock floor
|
||||||
with a vadose trench and a stream in the bottom. This leads via a p10
|
with a vadose trench and a stream in the bottom. This leads via a p10
|
||||||
to a short series of narrow tubes which end in tight sumps and
|
to a short series of narrow tubes which end in tight sumps and
|
||||||
chokes).</i></p>
|
chokes.</i></p>
|
||||||
|
|
||||||
<H3>The Second Coming</H3>
|
<H3>The Second Coming</H3>
|
||||||
|
|
||||||
<p><b>The Second Coming
|
<p><b>The Second Coming
|
||||||
</b>starts below the p5 N of PT03 (which is at the end of the
|
</b>starts below the p5 N of PT03 (which is at the end of the
|
||||||
traverse from the Entrance Series). (<i>From here a p8 (left rigged
|
traverse from the Entrance Series). The passage continues as a very drafty phreatic
|
||||||
2019) up to a small phreatic tube on the R leads to </i><i><b>Propane
|
|
||||||
Nightmares). </b></i>The passage continues as a very drafty phreatic
|
|
||||||
tube with a vadose trench to quickly reach a junction at PT04.
|
tube with a vadose trench to quickly reach a junction at PT04.
|
||||||
(<i>Heading L at this junction leads to </i><i><b>Hobnob Hallway</b></i><i>
|
(<i>Heading L at this junction leads to </i><i><b>Hobnob Hallway</b></i><i>
|
||||||
(described in a separate section below). </i>Continuing directly NE
|
(described in a separate section below). </i>Continuing directly NE
|
||||||
along <b>The Second Coming </b>the passage immediately passes a small
|
along <b>The Second Coming </b>the passage immediately passes a small
|
||||||
L passage (<i>this immediately goes to a junction. Here, L oxbows
|
L passage (<i>this immediately goes to a junction. Here, L oxbows
|
||||||
down Kitkat Connection straight back to Hobnob Hallway whilst R goes
|
down Kitkat Connection straight back to Hobnob Hallway whilst R goes
|
||||||
to a parallel passage to The Second Coming). </i>After a further
|
to a passage which eventually connects back in to The Second Coming at PT05). </i>After a further
|
||||||
section of straight, high rift to the NE it reaches a junction at
|
section of straight, high rift to the NE it quickly reaches a junction at
|
||||||
PT05 with a large, abandoned meander. (<i>L here heading downstream
|
PT05 with a large, abandoned meander. (<i>Dropping down 3m to the floor here and heading back L heads SW. The roof gradually lowers - passing a
|
||||||
and SW in this meander, the roof gradually lowers - passing a
|
|
||||||
junction on the L that goes to Kitkat Connection - until a high aven
|
junction on the L that goes to Kitkat Connection - until a high aven
|
||||||
with a flowstone floor is reached. Beyond this aven a short section
|
with a flowstone floor is reached. Beyond this aven a short section
|
||||||
of passage leads to a pitch (QMA) with a passage visible on the other
|
of passage leads to a series of holes that may still be QMs after 2024 (2018-10C, 2018-11B, 2018-11A. Continuing SW leads via a 15m drop to a further connection with Hobnob Hallway with several avens in the connection area.</i></p>
|
||||||
side (QMA) that is presumed to be the continuation of the
|
|
||||||
aforementioned meander).</i></p>
|
|
||||||
|
|
||||||
<p>From PT05, heading
|
<p>From PT05, heading
|
||||||
‘upstream’ (though there is not always any water flowing) from
|
‘upstream’ (though there is not always any water flowing) from
|
||||||
|
Loading…
x
Reference in New Issue
Block a user