mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2024-11-27 01:32:03 +00:00
1042 lines
48 KiB
HTML
1042 lines
48 KiB
HTML
<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.0//EN">
|
|
<html>
|
|
<head>
|
|
<meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1" />
|
|
<title>1983: Logbook</title>
|
|
<link rel="stylesheet" type="text/css" href="../../css/main2.css" />
|
|
</head>
|
|
<body>
|
|
<h1>AUSTRIA 1983</h1>
|
|
25/7/83 - 12/8/83
|
|
|
|
<p>
|
|
The first part of the log is traditionally taken up by the journey out.<br>
|
|
If this is of no interest, here is a link <a href="#start">to the caving</a>!
|
|
|
|
<p>The journeys out. ?
|
|
|
|
<p>Team Griffiths - Makins
|
|
|
|
<p>Arrived at Ramsgate 2 hrs early so had to eat a lot before embarking on
|
|
ferry. Zapped down to Reinböllen at warp factor 9 to drink beer with Ben
|
|
et al - missed Ben by 10 mins. Arrived in Staudnwirt at 4pm Sunday having
|
|
gently grockled round Hallstatt all afternoon.
|
|
|
|
<p>Team Fucked-Viva
|
|
|
|
<p>Arrived at Dover 5 hours early - no decent beer. One fuse stop and a trip
|
|
round Dachau concentration camp to make Austria seem nice. Arrived in a piece
|
|
after 16 hours.
|
|
|
|
<p>Becky
|
|
|
|
<p>The most problematical part of my journey was getting to Victoria for a
|
|
6-O'Clock train. This accomplished, train, plane, train + train (the last
|
|
stopping at every lamp post) then feet got me to Staudnwirt around 6.20pm.
|
|
|
|
<p>Team Bowers - Van Millingen - Whigglesworth
|
|
|
|
<p>The hovercraft wasn't full of eels. Stopped at Rheinböllen (NB
|
|
spelling miss Makins) - the place the crab broke down 1979 expedition with
|
|
café with gorgeous little girls in white teeshirts, but it was shut
|
|
& Julian had gone anyway. Zipped through Austria until a little man waved
|
|
us down, demanded 100 schillings from John & muttered something about
|
|
Radar control & 67 kph instead of 50 kph. Staudnwirt in time for several
|
|
beers.
|
|
|
|
<p>Team Chas & Dave (gertcha !)
|
|
|
|
<p>well.....
|
|
chasfailedhisdrivingtestandwewerestillrepairingphil'scaronsaturdaymorningbutweateaspagbolandsetoff
|
|
todoverandtheradiatorboiledoverforthefirsttimeinapetrolstationandsowefilleditupanditstartedwithclouds
|
|
ofsteamandafteragreasychipswegotontheferrybutonlyjustcoswewerelastandwehadtosleepondeckandthenwegot
|
|
tozeebruggeanditwasfourinthemorningsooffwesetandatfirstitwasokbutafterafewhundredmilesthrashingitgot
|
|
hotterandhotterandwehadtokeepstoppingtorefilltheradiatorandthenwehadnomoregermanmoneyandnearlyranout
|
|
atmunichbuthtenfoundyoucoulduseenglishmoneysowefilledupandattheaustrianborderinearlylostacontactlens
|
|
anditgotdarkandwegotlostandtheradiatorboiledoveragainandagainandsometimesthecylindersfilledwithwater
|
|
andlockedtheengineandwegotlostinKuchlandtheradiatorboiledoveragainanditwasgettinghardertostartandonce
|
|
wehadtoforageinavalleytofindsomewaterandthenwetookoffthebonnettocooltheenginebutitstartedtorainandthe
|
|
enginedrownedinbadausseebutwithaquicksquirtofwd40itstartedandwelimpedintogrundlseeataboutoneinthe
|
|
morningaftertwentyonehoursdrivinggodwasibuggered.
|
|
|
|
<p>TR6 Nicky & Tony
|
|
|
|
<p>Managed to avoid Plank etc. in Dover, went swimming & drank in the
|
|
Louis Armstrong. Wended our way towards Austria saving time by not bothering
|
|
to eat. Nicky slid down a glass partition at a motorway cafe in a dead faint.
|
|
Went swimming. Hit a highly decorated town (Wasserburg) in the evening before
|
|
cruising on down via a bar or two to the car park. Walked up to 113 then
|
|
above, found an open entrance (60' pitch), returned to meet everybody at Bar
|
|
Fischer (having seen John's car at the car park) before finally finding
|
|
everybody at the campsite bar.
|
|
|
|
<p>Team reclining seats
|
|
|
|
<p>A featureless thrash from Zeebrugge to Wurzburg for a walk + a sausage,
|
|
thence to Ingolstadt where Philip's eyes were closing as a consequence of
|
|
Gail's having given up between Rushden and Cambridge.... Failed to find
|
|
campsite at Ingolstadt - thrashed on down to a "service station" past Munchen
|
|
where we crashed on **Reclining Seats** and slept 10 hours. To Grundlsee
|
|
without incident (to the sound of Gail's snores) and a drink at the OTHER
|
|
Grundlsee campsite. Spotted Mess tent in between and so set off for a walk up
|
|
to the plateau...
|
|
|
|
<hr /><a name="start">1983-07-25 | BUNDA BASHING DAY 1 | Naomi, John, Ben, Julian</a>
|
|
|
|
<p>A gentle day's workout for the old codgers. Went up to 113 and then
|
|
prospected the area above. Found very little apart from the inevitable
|
|
snow-plugged shafts. No draughts at all apart from one small choked hole near
|
|
a prominent gravel bank. By this time we were quite close to the top of the
|
|
Schwarzmooskogel so off to the top ! Just below the top we almost fell down a
|
|
great gaping maw. Julian nearly killed himself when a boulder crept up behind
|
|
and took him for a ride down the shaft. This so disturbed Ben that he lent
|
|
John his gear and John went down. We ran out a 40m rope getting down to 30m
|
|
in stages. A small 5m pitch and then a larger pitch into a high canyon. This
|
|
was getting serious enough to be left for another day, so we did that. Then
|
|
the shortcut back to the Bergrestaurant. 1½ hours later we arrived
|
|
back at the path. The gentle day's workout had taken a nasty turn and four
|
|
very knackered old codgers arrived at the car park 2 hours after leaving "The
|
|
Hole".
|
|
|
|
<p>Julian
|
|
|
|
<hr /><a id="id1983-142-1">1983-07-25 | 132=142 Monday | Mike, Wiggi</a>
|
|
|
|
<p>Raced along the path, through the bunde & into the big chamber pitch.
|
|
Used the rusty bolts which have since been failed by the BOLT INSPECTOR. Went
|
|
down the tube pushed by Tim, grovelled round & followed draught to a
|
|
sizeable inlet, free-climbed up this till eventually returned to the bottom
|
|
of the big chamber. Free-climbed big chamber wall to passage 50-60' above
|
|
pitch, possible bypass. Out quickly after 4 hrs.
|
|
|
|
<p align=right>Mike
|
|
|
|
<p><a href="../1982/log.htm#id1982-142-5">Previous trip</a> /
|
|
<a href="#id1983-142-2">Next trip</a>
|
|
|
|
<hr />
|
|
<a>1983-07-26 | Tuesday | Naomi, John</a>
|
|
|
|
<p>Couldn't face thrashing through the bunda again, so we tried a new route -
|
|
up to the "plateau" col, keep right and traverse about 200 yds and then head
|
|
up slabs, following some small cairns to the summit of Viede Schwarzmoos
|
|
Kogel. Sign the visitors book at the top and then drop down, slightly right,
|
|
for 100 yds and there's the entrance.
|
|
|
|
<p>While Naomi sunned her delicate white flesh, I hopped down the entrance
|
|
pitch. 10m down the next pitch, a rebelay and an 10m to a boulder floor,
|
|
another 5m pitch, more boulders and a final airy bolt, specially placed for
|
|
Ben's delight tomorrow.
|
|
|
|
<hr />
|
|
<a>1983-07-26 | Prospecting | Pete, Chas.</a>
|
|
|
|
<p>Followed the joint up above Stellerweg (bearing 220°). Found 2
|
|
phreatic draughting entrances which we followed until they went vertical.
|
|
They draught IN. Then onto the small pimple which is the top of the ridge
|
|
above Stellerweg. I managed to step on a rock which wasn't too solid and fell
|
|
20feet, but only a few grazes. Then parallel to the ridge, with lots of signs
|
|
of the Germans (beer cans etc.) Found a big depression with a 45° bedding
|
|
plane down which closed down after ~15m. There was a ~10m pitch on the
|
|
opposite side which we descended to a choke. Then onto a very distinctive
|
|
(sink when wet) - with brown gravel banks and a limestone bridge. From here
|
|
due south found ~100m through trip - lot of snow banks, icicles, ice
|
|
stalagtites + some phreatic tubes, but no ways on. There were 4 entrances,
|
|
two of them non-climbable shafts. Then back parallel to the ridge, with very
|
|
few leads. We almost made the path directly above Stellerweg, but descended
|
|
too soon and hit 201 at 88.
|
|
|
|
<hr />
|
|
Julian walked up to the Appel-Haus, had a beer and a mineral water, and
|
|
then walked back to Grundlsee.
|
|
|
|
<hr />
|
|
<a>1983-07-26 | hole that hasn't got a name yet. 140 | Ben, Julian</a>
|
|
|
|
<p>Schwarzmooskögel route proved best way. Lots of chamois. Julian
|
|
belted down to John's 'airy' bolt & down 80ft shaft. Bottom choked by
|
|
boulders with small impenetrable rift - through which could be heard
|
|
tantalising heavy drip. 30ft down shaft is a big boulder. On the other side
|
|
is a passage 25ft up heading in the direction of the drip - by this time Ben
|
|
had finished putting in two bolts on the entrance pitch & arrived down to
|
|
have a fag while Julian started bolting up towards this passage. He was even
|
|
called upon to lifeline when Julian was 3 bolts up leaving one more for John
|
|
to climb to GLORY.
|
|
|
|
<p>Time 4 hrs, Ben
|
|
|
|
<hr />
|
|
<a id="id1983-142-2">1983-07-27 | surveying <strike>132</strike> 142 Wed 27th | Mike, Dave</a>
|
|
|
|
<p>Latchensechsen is as hard as ever, and this short trip seemed more tiring
|
|
than thirty hours down 115. Still, plenty of time to get fit. Poked around in
|
|
the huge chamber, but the boulders are too big - size of houses. Surveyed in,
|
|
and buggered off out.
|
|
|
|
<p>- the diabolical datsun nearly made the car park in one go, but then
|
|
boiled over very loudly indeed !
|
|
|
|
<p><a href="#id1983-142-1">Previous trip</a> /
|
|
<a href="#id1983-142-3">Next trip</a>
|
|
|
|
<hr />
|
|
<a id="id1983-142-3">1983-07-27 | 132 = 142 | Becky, Wiggy</a>
|
|
|
|
<p>Went to "the pitch near the entrance" where Wiggy tried very hard to kill
|
|
himself by putting his weight on a hold which broke off. Much of the other
|
|
stuff at the top (in fact, all down) is of the same ilk. The pitch is ~20m w
|
|
a break at 10m*, going to a small rift with a howling gale. Bashed our way
|
|
through a squeeze into another small rift - still with howling gale - which
|
|
chokes.
|
|
|
|
<p>Becky
|
|
|
|
<p>*Put a bolt in on the right hand wall (mainly to calm Wiggy's nerves) but
|
|
actually used a fine natural belay on the other side of the hole, reached by
|
|
traversing to the left.
|
|
|
|
<p><a href="#id1983-142-2">Previous trip</a> /
|
|
<a href="#id1983-142-4">Next trip</a>
|
|
|
|
<hr />
|
|
Wednesday
|
|
|
|
<p>John, Naomi, Nicky, Tony
|
|
|
|
<p>It seemed like a good idea to drive up to the car park and walk around to
|
|
the Wildensee for a swim. Sadly, the temperature was rather high so that
|
|
those of us who were feeling the effects of the previous day found the going
|
|
a little tougher than those who weren't so much but were feeling the effects
|
|
of the heat anyway. What's more its a long way to the Wildensee, but ideal
|
|
for swimming, excellent diving points, lots of little fish nibbling at your
|
|
legs etc. The return via the Appelhaus was arranged by the proprietors such
|
|
that one felt slightly thirsty. One amongst us managed to bop their first
|
|
pint rather quickly (excellent one should add) and a further ¾ pint
|
|
led to a lot of limb waving along the continuation of the path. A high speed
|
|
surge lasted about 35 minutes before it collapsed completely and the eventual
|
|
return to base was rather more subdued.
|
|
|
|
<p>Tony M
|
|
|
|
<hr />
|
|
<a id="lookfutile">1983-07-27 | Surface survey and Prospecting below 115. | Chas, Pete</a>
|
|
|
|
<p>The aim was to find the end of the Futility Series popping out of the
|
|
hillside below 115. We surface surveyed down to a permanent station, marked
|
|
with bolt hole and lots of red paint: P1983/1. This was almost directly below
|
|
115 and on the edge of the big trees. It was at E77.2, N-237.3, H -195.8,
|
|
whereas the end of the Futility Series was at G30: E 139.7, N -54.2, H-187.8.
|
|
So we were (!) at the right place, but the cave end was 180m into the
|
|
hillside. We had a good look round but didn't find any signs of caves there.
|
|
|
|
<p>So we looked at a big phreatic entrance further east (up the valley) and
|
|
~50m higher. This was looked at in 1982, but a bit of proddling released lots
|
|
of boulders + we were able to follow up a narrowing bedding plane at
|
|
~60°, for 10m until it got too loose/small. Very difficult descent on
|
|
scree to the end of the Altausseer See + then the Schniderwirt for Weizen
|
|
Bier.
|
|
|
|
<p align=right>Pete
|
|
|
|
<hr /><a id="id1983-136-1">1983-07-28 | Prospecting below <u>Vd. Schwartzmooskogel</u> | Mike, Pete, Dave, Chas.</a>
|
|
|
|
<p>We sechsten through the Latchen towards the SMK, and reached the top after
|
|
a leisurely lunch on a snow patch. First we inspected the entrance to EXCS's
|
|
cave and then moved east on the southern side of the hill as far as the first
|
|
big valley. Descended a couple of shafts which didn't go, and for the next
|
|
time left a large shaft not descended and another draughting hole with 40m
|
|
pitch to a big chamber and 10m pitch at which we stopped. These were both
|
|
marked 'CUCC 1983' and put a cross on one of the choked shafts (20m). The
|
|
other cave descended was 40m entrance pitch (daylight) then down a slot and
|
|
7m boulder slope to the head of an estimated 10m pitch (undescended).
|
|
|
|
<p>[sketch showing location of:<br>
|
|
137 (1) 40m, 7m slope to head of undescended<br>
|
|
135 (2) Choked 20m<br>
|
|
138 (3) Very large entrance (undescended)<br>
|
|
136 (4) loose headed 40m to big chamber + undescended p10.]
|
|
|
|
<p><a href="#id1983-136-2">Next 136 trip</a>
|
|
|
|
<hr />1983-07-28 | 140 | Naomi + Ben</a>
|
|
|
|
<p>After a very sweaty walk up to the top of the Schwartzmoos and down to the
|
|
cave, Ben and I set about doing a surface survey. The cave entrance was
|
|
measured first giving an opening on the surface 9m x 6m with an entrance
|
|
shaft 15.2m. From the cave entrance a surface survey was carried out to the
|
|
summit of the Schwartzmoos. The cave lies 126m on a bearing of 194° from
|
|
the summit of the Schwartzmoos at an altitude of 1796m. (Oh God - I think
|
|
I've spelt Schwartzmoos wrong all the way through this tome!) After
|
|
surveying, Ben and I retreated to the Bergrestaurant to work out the survey,
|
|
identifying wild flowers on the way down.
|
|
|
|
<p>Naomi
|
|
|
|
<hr />
|
|
<a id="id1983-143-1">1983-07-28 | Thursday | Tony + Nicky</a>
|
|
|
|
<p>After getting the car up to the plateau we had an easy walk up to 113 -
|
|
heading up towards the knoll. Unfortunately Tony found another hole he felt
|
|
impelled to investigate before we got to where we were originally going.
|
|
Whilst Tony messed around underground, I did some snow melt experiments - and
|
|
waited. Having reached the bottom at about 28 metres - Tony gave up and we
|
|
set out again for the Knoll. Near the summit, we located two more holes - to
|
|
be investigated next day. From the top of the knoll saw Julian/John sitting
|
|
above their cave on the SMK - then made our way back indirectly to the car
|
|
park via the thickest bunde patches.
|
|
|
|
<p><a href="#id1983-143-2">Next trip</a> to the "two more holes"
|
|
|
|
<hr /><a id="id1983-145-1">1983-07-28 | Thursday 140 | John & Julian</a>
|
|
|
|
<p>Returned to the hole - thrashing up to the col & over the top, eager
|
|
to revel in the glory just one bolt away. I placed the bolt while Julian took
|
|
hero pictures. Lots of witters followed as I stood in etriers unwilling to
|
|
launch myself over the top. It was all a waste of time anyway - the passage
|
|
draughted but closed down after ~20 ft. Then went back down to the bottom -
|
|
just to confirm there were no loose ends. But there was just one very loose
|
|
end. Julian pretended not to notice it, but I insisted he should have a look,
|
|
while I held back the boulders to allow his return. Another pitch of 8m led
|
|
to an even more conclusive choke. Exited, detackling the lower pitches.
|
|
|
|
<p>Wandered back home, prospecting on the way, and found a horizontal passage
|
|
strongly draughting out. Will return tomorrow...
|
|
|
|
<p>John
|
|
|
|
<p><a href="#id1983-145-2">The return</a> to this horizontal cave (145)
|
|
|
|
<hr />Friday 29th July
|
|
|
|
<p>Super firework display provided by the heavens together with torrential
|
|
downpour cancelled all caving activities, except for fine trip down the
|
|
Koppenbrüllehöhle: EXCS's trip was made even more exciting by
|
|
seeing a completely dry stream bed on entering the cave, not being able to
|
|
visit the lower part of the show cave due to flooding, and finding a stream
|
|
the size of the Wharfe coming out when we came out. The food + drink on this
|
|
trip was excellent - being consumed in large quantities.
|
|
|
|
<hr /><a>1983-07-30 | 140 | Ben, Naomi.</a>
|
|
|
|
<p>Derigged cave up by Schwarzmookögel. Pitch lengths measured as:
|
|
entrance - 15.2, 6, 10m. followed by 5.5, 10, 10.5
|
|
|
|
<hr /><a id="id1983-145-2">1983-07-30? | Wolfhöhle 145 | John, Julian</a>
|
|
|
|
<p>Stopped off to look at Thursday's draughting hole. Wandered in clad in
|
|
shorts + carbide following just one set of footprints of some early explorer.
|
|
Fine little phreatic passage with strong outward draught. After 200', a
|
|
pitch. Exited to find Ben & Naomi to continue the exploration.
|
|
|
|
<p>Ben, Naomi, John, Julian
|
|
|
|
<p>Picked up the tackle from the first hole & trekked over the
|
|
Schwarzmooskogel for the last time. Reentered the new hole complete with
|
|
tackle. Down the pitch to a chamber. Ignored the obvious hole in the floor,
|
|
traversed over a snapping (or snapped?) wolf. Up a loose climb and on through
|
|
phreatic tubes leading down. A bit of a crawl, along and suddenly big, black,
|
|
nothingness.
|
|
|
|
<p>Out to beer & icecreams in the sun at Bar Fischer.
|
|
|
|
<p>John
|
|
|
|
<p><a href="#id1983-145-1">Entrance discovery</a> /
|
|
<a href="#id1983-145-3">Next trip</a>
|
|
|
|
<hr /><a id="id1983-143-2">Tony & Nicky</a>. Sat 30th
|
|
|
|
<p>Returned to look at holes found on Thursday - unfortunately our latest
|
|
short-cut was no better than previous attempts and we were obliged to find
|
|
another hole on the way up. Nevertheless we progressed to the phreatic
|
|
entrance next to the knoll and happily wandered through about 100 ft of
|
|
passage before reaching an intermittently draughting tube slightly blocked by
|
|
boulders. We abandoned this in favour of our second inward draughting rift.
|
|
Tony descended the first pitch to find that the 'solid floor' consisted of a
|
|
few boulders and having reached a point where a further bolt was required
|
|
directly beneath these now mobile elements a retreat was made in order to
|
|
clear this section. Nicky then removed most of the boulders whilst dangling
|
|
from a sling and Tony then descended, placed a bolt, landed on the "floor".
|
|
This turned out to be a boulder the size of the mess tent jammed across the
|
|
rift. Tony placed one bolt for the continuation of the order of 100ft below.
|
|
Then retreated once more. We continued to the hole we had found on our very
|
|
first sortie but had not managed to return to since. Nicky wandered out over
|
|
some boulders to place a bolt hanging from her toenails to give a nice
|
|
freehang. Time ran out but inward draught was promising. We returned to the
|
|
car by an even more interesting (but less bunde-prone) route.
|
|
|
|
<p><a href="#id1983-143-1">Discovery trip</a> /
|
|
<a href="#id1983-143-3">Next trip</a> (deeper cave - 143) /
|
|
<a href="#id1983-144-3">Next trip</a> (the other cave - 144)
|
|
|
|
<hr /><a id="id1983-136-2">1983-07-31 | Cave marked (4) on Planc's sketch. 136 | Mike, Chas.</a>
|
|
|
|
<p>After the excesses of the past couple of days we thought we'd better get
|
|
underground. We rigged a traverse line from the entrance down to the top of
|
|
the first pitch, went down and rigged a couple of pitches down to where we
|
|
could hear the stream. Unfortunately we could only hear it because the way on
|
|
was through a 4" slot.
|
|
|
|
<p>Mike found a short crawl to an inlet - active with a small dribble, much
|
|
like the 115 inlets in dry weather - and below a couple of short,
|
|
semi-free-climbable pitches we came to a decent drop, obviously right over
|
|
the stream. It sounded enormous ! We bolted & Mike descended. The
|
|
streamway is in a rift, and soon disappeared into boulders - foiled again !
|
|
The only lead now is a biggish pitch which is nasty & loose but may bring
|
|
us back below the choke in the stream.
|
|
|
|
<p><img src="136ent.png">
|
|
|
|
<p align=right>4 hrs Chas.
|
|
|
|
<p><a href="#id1983-136-1">136 discovery</a> /
|
|
<a href="#id1983-136-3">Next trip</a>
|
|
|
|
<hr />Sunday 31st Pete, Dave 138 and 139
|
|
<br>Prospecting
|
|
|
|
<p>We first bolted in no. (3) (138) on the sketch, a fine descent led to a
|
|
snow slope, and after descending a snow filled rift by front-pointing in
|
|
wellies, to a snow choked chamber at -40m. Pity. After checking a 13m blind
|
|
shaft we found a rift entrance (139) just below the hillock NE of the VSK,
|
|
which went to 30m to a rift (12cm) which draughted tantalisingly. Pebbles
|
|
went another 15m or so
|
|
|
|
<hr /><a id="id1983-145-3">1983-07-31 | Wolfhöhle 145 | Naomi, Julian, Ben, John</a>
|
|
|
|
<p>Went to visit the hole with the "big black nothingness". Ben's bowel
|
|
movements increased in frequency the nearer we got to this fine feature. At
|
|
the top, Ben wanged in the first bolt before retiring hurt. Muddy Boy
|
|
continued on down looking for unlikely places for bolts. He'd rigged 2 x 20m
|
|
pitches before Julian caught up. Another 20m pitch to a ledge then a pitch
|
|
rigged off a spike. Julian descended this to the floor of the shaft and
|
|
realised Muddy Boy had been left on a ledge with the rope nowhere in sight.
|
|
Leaving Muddy Boy to worry about this he squeezed through into another aven
|
|
with the stream trench cutting down. A bolt was placed for the next 10-15m
|
|
pitch before an exit was made (we'd run out of rope). Muddy Boy was reunited
|
|
with the rope and both went out.
|
|
|
|
<p>Before all this happened or while it was happening, Julian and Naomi had
|
|
followed the phreatic tube beyond the "hole". Across a traverse the passage
|
|
continued to two free climbs up and a climb round a flake to a further
|
|
phreatic passage. Half way along this the draught emanated from a choked
|
|
passage on the right. Beyond a 12m pitch dropped into twin avens and a
|
|
further undescended pitch estimated to be 20m.
|
|
|
|
<p>After all this happened, or in some cases while it was all happening,
|
|
Naomi and Ben went to look at the crawl at the bottom of the lavatory pan.
|
|
This was followed until either Ben's light gave out (official version) or Ben
|
|
got fed up (unofficial shit-stirrer's version, in either case only about
|
|
60').
|
|
|
|
<p>That's all.
|
|
|
|
<p>Julian
|
|
|
|
<p><a href="#id1983-145-2">Previous trip</a> /
|
|
<a href="#id1983-145-4">Next trip</a>
|
|
|
|
<hr /><a id="id1983-142-4">1983-08-01 | Phil's 29th birthday trip down <strike>132</strike> 142 | Wiggy, Gail + Philip</a>
|
|
|
|
<p>Wiggy failed to find the way to the big pitch... We <u>were</u> going to
|
|
rig the hole that Mike was keen on at the NE end of the big chamber ... but
|
|
we couldn't find it. ANYWAY we throttled around a <u>lot</u> at the level of
|
|
the entrance series of 45° interconnected rift and found a 4m x 12m
|
|
chamber, approx 65m high with a pitch take off 15m down from the roof and v
|
|
big jammed boulders 15m down from that. Surveyed from there back to near the
|
|
entrance.
|
|
|
|
<p>Hacked a <u>lot</u> of bunde with a bush knife / bunde-basher / machete,
|
|
path to 132 now almost reasonable.
|
|
|
|
<hr /><a id="id1983-136-3">1983-08-01 | Hole no. (4) Steinschlagschacht 136 | Mike, Chas.</a>
|
|
|
|
<p>We tried the remaining lead in this unpleasant hole and to our dismay it
|
|
seems to go. Went 60m down a rope from the Big Chamber, in a continuous shaft
|
|
which looks as if it takes water in wet weather. At the bottom is a ledge
|
|
with further rift and a black hole which sounds quite deep. Put in three
|
|
bolts while Mike got cold.
|
|
|
|
<p>4½h Chas.
|
|
|
|
<p><a href="#id1983-136-2">Previous trip</a> /
|
|
<a href="#id1983-136-4">Next trip</a>
|
|
|
|
<hr /><a id="id1983-143-4">1983-08-01 | 143 |Pete, Dave</a>
|
|
|
|
<p>With the air of a man selling bits of the real cross, Tony assured us this
|
|
was the one. After slagging his bolting technique, it didn't take long to use
|
|
100m of Edelrid; bash in a bolt, drop down a free hanging 30m shaft, traverse
|
|
to head of next pitch, bash in a bolt. Spacious shafts, textbook rigging, the
|
|
draught still inwards, we were thoroughly enjoying ourselves. At about -140m,
|
|
we came to a sad end - at the foot of the final shaft a very narrow joint led
|
|
off, which would take quite a bit of hammering to allow even Chas through !
|
|
The draught whistled inwards, and the rift looked 10m deep, widening after a
|
|
few feet. After a considerable snack, we hurried out. V. efficient trip, and
|
|
an inspection of the 115/41 survey later seems to show that the end is very
|
|
near, both horizontally and depthwise, to Stellerweg around the big pitch. So
|
|
at least we're in the right area.
|
|
|
|
<p>5½ hours Dave
|
|
|
|
<hr /><a id="id1983-145-4">1983-08-01 | Wolfhöhle 145 | Naomi + Julian.</a>
|
|
|
|
<p>While Muddy Boy fought off nasty gastric microbes and Ben festered, Julian
|
|
and Naomi returned to 'Wolf Cave' to survey as much as possible. The cave was
|
|
surveyed to the climb out of the wolf skeleton chamber, all the side passages
|
|
being measured and investigated. Just inside the 2nd entrance a small passage
|
|
was found to draught strongly inwards - this passage breaking out into a
|
|
small rift leading to a pitch down, estimated to be about 6m. Several
|
|
photographs were taken of the 'Wolf' skeleton as well as one of the main
|
|
phreatic passage and the 1st pitch.
|
|
|
|
<p>As carbide, water etc. were running low, an exit was made from the cave.
|
|
On gaining the surface a survey was made from the entrance of 'Wolf' cave
|
|
past the 2nd entrance and down to CUCC 82. Wolf cave is 29.5m above 82.
|
|
|
|
<p>Naomi
|
|
|
|
<p><a href="#id1983-145-3">Previous trip</a> /
|
|
Next trips: <a href="#id1983-145-5">Pushing</a> /
|
|
<a href="#id1983-145-6">Tidying</a>
|
|
|
|
<hr /><a id="id1983-143-3">1983-07-31? | Sunday 143 | Tony, Nicki</a>
|
|
|
|
<p>Returned via the most direct obvious route in just one hour to where we
|
|
were last. Having eventually changed - Tony wanged down 1st pitch after
|
|
carefully checking the brilliant bolting. Whilst putting in another bolt over
|
|
a possible 13ft free climb Nicky climbed up over the boulders to look into
|
|
the adjoining entrance shaft, lighted from above. At bottom of "free" climb,
|
|
lobbed rocks of various sizes down a hole - very scary. Fixed two not so well
|
|
placed bolts above 2nd/3rd pitch at the end of short rift - and having
|
|
estimated it to be a good 25m went on swiftly out and back across the SMK to
|
|
find a few more promising holes for other people to go down. Several hours.
|
|
|
|
<p>Nicky
|
|
|
|
<p><a href="#id1983-143-2">Previous trip</a> /
|
|
<a href="#id1983-143-4">Next trip</a>
|
|
|
|
<hr /><a id="id1983-144-3">1983-08-01 | 144 | Tony + Nicky </a>
|
|
|
|
<p>Having excited Dave + Pete to such an extent that they were willing to go
|
|
down our previous hole, we led them more or less the same way back to the
|
|
hole beneath the knoll and left them while they went off to collect their
|
|
caving gear. We continued the 100 yds and one bedding over to the east to
|
|
extend our other inward draughting hole. Tony changed and lay gasping in the
|
|
extreme heat while Nicky went off to try to pinch some MRs from D + P - none
|
|
available so Tony just rerigged as he went and descended a further 75' pitch
|
|
(rather fine though not quite freehanging) which landed on a large boulder
|
|
strewn ledge. Several large (tent-size) boulders formed the edge of the next
|
|
pitch in a rift 15' wide heading east - the visible floor consisted of three
|
|
(visible) large holes, one of which allowed boulders to drop for a count of
|
|
9, possibly 4-5 seconds. Prospects do not seem unreasonable but a free hang
|
|
would require an interesting bit of work for bolting. Good luck to those who
|
|
take over from us. Finding our way back was not as simple as the way over to
|
|
the knoll.
|
|
|
|
<p><a href="#id1983-143-2">Previous trip</a> /
|
|
<a href="#id1983-144-4">Next trip</a>
|
|
|
|
<hr />TUESDAY 2nd August
|
|
|
|
<p>Ben, Nicky, Tony
|
|
|
|
<p>Managed on this major GONK DAY to do some prospecting on the Toplitzsee by
|
|
row-boat - bloody magic. Lots of large holes in the surrounding cliffs and
|
|
entered one near lake level draughting out very strongly. Suggestions that in
|
|
future years a raft should be built in the centre of the lake with detachable
|
|
portions for each tent allowing p.i.t.a. to be detached and floated away.
|
|
This central position would allow for easy freedom of movement. Furthermore
|
|
from the Kammersee a rope would be rigged off the 300ft+ cliff for abseil +
|
|
prussick work to exclude all the horrible walking up steep slopes. The total
|
|
potential could be as much as 1000m+, one of the lakeside waterfalls being
|
|
shown as a resurgence at about 1300 metres. Anyway, whatever the depth
|
|
potential this area has certainly not been looked at and the potential for
|
|
finding complex systems would appear quite extensive. (Rowing across the lake
|
|
is more pleasant than trudging across the bunde).
|
|
|
|
<hr />WEDNESDAY 3rd August
|
|
|
|
<p>Nicky + Tony 146
|
|
|
|
<p>Set off rather hopefully to investigate new find about 300 yds from Wolf
|
|
Hole. Cloud + weather conditions proved to be somewhat unsuitable for such an
|
|
exercise and materials were collected instead.
|
|
|
|
<p>The rest fed, festered and farted all day long.
|
|
|
|
<p>No we didn't. We let Julian take us up a mountain which was a mistake.
|
|
|
|
<hr /><a id="id1983-145-5">1983-08-04 | WOLFH&OUML;HLE 145 | John & Julian</a>
|
|
|
|
<p>Following the stream down, pitches of 5m, 15.4m, 15.4m, 10.5m and 17.4m
|
|
were rigged. The latter two pitches formed the top part of another large
|
|
shaft and landed on a very wet ledge. Muddy boy valiantly put another bolt in
|
|
well round a corner to try to keep out of the water. This was descended for
|
|
about 10m in a spacious shaft*. With the amount of spray around and complete
|
|
dearth of lobbable boulders it wasn't possible to tell whether the rope
|
|
reached so M.B. wisely decided to ascend. Estimated depth of cave to head of
|
|
last pitch 160m. Length of pitches (from entrance) - all measured.<br>
|
|
* Tiddley pom pitch
|
|
|
|
<pre>
|
|
19m 5m
|
|
20m } Pitches 15.4m
|
|
25m } in large 15.4m
|
|
22m } shaft 10.5m
|
|
14.5m } 17.4m
|
|
</pre>
|
|
|
|
<p align=right>Julian
|
|
|
|
<p><a href="#id1983-145-4">Previous trip</a> /
|
|
<a href="#id1983-145-6">Ben & Naomi's trip</a> (same day)<br>
|
|
Next trips: <a href="#id1983-145-7">entrance loose ends</a> /
|
|
<a href="#id1983-145-8">surveying from Big Leap</a>
|
|
|
|
<hr />1983-08-04 | WOLFH&OUML;HLE 145 | Ben and Naomi</a>
|
|
|
|
<p>Went down tube followed by rift near lower entrance. At bottom of rift 6m
|
|
pitch was bolted. Lands in chamber with hole & boulder slope into bigger
|
|
shaft, fortunately only another 6m with large boulder passage leading down to
|
|
top of climb. On right, small phreatic tube with strong outward draught (on a
|
|
day with a lot of water about) gets too small for me after 20-30 feet. At
|
|
start of tube pulled out a few boulders to reveal 20 ft climb, but continued
|
|
presence of boulders at the top called an abort. Climb down at bottom of
|
|
boulder passage is 8ft. Leads to further climb down, luckily choked by more
|
|
boulders. Passage to left at bottom of 8ft climb goes to black muddy dry pool
|
|
fed by water from climb above. Climb gets too small vertically but leads back
|
|
horizontally to top of 8ft climb. Derigged two pitches - unless the big pitch
|
|
route stops soon 20 ft climb with continued presence of boulder not worth
|
|
doing: probably lead to 82 anyway.
|
|
|
|
<p>Time: 4 hrs !!
|
|
|
|
<p>Ben
|
|
|
|
<p><a href="#id1983-145-4">Previous trip</a> /
|
|
<a href="#id1983-145-5">John & Julian's trip</a> (same day)<br>
|
|
Next trips: <a href="#id1983-145-7">entrance loose ends</a> /
|
|
<a href="#id1983-145-8">surveying from Big Leap</a>
|
|
|
|
<hr /><a id="id1983-136-4">1983-08-04 | Steinschlagschacht 136 | Mike, Chas</a>
|
|
|
|
<p>The weather in camp brightened somewhat so we zoomed up to the
|
|
Bergrestaurant and gazed at the low cloud. Eventually extreme boredom forced
|
|
us to walk up to the cave to collect our oversuits which would have blown
|
|
away in the savage storms of the previous few days. It was snowing hard when
|
|
we reached the top of the SMK but unfortunately we could see our wooftah
|
|
suits clearly so after a bit of wittering we shook the snow from our furry
|
|
gear, clenched our teeth and descended.....
|
|
|
|
<p>It sounded deep & very wet so Mike stayed at the top of the rift &
|
|
froze silently while Chas. gardened & rigged the topsail rope. At the
|
|
bottom of the rift ~50-60m 2 black holes - a dry very deep sounding one -
|
|
which was left and a damp 35m shaft into a streamway rift going down at least
|
|
100' and producing another couple of black holes. The draught had reversed
|
|
today even though outside was still warmer than the horrible hole. Despite
|
|
attempts to fill the place with boulders, dead bodies* & rope ends, it
|
|
still seems to be going so someone will have to go & derig it. The walk
|
|
back was accomplished in zero vis & torrential rain & hail, sod this
|
|
for a game of cricket. 4 hrs
|
|
|
|
<p>* I dropped a halfbrick square on Mike's helmet.
|
|
|
|
<p><a href="#id1983-136-3">Previous trip</a> /
|
|
<a href="#id1983-136-5">Next trip</a>
|
|
|
|
<hr />
|
|
<p><a id="id1983-142-5">1983-08-04 | 132 or <strike>is</strike> it is
|
|
<strike>136</strike> 142 now | Phil & Gail</a>
|
|
|
|
<p></p> - 5 hours
|
|
|
|
<p>Phil & Gail also finally defestered themselves from the Bergrestaurant
|
|
to discover pastures new in 132/6. The weather was Lake District disgusting
|
|
and it hailed as we hacked up the bunde. After attempts to correlate the
|
|
two surveys, the 2nd pitch was bolted in the dripping chamber which was,
|
|
under <u>these</u> weather conditions, filled with spray. Well, perhaps not
|
|
<u>filled</u>. Anyway, while doing this, there came a minor whooshing sound
|
|
at about 18-45 and it got a little wetter + I dropped a hanger + MR down
|
|
the pitch. Finished bolt (at least 1.500x10<sup>3</sup> Kgf on the Brindle
|
|
scale (est.)) and didn't rig it because it looked wet down there...
|
|
|
|
<p>Instead, went out of chamber and pulled up rope out of the water (the bolt
|
|
below in the chamber was not rigged) and left 1x13m and 1x15m rope there for
|
|
next time, the rope on the pitch is 35m, I think. Then we clambered up
|
|
Wiggy's Way (45° up and intersected the same stream higher up - excellent
|
|
clamberable stream in clean, white limestone, a bit like Tatty but sharper.
|
|
If this cave connects with 41 then this would be the way to get extra height.
|
|
Gail did a couple of legs up the slope (whilst Philip was bolting) but gets a
|
|
bit damp so return trip in dry weather. Back to main route to have a look at
|
|
the Big Chamber - failed to find it AGAIN. Sketch a lot of drips and
|
|
chambers, find a crawl bypass to the Bad Step (we think).
|
|
|
|
<p>V. bad walk back in vis. down to 6-7' ! Overtaken by Demon Datsun on the
|
|
Toll Rd. Left 20m rope by cairn after entrance tube + bypass.
|
|
|
|
<p><a href="#id1983-142-4">Previous trip</a> /
|
|
<a href="#id1983-142-6">Next trip</a>
|
|
|
|
<hr />
|
|
<a id="id1983-144-4">1983-08-04 | Tony's 2nd Hole 144 | Pete, Dave</a>
|
|
|
|
<p>[A Sat] Having chacked the bogs in the Bergrestaurant (recommended by
|
|
muddy boy) we hurried up to the entrance. Pete found his gear rather wet and
|
|
complained quite a lot before changing. A short bunde bash to the entrance
|
|
and we were in. The head of the first pitch was rather loose, and so felt my
|
|
stomach, but we pressed on and ...
|
|
|
|
<p>[sketch of pitch lengths]
|
|
|
|
<p>The top bits are very loose, the middle bit vertical like the rift in 115.
|
|
We hit a small bit of horizontal phreatic stuff + thought we were about to
|
|
walk into Stellerweg, but it carried on down. 2 pitches later we hit a big
|
|
stream in a very high canyon ~2m wide. At the top of an estimated 20m pitch
|
|
we had run out of rope and hangers with only 1 anchor left. Despite a meal of
|
|
sardines we were back out of the entrance in an hour to the last of the
|
|
daylight. A somewhat epic walk back in darkness and 10 feet viz mist.
|
|
Directional guidance from cowbells brought us back to the path. Back to the
|
|
Staudnwirt in time for last orders.
|
|
|
|
<p>7 hrs Pete 'n' Dave
|
|
|
|
<p><a href="#id1983-144-3">Previous trip</a> /
|
|
<a href="#id1983-144-5">Next trip</a>
|
|
|
|
<hr />
|
|
|
|
<p><u>Friday 5th Mass Jacking Day</u>
|
|
|
|
<p>We went to Salzburg to do the round of the gear shops (courtesy of Wiggy)
|
|
and to consume coffee and strudels. A hopeful-looking gear shop was spotted
|
|
on the way in but turned ghostly when we sought nearer aquaintance. Chas
|
|
& Wiggy drooled over about 5 gear shops in total, buying 2m of 4mm
|
|
rope.
|
|
|
|
<p>Team FARTPOWER blasted into Salzburg and found an English looking pub
|
|
for a meal of Schnitzel and chips. After a look around the castle we found
|
|
a fine dingy bar for cakes, coffee, and beer.
|
|
|
|
<p>Team Kulture left team gearshops after a Deli lunch in the street. Took in
|
|
the Resident Galeris and the Dom, looked at the [???] outside the Dom Museum
|
|
and thus avoided paying entry fee. As a token gesture we looked at
|
|
calculators to fill in time before rendezvousing with team gear shop.
|
|
|
|
<hr />
|
|
|
|
<p>Saturday 6th
|
|
|
|
<p>Dave was so keen to avoid caving that he sliced his finger in two with
|
|
a pair of scissors.
|
|
|
|
<hr />
|
|
<p><a id="id1983-142-6">1983-08-06? | 142/41 | Phil, Julian, Naomi</a>
|
|
|
|
<p>After a long wet walk up to the entrance, the intrepid trio finally went
|
|
underground. The pitch in Phil's extension was quickly gained and Julian
|
|
kitted up and went off down the 1st pitch of 7m to a pile of jammed boulders.
|
|
From this platform another pitch of 20m to a rebelay and another 10m to a
|
|
floor lead on. From this a pitch of 5m reached another floor with a stream
|
|
leading on down, which was not pushed to a conclusion.
|
|
|
|
<p>While Julian was exploring the pitches, Phil and Naomi worked back towards
|
|
the main route climbing up assorted 45° ramps towards the roof. One
|
|
particular one was followed up some steep climbs to a pot with water falling
|
|
down it. down the pot, a 20' (approx) climb lead to a boulder floor - the
|
|
ascent of the pot would need tackle and so was left. Phil and Naomi arrived
|
|
back at Phil's pitch just as Julian was grovelling up to the top. All the
|
|
tackle from Phil's pitches was moved back to the main route junction and the
|
|
trio then left to find the Main Route Big Pitch Route into the large chamber.
|
|
Various ramps and tubes were investigated and the ramp/chamber leading to the
|
|
big pitch was pretty well investigated - a route being pushed down to the
|
|
bottom where it chokes. Near the top, on the right, a route was pioneered
|
|
down a tube and across a ramp and then up a freeclimb at the end of the ramp.
|
|
At the top of the ramp turn right and this comes into a very large sloping
|
|
chamber. Descend to the bottom of the chamber and next to a very large block
|
|
is the old landing of the 18m pitch in Stellerweg. Julian and Naomi and Phil
|
|
then climbed up from the block and down into the Stellerweg double traverse
|
|
passage where Julian positively identified the bolt hole - so the connection
|
|
was confirmed. The trio then made their way back to the entrance, taking
|
|
several photos on the way out.
|
|
|
|
<p>Naomi
|
|
|
|
<p>5 hours underground
|
|
|
|
<p><a href="#id1983-142-5">Previous trip</a> /
|
|
<a href="#id1983-142-7">Next trip</a>
|
|
|
|
<hr />
|
|
<a id="id1983-143-5">1983-08-06 | 143 | Pete, Chas</a>
|
|
|
|
<p>We surveyed in and derigged out. It was fairly damp today & Chas
|
|
whinged all the way down.
|
|
|
|
<p>We marked the path to the pot with wads of yellow tape, diving line, bin
|
|
liners fluttering from branches of Latschen and millions of cairns. Pete
|
|
sawed valiantly away with a baby hacksaw. Unfortunately it was daylight when
|
|
we came down again so we couldn't test its efficiency, but it's good in
|
|
daylight. 25 mins down to Stögerweg and another 25 mins back.
|
|
|
|
<p align=right>5 hrs. C.</p>
|
|
|
|
<p><a href="#id1983-143-4">Previous trip</a> /
|
|
<a href="../1984/log.htm#id1984-143-1">Next trip</a> (next year)
|
|
|
|
<hr />
|
|
<p><a>1983-08-07 | look for resurgences | Phil & Gail</a>
|
|
|
|
<p>We went to look for resurgences near the road to the plateau. We did find
|
|
a couple of streams by walking off down the piste from the third hairpin bend
|
|
right <u>up</u> the road :-
|
|
|
|
<p>Movement up the second streamway was severely hampered by felled pine
|
|
trees and extremely forceful nettles. Somewhere around here is something
|
|
marked "höhle" on the map.......
|
|
|
|
<p>[sketches captioned "what the map says ... what we saw"]
|
|
<hr />
|
|
<p>7th AUGUST
|
|
<p>Mike, Julian, Naomi, Chas and Wiggy
|
|
<p>Investigated various large dry streambeds near Nagelsteghöhle in an
|
|
attempt to find the same. A large draughting hole marked 1626/5 was found
|
|
between two streambeds which consisted of a 15' climb down to a shingle slope
|
|
leading down into the cave. Party retired to the pub.
|
|
|
|
<p><u>Addendum</u>
|
|
|
|
<p>Later examination of a selection of maps displaying relevant markers
|
|
such as the toll road and the ski lift leave us with the impression that
|
|
the resurgence has been bulldozed to make the track to the skilift pylon.
|
|
|
|
<hr />
|
|
<p><a id="id1983-145-7">1983-08-08 | WOLFHÖHLE 145 | Gail & Philip</a>
|
|
|
|
<p>We were led to the cave by Naomi & Wiggie and went and saw the 'Wolf'
|
|
(actually, I think it might be a bear) then went and explored the only loose
|
|
end in the Makins - Van Millingen explorations. Yes, the tube is tight but,
|
|
after tweaking the solid surface with our trusty "entrenching" tool, we were
|
|
able to plough our way through. It leads, after 30 or 40 ft and a bend to a
|
|
1.5m diameter phreatic tube, left hand leads up (at c 5°) to a chamber
|
|
and right chokes with mud after a bit.
|
|
|
|
<p>[sketch labelled "proper sketch in survey book" (1)]
|
|
|
|
<p>Previous trips: <a href="#id1983-145-5">push to Tiddley Pom</a> /
|
|
<a href="#id1983-145-6">leads near entrance</a><br>
|
|
<a href="#id1983-145-8">Naomi & Wiggy's trip</a> (same day)/
|
|
<a href="#id1983-145-9">Next trip</a>
|
|
|
|
<hr />
|
|
<p><a id="id1983-145-8">1983-08-08 | WOLF HOLE 145 | Naomi & Wiggy</a>
|
|
|
|
<p>Quickly made our way to the 'Big Leap' where Wiggy was duely despatched
|
|
over the leap and into the passages beyond to collect a rope and bolt driver.
|
|
On Wiggy's return the pair then surveyed their way out towards Wolf Chamber
|
|
from the lip of the 'Big Leap'. Surveying went relatively smoothly except for
|
|
multiple light failure in the tight pitch by-pass crawl and a very opaque
|
|
compass (it would <u>not</u> clear!). Finally, in the main passage towards
|
|
the Toilet Seat Climb, the compass fogged forever, the survey was abandoned
|
|
and the pair made their way out. On the surface the compass unfogged amd so
|
|
Wiggy and Naomi did a surface survey from Wolf Höhle entrance to the
|
|
iron cross on the Col.
|
|
|
|
<p>Naomi
|
|
|
|
<p>Previous trips: <a href="#id1983-145-5">push to Tiddley Pom</a> /
|
|
<a href="#id1983-145-6">leads near entrance</a><br>
|
|
<a href="#id1983-145-7">Gail & Philip's trip</a> (same day)/
|
|
<a href="#id1983-145-9">Next trip</a>
|
|
|
|
<hr />
|
|
<a>1983-08-08 | 142-41-?-?-Eishöhle Surface surveying (but not the last part) | Plank & Julian</a>
|
|
|
|
<p>A gentleman's festering day. Starting at 142, Plank went charging up the
|
|
schwarzmoos Kogel dragging the surveying tape, intruments and Julian behind
|
|
him Complaints from Julian that this upward flight was somewhat unnecessary
|
|
as 41 and 142 were at the same height brought him temporarily to his senses
|
|
and he disappeared for a while into a particularly virulent patch of bunde.
|
|
Half an hour later the pair were sat on a bunde nest, scanning eagle-like for
|
|
the entrance to 41. This was spotted way below and after a quick visit to a
|
|
nearby telephone box to change into a chamois outfit the first leg of the
|
|
surface survey was complete.
|
|
|
|
<p>From this point on, Plank seemed to have a greater comprehension of where
|
|
he was meant to be going (although this could have been confused with a
|
|
continuing desire to get to the top of the Schwarzmoos). Odd grunting and
|
|
sweet-sucking noises punctuated the next twenty or so legs before the top of
|
|
Bunter's Bulge hove into sight. Pause for heavy breathing, more sweet sucking
|
|
and altitude adjustments to the digestive system. Then onto to Bunter's Holes
|
|
and the end of surveying for the day.
|
|
|
|
<p>Back on Bunter's Bulge Plank started admiring the sight of his 20' free
|
|
fall the other day when a line of surface cairns were spotted. Being simple
|
|
creatures, the pair were lured on, and on, and on, and on, over hill, down
|
|
dell, etc. till the cairns ran out. Being keen boy scouts though, they
|
|
spotted a campfire below with plenty of freshly cut bunde beside.
|
|
|
|
<p>Plank couldn't resist the prospect of even more bunde and chortled off
|
|
down the slope. As he got lower and lower, his heavy footsteps took on more
|
|
of an echo. Turning round at the camp fire, his mouth fell open to match the
|
|
gaping maw of he Eishöhle that faced him. About half an hour of combined
|
|
wonderment followed before the pair poddled back to the Bergrestaurant.
|
|
Ignoring enticing party like attachments to the bunde the duo stuck solidly
|
|
to the cairns (nothing queer with Caruthers, but I'm not sure about Plank).
|
|
Approx 80 minutes from the Eishöhle we reached the car park. A very long
|
|
festering day.
|
|
|
|
<p align=center>Julian</p>
|
|
|
|
<hr />
|
|
<p><a id="id1983-136-5">1983-08-08 | 136 Steinschlag | Mike, Chas</a>
|
|
|
|
<p align=center><u>Pushing, surveying & derigging trip</u></p>
|
|
|
|
<p>We pushed on another pitch or two. At about -150m we met phreatic ramps at
|
|
about 45° but then descended below this into a clean shaft again. Placed
|
|
a final bolt and plumbed the pitch with the tape but didn't go down it. Depth
|
|
194m to top of this pitch which is >30m so at least 224m total depth.
|
|
|
|
<p>The exit was enlivened by Chas dropping his stinky sealing ring down a
|
|
hole in the boulders in the Big Chamber. Cave seems to be going strong.
|
|
|
|
<p align=right>7 hrs</p>
|
|
|
|
<p><a href="#id1983-136-4">Previous trip</a> /
|
|
<a href="../1984/log.htm#id1984-136-1">Next trip</a>
|
|
|
|
<hr />
|
|
|
|
<a>1983-08-09 | SURFACE SURVEYING / ROPE REMOVING | CHAS, NAOMI, MIKE</a>
|
|
|
|
<p>After a late start the trio made their way up to 136 Höhle. While
|
|
Mike went off to paint numbers on cave entrances, Chas and Naomi carried out
|
|
a surface survey from 136 to the top of the Schwarzmoos. All the rope was
|
|
removed from 136 and the trio made their wearisome way down to Wolf
|
|
Höhle to paint numbers at the entrance. While Miss Makins navigated
|
|
masterfully from the Schwarzmoos to Wolf Höhle, Mike whinged! Having
|
|
painted the numbers on, and yodelled at Chamois, the trio made their way back
|
|
to the Bergrestaurant.
|
|
|
|
<p>N.M.
|
|
|
|
<p>When we reached the top of the SMK we found that Franz Seebacher (+ Tritoi
|
|
and young Herbert) had been there today, but we didn't see them. Checked down
|
|
Planc's hole in the path, but no sign.
|
|
|
|
<hr />
|
|
<a id="id1983-142-7">1983-08-09 | 142 - 41 CONNECTION SURVEYING AND DERIGGING | PMS, BGS</a>
|
|
|
|
<p>Blasted on down to the foot of the pitch in Stellerweg and surveyed back
|
|
to one of Dave's survey marks in the chamber before the big chamber in 142.
|
|
|
|
<p>Went down the big pitch, admired the bolts and denigrated the rigging.
|
|
Wandered around Big Chamber with bolting kit looking for Mike's hole in the
|
|
floor but didn't find it. It all looked pretty broken up, somewhere through
|
|
that lot there must be a crawl bypass to the big pitch.
|
|
|
|
<p>Came out and derigged. On the way back did a couple more survey stations
|
|
at the points where our & Dave's surveys diverged slightly.
|
|
|
|
<p>Out to stars and a leisurely walk back. Back at camp at 0130.
|
|
|
|
<p align=center>7½ hours underground PMS + BGS</p>
|
|
|
|
<p>P.S. dusty phreatic passages that have not been touched since the last
|
|
ice age are not recommended for contact lens wearers.
|
|
|
|
<p><a href="#id1983-142-6">Previous trip</a> /
|
|
<a href="../1984/log.htm#id1984-142-1">Next trip</a> (next year)
|
|
|
|
<hr />
|
|
<p><a id="id1983-145-9">1983-08-09| wolf | Julian + Wiggy</a>
|
|
|
|
<p></p> went down the Wolf 'Ole to
|
|
put in a few bolts + leave some rope. Used 7 more bolts at a rate of ~ 1.5
|
|
per pitch (natural belays used for some backups). Had great fun messing
|
|
around on Bower's re-belays.
|
|
|
|
<p>The cave is now ~300m ish + still going on and on and on.
|
|
|
|
<p>Previous trips: <a href="#id1983-145-7">entrance loose ends</a> /
|
|
<a href="#id1983-145-8">surveying from Big Leap</a> /
|
|
<a href="#id1983-145-10">Next trip</a>
|
|
|
|
<hr />
|
|
<p><a id="id1983-144-5">1983-08-07 | Tony's 2nd Hole 144 | Pete, Dave</a>
|
|
|
|
<p>I can't remember much about this trip, but we took about 100m of rope
|
|
each, and having rigged one more pitch we hit the phreatic level. Moving
|
|
west, we lost the main way on by descending a mud wall and then a steep
|
|
boulder slope for quite a way. Eventually hit a streamway which soon
|
|
resembled Purgatory too much for our liking, so made a slow exit. Left rope
|
|
for next trip.
|
|
|
|
<p><a href="#id1983-144-4">Previous trip</a> /
|
|
<a href="#id1983-144-6">Next trip</a>
|
|
|
|
<hr />
|
|
<a id="id1983-145-10">1983-08-10 | 1623/145 | Naomi + Wiggy</a>
|
|
|
|
<p>Went back down the Wolf cave to complete our survey of a couple of days
|
|
ago. Tick, did it. Wiggy's light failed on the way out but team techno-lite
|
|
came to the rescue. Met the derigging team at the entrance.
|
|
|
|
<p><a href="#id1983-145-9">Previous trip</a> /
|
|
<a href="#id1983-145-11">Next trip</a> (derig)
|
|
|
|
<hr />
|
|
<p><a id="id1983-145-11">1983-08-10| Derigging team |Mike, Chas, Julian</a>
|
|
|
|
<p>Derigged and surveyed. 7¾ hours
|
|
|
|
<p>Beware of loot eating porcupines !
|
|
|
|
<p>Julian
|
|
|
|
<p><a href="#id1983-145-10">Previous trip</a> /
|
|
<a href="../1984/log.htm#id1984-145-1">Next trip</a> (next year)
|
|
|
|
<hr />
|
|
<p><a id="id1983-144-6">1983-08-09 | Tony's 2nd Hole 144 | Pete, Dave</a>
|
|
|
|
<p>We knew this would be a big trip so we took lotsa grub. Sixteen and a half
|
|
hours later we crawled out to fine dawn having surveyed, pushed most obvious
|
|
leads, and then derigged. The survey showed that the passage you can see
|
|
across the mudwall pitch is only 130m from the phreatic levels in 41 around
|
|
the head of the big pitch. Quite a heap of rope at the entrance - the 125m
|
|
Marlow caused some problems. Hot soup much appreciated.
|
|
|
|
<p align=right>16½ hours, Dave
|
|
|
|
<p><a href="#id1983-144-5">Previous trip</a> /
|
|
<a href="../1985/log.htm#id1985-144-1">Next trip</a> (1985)
|
|
|
|
<hr />
|
|
<!-- LINKS -->
|
|
<ul id="links">
|
|
<li>1983 Expedition info:
|
|
<ul>
|
|
<li>Main Expo report, Cambridge Underground 1984:
|
|
<ul>
|
|
<li><a href="wolf1.htm">Wolfehohle</a> - Act I</li>
|
|
<li>Exploration and Survey of <a href="exp142.htm">1623/142</a>
|
|
<ul>
|
|
<li><a href="exp142.htm#possext">Possible extensions</a>
|
|
to the 41-142-115 System</li>
|
|
</ul></li>
|
|
<li><a href="143144.htm">143 and 144</a> Guidebook descriptions</li>
|
|
<li><a href="41svy.htm">142/41 Survey</a> - the truth</li>
|
|
<li><a href="list.htm">Summary of Caves 1983</a></li>
|
|
</ul></li>
|
|
<li><a href="bcracc.htm">BCRA Caves & Caving Report</a></li>
|
|
</ul></li>
|
|
<li><a href="../../pubs.htm#pubs1983">Index</a> to all publications</li>
|
|
<li><a href="../../index.htm">Back to Expeditions intro page</a></li>
|
|
<li><a href="../../../index.htm">CUCC Home Page</a></li>
|
|
</ul>
|
|
</body>
|
|
</html>
|