mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2024-11-27 01:32:03 +00:00
966 lines
47 KiB
HTML
966 lines
47 KiB
HTML
<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.0//EN">
|
|
<html>
|
|
<head>
|
|
<meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1" />
|
|
<title>
|
|
1982: Logbook
|
|
</title>
|
|
<link rel="stylesheet" type="text/css" href="../../css/main2.css" />
|
|
</head>
|
|
<!-- 113 trips not threaded or linked -->
|
|
<body>
|
|
<h1>Expedition 1982</h1>
|
|
Arrive Saturday (24th July 1982) evening to glorious sunshine. Sunday dull,
|
|
examine lake from pedalo. Large canvas erection appears, much to horror of
|
|
everyone else on campsite. Uncouth rabble now appears and makes much noise
|
|
until uncivil hour in morning. Visit toll road.
|
|
|
|
<p>Monday visit toll road, visit plateau in misty wet conditions: no view; no
|
|
hot sun !
|
|
|
|
<hr /><a id="id1982-115-1">Tuesday Wave 1</a>
|
|
|
|
<p>Tuesday David & Ian Brindle rig first section of ramps. 4 new bolts
|
|
placed. One on short pitch near entrance made redundant as no likes
|
|
prusikking up this delightful short pitch. Ramp declared open and much
|
|
improved. Fall off ramp whilst trying to place bolt, give up ! Second wave
|
|
arrives and takes over rigging ramp.
|
|
|
|
<p align=right>9 hrs or so<br>Tuesday was wet again!
|
|
|
|
<hr /><a id="id1982-115-2">27th Tuesday</a> 115 wave
|
|
2 Mike + Phil
|
|
|
|
<p>A good trip for dropping tackle, though all recovered this year unlike
|
|
last year's ammo can. The entrance series to 115 hasn't changed much, grotty
|
|
as ever. We reached the head of the ramp and voices, the Bouncing Brindles
|
|
were buggering about with bolts. After some discussion we took over and Mike
|
|
bolted a rather greasy traverse and a greasier abb down to the foot of the
|
|
Ramp - but out of the big hole which caused so much complaint last year. The
|
|
seemingly endless piece of Marlow took us half way down the Rift pitches to a
|
|
rather frighteningly perched half ton boulder. We slung a rope on the next
|
|
pitch and exitted. A good 8 hr breaking in trip and having dropped a tackle
|
|
bag, hammer, driver, gloves numerous times and sealing ring we should both
|
|
have exhausted our golden boot potential.
|
|
|
|
<p align=right>8 hrs
|
|
|
|
<p><a href="#id1982-115-3">Next trip</a>/
|
|
<a href="#id1982-115-1">Previous trip</a>
|
|
<hr />27th Tuesday 113 Andy W + Pete
|
|
|
|
<p>Having calculated all the tackle to the nearest inch, the rigging in was
|
|
bound to be superbly efficient and smooth - WRONG ! The entrance pitch was
|
|
easy, then Andy tried to pioneer a new route to Fox's Glacier. Once a safe
|
|
route was relocated, life got complicated since Point Five Gully was
|
|
completely iced over - exit one 50+m rope meant for lower down. More big ice
|
|
formations in Barnsley Methodist Chapel then cock-up no. 2, a 15m rope for a
|
|
14m pitch with a 10m belay. A 22m rope didn't quite reach, much to Andy's
|
|
annoyance, so exit another 50+m rope meant for lower down. The next rope was
|
|
perfect though, and the smooth efficiency started to appear. Rigged right on
|
|
down the Opera House and Purple Pit to -210m and dumped remaining tackle
|
|
(just one short rope) before muesli crawl. Then up and out to a rainy, dark,
|
|
grotty evening. 7 hrs.
|
|
|
|
<br>Desperate walk back in wet black gravity. Missed pub but beer in car.
|
|
|
|
<p align=right>~ 7 hrs.
|
|
|
|
<hr />27th Tuesday <a id="id1982-115-S">Surface survey</a>
|
|
from 113 to 115
|
|
|
|
<p align=right>Andy D, Chas.
|
|
|
|
<p>Having been shown where 113 lurks, we surveyed down the gully & along
|
|
the path to 115. We used two staffs, compass, clino & tape.
|
|
|
|
<p>We left permanent survey stations outside 113, halfway down the 113 gully,
|
|
at 87, at 88 and outside 115. 113 is 164m or something above 115. Caused much
|
|
amusement to local tourists. <---- <i>This ain't caving</i> <font
|
|
size=-1>but it is relevant</font>
|
|
|
|
<p>Survey at back of book
|
|
|
|
<hr /><a id="id1982-115-3">28th Wednesday</a> July
|
|
|
|
<p>Wave 1 115 Rigging rift Ian B &
|
|
Chas
|
|
|
|
<p>Another half past six start so we were down in good time. The less said
|
|
about this trip the better. I couldn't find last year's route in the rift so
|
|
nearly gave myself a hernia placing a free-hanging bolt of which more anon.
|
|
Then under the boulders at the top of the inlet pitch which was a fairly
|
|
trepidating experience. Mucked about with a couple of ladders at the
|
|
entrance, met wave 2, and then we'd made a pig's ear of it & went out.
|
|
|
|
<p align=right>8 hrs
|
|
|
|
<p><a href="#id1982-115-4">Next trip</a>/
|
|
<a href="#id1982-115-2">Previous trip</a>
|
|
<hr /><u><a id="id1982-115-4">Wave 2</a> 115</u> Rigging
|
|
to Big Chamber Andy D, Dave B
|
|
|
|
<p>Well the sun was shining so wave 2 only reached the cave at half three.
|
|
God I hate this strenuous boring entrance series. Down the Ramp, mucho
|
|
improved. Incidentally, we passed wave 1 at the Bell Pitch - we we late or
|
|
were they early ? Chas had rigged a fine free hanging bolt but it was removed
|
|
and the old route taken down to the inlet. After much indecision whether to
|
|
go over or under the boulders we bolted out under, and on each successive wet
|
|
pitch we traversed out as far as we could, using the rope from the pitch
|
|
above as aid, to bolt. This made the changeovers strenuous but the pitches
|
|
are dry. At last we dropped down the fine pitch into the Chamber, still as
|
|
big as ever, the stream seemed quite high. Andy didn't say much (his first
|
|
trip) but I coukd see he was enjoying it really. We dumped rope, food, hexy
|
|
burners, sardines etc. and had some tomato & beef soup (yeurgh). Hastened
|
|
slowly out. Emerged at about two in the morning. Andy got really pissed off
|
|
as his Petzl Stinky needed twice as much carbide as mine despite having a 14
|
|
litre jet anstatt the usual 21. 11 hrs.
|
|
<br>The furry suit is starting to niff a bit after only two trips.
|
|
|
|
<p align=right>Dave
|
|
|
|
<p align=right>11 hrs
|
|
|
|
<p><a href="#id1982-115-5">Next trip</a>/
|
|
<a href="#id1982-115-3">Previous trip</a>
|
|
<hr /><a id="id1982-115-5">29th Thursday</a> 115 Pete +
|
|
Phil
|
|
|
|
<p>The first big trip - jeez were we knackered ! Full of beans, literally,
|
|
Pete made a jet assisted walk in. Surprisingly efficient trip in with tackle
|
|
bags. The Ramp is different but no easier. Some entertaining rigging on the
|
|
Inlet Pitches. And then Purgatory, what can one say, it goes on and on and
|
|
on. We rigged the Pre-sump Pitch, then the Post-sump Bypass Pitch. On into
|
|
the stream, considering the quantity of rain there was pleasingly low water.
|
|
We rigged the first three streamway pitches, 7m slopping + damp, 5m, new bolt
|
|
to make the next 40m pitch drier. Carried on down a rather wet climb with
|
|
grotty memories of last year, we decided it needed a rope and that we'd turn
|
|
around before we got cold. Going back Purgatory was longer and destroyed a
|
|
tackle bag and a boiler suit. Soup in the main chamber provided just enough
|
|
body heat to combat the chill acquired waiting to brew it ! From then a
|
|
sleepy exit was made, both of us nodding off at strategic points on the
|
|
entrance pitches, and on the Stogerweg on the way back.
|
|
|
|
<p align=right>Time 14 hrs.
|
|
|
|
<p><a href="#id1982-115-6">Next trip</a>/
|
|
<a href="#id1982-115-4">Previous trip</a>
|
|
<hr />29th Thursday. Sonnenstrahlhöhle
|
|
1623/113 Andy & Mike
|
|
|
|
<p>The usual early start got us underground by ~1pm with only mild wittering
|
|
on the entrance rebelay. Things went rather more smoothly than on Tuesday,
|
|
rerigging Point Five Gully with a 36m rope, thus freeing the 53m rope for
|
|
Sprucy Wind. Further success on the 14m pitch led us on to the Opera House
|
|
where Mike found a missing bolt. Purple Pit was as magnificent as ever (Mike
|
|
didn't appreciate the Bowers rebelay). Muesli Crawl was located and Sprucy
|
|
Wind rigged... The squeeze at the pitch head gave Andy some trouble but the
|
|
main trouble was the Union of Bullshitting Spastic Speleologists rope
|
|
protector of which more later... Pitches rigged with minimal slack (one with
|
|
tension between the bolts, much to Mike's chagrin - but the rope only just
|
|
reached the next rebelay anyway). At least one bolt on the next section
|
|
wasn't located, leaving a ~35m section with a couple of rubs :- must fix this
|
|
next time. Needless to say - the rope was too short on the wet part and Andy
|
|
had a brief spell of pitch rigging by braille and ended with a knot to pass
|
|
at the final ledge. Then.... the bottom.
|
|
|
|
<p>The chamber at the pitch bottom quickly became littered with bolts,
|
|
hangers and solid rubber trussing gear as yopur intrepid speleos prepared to
|
|
face ... THE SQUEEZE. Urgh ! Gnnuk ! Pop ! Into the Crematorium and the near
|
|
silence of a dry chamber. Tripping over drystone walls as they went, the
|
|
heroes, now over a thousand feet below the black hell of Schwarzmooskogel in
|
|
the remote Austrian Alps .. What ? Oh, sorry - facts only. We looked briefly
|
|
at some climbs and then shinned down into the narrow rift found by Tony's
|
|
carbide lamp in 1980. More thrutching noises, grunts, groans and sundry
|
|
curses accompanied desperate slow, woofta-ripping progress along a crawling
|
|
rift over a four inch stream slot among muddy, sharp crumbly rock. This led
|
|
for ages down tiny hading climbs to a micro-stream. More awkward climbs with
|
|
lobbing lumps of rock dropped to Andy's limit of 1980 - the promising ongoing
|
|
passage was huge ! after removing stones it was almost 4" (10cm) wide with a
|
|
half-body-sized cavity beyond. We extended it about 2ft (60cm) horizontally
|
|
and even less depth. SO much for top entrances to Stellerweg ! Turning round
|
|
and getting out took less than an hour or so, only slightly shredded. I don't
|
|
think Mike really appreciated being taken down here at all.
|
|
|
|
<p>So ... OUT ! Re-assuringly steady progress up the pitches interrupted only
|
|
by the crappy UBSS protector falling down the rope and landing on Andy. Don't
|
|
they have croc clips in Bristol ? Sardines at Muesli Crawl galvanised the
|
|
team to upward progress at almost exactly the same speed as before, slowing
|
|
as the boulders became oppressive at the Opera House. Not far to go now chaps
|
|
! Just the thrutchy boulder and the loose scree and the glassy ice slope and
|
|
the endless upward slogging entrance pitch and the bolt and the blasted
|
|
bouncy bunde blocking bludering blacked-out bleary-eyed (insert a plural word
|
|
meaning cavers but beginning with 'B'), from their rightful place on the
|
|
outside skin of the sphere we laughingly call the earth, or something. End
|
|
Delirium.
|
|
|
|
<p>We walked back in the dark and missed the pub.
|
|
|
|
<p align=right>8½ hours
|
|
|
|
<hr /><a id="id1982-115-6">30th Friday</a>
|
|
Schnellzughöhle 115
|
|
|
|
<p align=right>Andy D + Chas
|
|
|
|
<p>A leisurely start saw us underground by 3 O'Clock. The memory has faded by now but we rigged the last three year's pitches. The next is a pleasant 10m pitch and shortly afterwards a slightly bigger pitch we didn't go down. At the time we thought it might be a climb but it definitely isn't.
|
|
|
|
<p>We took some food and a stove down to the sump bypass and had a brew of disgusting soup in the Big Chamber on the way out.
|
|
|
|
<p>Oh and we put backup bolts on some of the other streamway pitches. Out at 5.20 in the dawn light. Andy kept falling asleep on the walk back.
|
|
|
|
<p align=right>14 hrs
|
|
|
|
<p><a href="#id1982-115-7">Next trip</a>/
|
|
<a href="#id1982-115-5">Previous trip</a>
|
|
<hr /><i>There is a very large blank space in the logbook suggesting an omitted
|
|
write-up that no-one ever got round to.</i>
|
|
|
|
<hr />Saturday 31st July
|
|
|
|
<p>Well, Dave and Ian were going to explore the phreatic maze at the bottom
|
|
of 41 .... but we'd been outdrinking the local cavers in Bad Mitterndorf last
|
|
night and the first expedition Huey & Ralph by Dave meant that he jacked
|
|
at the carpark.
|
|
|
|
<hr />Sunday 1st August
|
|
|
|
<p><a id="id1982-115-7">41 Phreatic</a> Ian & Dave
|
|
|
|
<p>Alpine style starts at 0600 hours just don't work for C.U.C.C. so a
|
|
leisurely start meant we felt vaguely human as we descended the usual boring
|
|
entrance. Excitement at the wet pitches with a roar of water (it had been
|
|
raining). We descended hurtling down through the spray footing it from wall
|
|
to wall to avoid the worst. Vague doubts about the return are dispelled as we
|
|
soar down into the Big Chamber. Food was dumped (fromk the tacklebag) and we
|
|
scrambled into the connection. Damn we're lost. Back and forth, eventually we
|
|
are on a ledge in 41 but 10m above the floor ! Shit ! BAck again and at last
|
|
we've done it. On into the Dartford Tunnel - this is huge but better things
|
|
are to come. Turning left to last year's terminus. Excitelment increases - we
|
|
are in virgin passage - no, still old footprints in the sand ahead. Suddenly
|
|
an inscription "cucc/UBSS 81" in the mud and ahead a sloping traverse. This
|
|
was quickly overcome and ahead a stomping passage leads to - what ? A small
|
|
climb is overcome and we cross a deep rift with a roar of water but ahead the
|
|
phreatic tube continues. We're almost running now, pinting out features, not
|
|
listening, the tension is incredible, a feeling of "how long will it last?"
|
|
Suddenly a junction with a dry Purgatory in the floor and a dead bat. Hardly
|
|
pausing we push up Rampant Passage, slower now, panting with exertion and
|
|
excitement, this tube rises a hundred feet in two hundred feet of length. At
|
|
the top we suddenly emerge into Cologne Cathedral, a silent but huge chamber.
|
|
A dangerous climb leads to 30m Echo Aven. We return and push down the rift.
|
|
Ahead the roar of water and suddenly we're hanging out over over an enormous
|
|
streamway, water cascades down out of sight. We can't go on so we survey
|
|
grade 2 out in what we've found. A magnificent trip and the sunset on the
|
|
Trisselwand as we emerged was quite superb. This was continental caving as
|
|
I'd really imagined it.
|
|
|
|
<p align=right>10 hrs
|
|
|
|
<p align=right>Dave
|
|
|
|
<p><a href="#id1982-115-8">Tourist trip same day</a>/
|
|
<a href="#id1982-115-9">Surveying trip next day</a>/
|
|
<a href="#id1982-115-10">Next pushing trip</a>/
|
|
<a href="#id1982-115-6">Previous trip</a>
|
|
<hr /><a id="id1982-142-1">Saturday 31st
|
|
July</a> - Prospecting south of 41 on east side of
|
|
Schwarzmooskogel.
|
|
|
|
<p>Pete, Mike, Phil.
|
|
|
|
<p>With three of us strung across the 'bunde' we covered quite a lot of
|
|
ground, and yet this amounted to probably only 10% of the area we crossed.
|
|
And caves do appear in the middle of nowhere. The major joint trends are easy
|
|
to follow but largely unproductive being full of small non-draughting shafts.
|
|
Valleys are much more promising and consequently full of bunde. Two decent
|
|
prospects were found.
|
|
|
|
<dl>
|
|
<dt>131<dd>A large classical cave entrance strewn with boulders in a
|
|
prominent valley. Back bearings to Trisselberg 170°, Bergrestaurant
|
|
240°. Probably about 1720m. Best reached from the cairned path along the
|
|
ridge top, which leaves Stogerweg at cave 28.
|
|
|
|
<dt>132<dd>Small hole immediately below an ice + stone plugged shaft. Very
|
|
good draught out. About 250m south of 41 at approx same height. No bearings.
|
|
Best reached from the Stogerweg 200m before 32, climb beneath a small cliff,
|
|
then up diagonally through bunde to large grassy + rocky slope. Climb to top
|
|
right of this slope to find the ice plugged shaft.
|
|
|
|
</dl>
|
|
|
|
<p><a href="#id1982-142-2">Next trip</a>
|
|
<hr /><a id="id1982-142-2">Sunday 1st August</a> Prospecting -
|
|
131, 132
|
|
|
|
<p>Phil + Mike
|
|
|
|
<p>We had intended to go down the streamway in 115, but all the rain the day
|
|
before and the swollen becks on the surface at the Bergrestaurant caused us
|
|
to make a nearly sensible decision. Unfortunately the restaurant was closed
|
|
and we didn't have the face to go straight back so we tramped to 115, thought
|
|
some more, and decided to go back to yesterday's finds. The bunde was piss
|
|
wet, so were we, maybe slightly in the head too.
|
|
|
|
<p>First to 132, clad in T-shirts + Wetsuit top + jeans, Phil dropped in,
|
|
squirmy entrance, dug through some stones into a low phreatic tunnel, no
|
|
draught. Mike tracked the draught, dug out some boulders and revealed masses
|
|
of phreatic passage, hading ramps and possible big pitches. This is almost
|
|
certainly another entrance into the top of Stellerweg hohle. There are also a
|
|
number of ramps upwards, two of which were traced to earthworm size wet holes
|
|
alluringly near to the surface. There must be potential for a higher entrance
|
|
to the system. Worth going back to but we're keeping the location secret
|
|
until 115 is surveyed. The exploration was halted by a shortage of light and
|
|
sore knees.
|
|
|
|
<p>131. Just a quick look, another steep ramp, but no horizontal development
|
|
in the top 30m. Holes in the ramp of tight vadose stream character, with a
|
|
drop estimated at 80m.
|
|
|
|
<p align=right>Time ~3 hrs
|
|
|
|
<p><a href="#id1982-142-3">Next 142 trip</a>/
|
|
<a href="#id1982-142-1">Previous trip</a>
|
|
<hr /><a id="id1982-115-8">Sunday 1st August</a> Gear + Limb
|
|
testing trip down 115
|
|
|
|
<p>Tim and Philip S
|
|
|
|
<p>Phil's first trip down any continental cave - and on his 28th (<--
|
|
<font size=-2>I don't believe it!</font>) birthday too. Originally we were
|
|
only going down to test out Tim's SRT gear, wetsuit, enduro suit etc. that
|
|
had been sitting in 4 City Rd for months. When we were down it seemed a shame
|
|
not to go on so we continued down to the top of the wettish pitches before
|
|
the big chamber.
|
|
|
|
<p>Fine training trip, 5 hours
|
|
|
|
<p><a href="#id1982-115-7">Pushing trip same day</a>/
|
|
<a href="#id1982-115-9">Surveying trip next day</a>/
|
|
<a href="#id1982-115-10">Next pushing trip</a>
|
|
<hr /><a id="id1982-115-9">Monday 2nd August</a> 115
|
|
surveying Phil S & Chas
|
|
|
|
<br>Surveying round the Big Chamber & placed a fixed station. V. slow 7
|
|
hrs saw a pine marten on the way back not in the cave, fool. ~ 7 hrs
|
|
|
|
<hr /><a id="id1982-115-10">Monday 2nd August</a> 115 Pushing
|
|
|
|
<p>Mike + Phil
|
|
|
|
<p>Got down to Main Chamber in 1½ hrs for Dig Bicks, then to sump in
|
|
1½ hrs, then added a short rope to the stream "Yet another pitch"
|
|
before continuing. Rebelayed the Letch Pitch to make it slightly less damp
|
|
though with a bit more enterprise and penduling through the waterfall a
|
|
comfortable rebelay may have been managed farther round to the right; but it
|
|
was too cold for acrobatics. Below 'the Slit', Andy + CHas' last pitch, the
|
|
stream meandered on to a fairly grotty looking pitch 'Coming Soon' which we
|
|
rigged and then jacked through coldness and the ever pesent paranoia that the
|
|
damned stream is out to get us. Met Tim + Pete at foot of Letch pitch and
|
|
left them with the glory hunt and tales of gathering clouds on the surface.
|
|
Not too hard on exit, it just takes so long, and Mike had a lot of trouble
|
|
with his genitalia; endeavouring to return them to a state of prepubescence
|
|
by the application of a non too comfortable prussik truss.
|
|
|
|
<p>As last year the trips are getting heroically long to place a couple of
|
|
bolts, and hydrophobia is rife. We definitely need some sustained fair
|
|
weather, or else we'll all be reduced to surveying trips.
|
|
|
|
<p align=right>Time 15 hrs
|
|
|
|
<p>
|
|
<a href="#id1982-115-11">Next pushing trip</a> (following on same day) /
|
|
<a href="#id1982-115-7">Previous pushing trip</a>
|
|
<hr /><a id="id1982-115-11">Monday 2nd August</a> 115 Pushing
|
|
|
|
<p>Tim + Pete
|
|
|
|
<p>Team gastronomique went down with the express intention of blitzing the
|
|
food dumps; if the cave went a little bit further than last time then it was
|
|
purely by accident.
|
|
|
|
<p>Got quickly to main chamber + made do with a couple of Mars Bars. Blatted
|
|
on down Purgatory + met Phil + Mike at Letch pitch on their way out. Brief
|
|
pause to unload unruly bowels. Continued to Slit pitch where some rather
|
|
desperate rope damage was skilfully concealed with a rope protector. Next
|
|
pitch was Phil + Mike's undescended 8m pitch which landed in a pleasant,
|
|
gently sloping canal. Sauntered on down, passage looking more + more
|
|
sump-like every step. Rounded corner to see sump. Sighs of relief could be
|
|
heard all the way back to the main entrance. Unfortunately.... youthful
|
|
over-enthusiasm on the part of Plank caused him to plunge into a rather deep
|
|
dank pool + find a duck with a few inches of air space out under one wall.
|
|
Trying not to think of upstream bowel movements + ignoring little brown
|
|
submarines in the pool, our intrepid team swam through more cnal (the final
|
|
sump can't be far now can it ?) leading to yet another pitch - Orgasm Chasm.
|
|
Rigged ~ 40 ft to a ledge then 40ft to another ledge. Still couldn't see the
|
|
bottom. Pretty spray-lashed chamber - very impressive. Came out. Stopped for
|
|
a brew at sump bypass food dump. Stopped for another at main chamber. Came
|
|
out pretty slowly. May have had less to do with fatigue than with the weight
|
|
of Dig Biccies being carried in tummies.
|
|
|
|
<p align=right>time 16 hrs.
|
|
|
|
<p><a href="#id1982-115-13">Next pushing trip</a>/
|
|
<a href="#id1982-115-12">Next trip</a> (surveying)/
|
|
<a href="#id1982-115-10">Previous trip</a>
|
|
<hr />Tuesday 3rd August No trips, at least not speleological (!)
|
|
<p align=right>. . . . . way out man . . . . .
|
|
|
|
<hr />Wednesday 4 August
|
|
|
|
<p>Phil S & Janet abortive trip to begin survey of the Purgatory.
|
|
Sensible decision taken at 115 entrance in face of nausea (& headache).
|
|
Retrat.
|
|
|
|
<hr /><a id="id1982-142-3">Weds 4th Aug</a>
|
|
|
|
<p>Doug, Mike
|
|
|
|
<p>Exploration of 132. Found a big chamber and a big pitch. Thrutched around
|
|
various crawls and lost each other. Sat around waiting for each other for 2
|
|
hrs and then went to call out rescue for each other. Fortunately met near
|
|
entrance. Almost a nasty fiasco.
|
|
|
|
<p align=right>Doug. ~ 4 hrs
|
|
|
|
<p><a href="#id1982-142-4">Next trip</a>/
|
|
<a href="#id1982-142-2">Previous trip</a>
|
|
<hr /><a id="id1982-115-12">THURSDAY 5 AUGUST</a>
|
|
|
|
<p>Phil S. & Janet
|
|
|
|
<p>Second attempt to survey Purgatory. Dave & Chas followed us down -
|
|
about 1 hr 20 mins to Main Chamber. An hour later we were still there trying
|
|
to get the clino to be visible - all fogged up. Janet put it in a pocket
|
|
whilst we chatted to Phil & Pete - then took itn out to discover it was
|
|
perfectly clear. Surveyed 9 stations down Purgatory when it fogged up again.
|
|
Philip tried everything - breathing on it, sucking it, licking it - sticking
|
|
it in armpits etc. whilst Janet painted a mark. Got it visible again and
|
|
surveyed - with several clino problem breaks - until station 24 when it
|
|
became completely unmanageable. Painted mark & came out - sane but cold.
|
|
A quick dash around phreatic passage to Pebble Beach Chamber and the drafty
|
|
hole to warm up + back to main chamber for sardines (later regretted). Out in
|
|
3 hrs 10 minutes - forgetting the notebook in the Main Chamber. The Purgatory
|
|
has ways of preserving its secrets...
|
|
|
|
<p><a href="#id1982-115-13">Next pushing trip</a> (same day)/
|
|
<a href="#id1982-115-16">Next surveying trip</a>/
|
|
<a href="#id1982-115-11">Previous trip</a>
|
|
<hr /><a id="id1982-115-13">Thursday 5th August</a> 115
|
|
Pushing
|
|
|
|
<p>Chas & Dave
|
|
|
|
<p align=right>My old man said "Follow the van..." geddit ? Gertcha !
|
|
|
|
<p>Well . . . . what can I say ? Preparing for a long trip, Dave put on long
|
|
johns, wetsuit, furry suit, pullover, cagoule and overalls. Unfortunately he
|
|
could barely move and had to take off a layer or two at the Ramp. Down the
|
|
Purgatory was as nasty as ever. Then, past the Confluence and "Yeeeeeeeah !"
|
|
I've never been as near having an orgasm underground as when I saw the smoked
|
|
"CUCC 82" in the roof. Suitably encouraged by the easy way out, we pressed
|
|
on. A pleasant series of pitches lead to the Duck. Yeurgh !! Chas did well to
|
|
survive in just a furry suit. Then - Orgasm Chasm. Jeez what a shaft ! We put
|
|
in two bolts and a large freehang 150+ dropped to (no not a floor) a ledge.
|
|
Another bolt but rope too short. Still no floor. Back (bounce) up (bounce)
|
|
the Interalp (bounce) which stopped bouncing when it caught and I was
|
|
prussiking up an iron bar ! Shit. We've now been under 9 hours so exit. Large
|
|
gonk at sump bypass. At confluence we gratefully climbed up into the phreas.
|
|
The way to 115 is about half a mile of walking and traversing. Towards the
|
|
end we were stopping every 50m for a rest. In the Big Chamber, we had a
|
|
really bad gonk for 25 minutes or so - I began to wonder if we'd make it.
|
|
Once the prussiking had started it wasn't so bad but it was slow hard
|
|
progress all the way. The Bell Pitch alone took 15 minutes. Then the crawl
|
|
out to a painful dawn. In silence we changed and walked back to the
|
|
Loserhütte. The sight of Mike asleep in his car was very welcome indeed.
|
|
At long last we could relax, after sixteen and a half hours unbroken struggle
|
|
with this fierce cave.
|
|
|
|
<p align=right>16½ hours
|
|
|
|
<p><a href="#id1982-115-15">Next streamway pushing trip</a>/
|
|
<a href="#id1982-115-14">Bypass pushing trip</a> (same day)/
|
|
<a href="#id1982-115-7">Trip which left the "CUCC 82"</a>/
|
|
<a href="#id1982-115-11">Previous streamway pushing trip</a>
|
|
<hr /><a id="id1982-142-4">Thursday 5th August</a> Exploring
|
|
132
|
|
|
|
<p align=right>Tim, Andy D & Mike
|
|
|
|
<p>Went to Big Chamber to descend pitch with 66m rope, water for Andy's stink
|
|
found next to rescue Mars Bar. Descended big pitch via ledge 4m down, after
|
|
much wittering ~35m pitch into huge chamber filled with v. loose boulders,
|
|
ways on opposite pitch via loose squeeze, not pushed. Ways down under loose
|
|
boulders in floor probably choked.
|
|
|
|
<p align=right>5 hrs
|
|
|
|
<p><a href="#id1982-142-5">Next trip</a> (derigging)/
|
|
<a href="#id1982-142-3">Previous trip</a>
|
|
<hr /><a id="id1982-115-14">Thursday 5th August</a>
|
|
|
|
<br>115 Dry Bits
|
|
|
|
<br>Phil, Pete.
|
|
|
|
<p align=right>11 hrs
|
|
|
|
<p>Aim: to push the streamway found by Ian + Dave
|
|
beyond the railway tunnel in Stellerweg.
|
|
|
|
<p>Met Janet + Phil in Big Chamber, then through the connection; route
|
|
finding being moderately easy - following footprints. Heard Janet + Phil
|
|
surveying in Purgatory when we were at connection cairn. In Junction Chamber
|
|
we shot up the big passage and missed the turning left to the railway tunnel.
|
|
We eventually got to the point where traversing became nasty + realized our
|
|
mistake; but it should be possible to go much further up here. Down the
|
|
railway tunnel with various climbs up & down and a jump across the top of
|
|
the stream canyon; we reached a corner where the traverse ran out; so
|
|
freeclimbed down ~5m to the stream below, we were amazed to find arrows
|
|
pointing upwards, smoked onto the wall and then a pitch, nicely rigged: we
|
|
were in the 115 streamway, we trogged down to the sump just to make sure. We
|
|
had dropped down at the Confluence. We went back up the "Stellerweg Inlet",
|
|
which starts off larger than Purgatory, but soon breaks down into inlets; we
|
|
freeclimbed ~7m pitch, but eventually gave up when it was getting tight.
|
|
There didn't seem any easy way of getting up into the dry stuff, so we went
|
|
back to the Confluence and climbed up there. Rigged a traverse with a rope
|
|
(before this we managed to avoid the jump across the stream by following a
|
|
parallel ramp on the left). We had a prod around in many of the passages, but
|
|
they all seem to close down as inlets; so there doesn't seem much prospect
|
|
for any great extension. Coming back found a phreatic tube/crawl which
|
|
bypassed the cairn + a small passage with some <u>straws</u> ! Dropped back
|
|
into the Purgatory to avoid the traverse near 115.
|
|
|
|
<p>Fine walk back - views of the Dachstein by moonlight ! Pete.
|
|
|
|
<p><a href="#id1982-115-13">Streamway pushing trip</a> which left the arrows (same day)/
|
|
<a href="#id1982-115-12">Surveying trip</a> (same day)/
|
|
<a href="#id1982-115-15">Next pushing trip</a> (camp)/
|
|
<a href="#id1982-115-11">Previous Bypass pushing trip</a>
|
|
<hr />Thursday 5th August SONNENSTRAHLHÖHLE survey +
|
|
frontier push.
|
|
|
|
<p>The trip that took four days to start ! Doug & Andy had even got
|
|
changed outside the entrance for one attempt before jacking. Finally
|
|
underground at 12.30 on Thursday ... now read on ...
|
|
|
|
<p>Zapped down to Opera House then started survey from station 1980/S27 at
|
|
the thread. Keine promble down Purple Pit confirming previous "survey" to
|
|
1980/SA0 at the last bolt. Zoomed through muesli crawl to Sprucy Wind where
|
|
Andy relieved the tension in the rebelay (not without hassle). Then zipped
|
|
down the rope to the bottom. Thrutched into the Crematorium where Andy
|
|
started and Doug finished a bolt to protect a daring climb onto the loose
|
|
muddy sloping ledge. Doug did the daring deed of deadly dangerous desperate
|
|
daring (Bzzzzz! "repetition"). Onto the ledge and along past a thread
|
|
(runner) and onto the base of the ramp. Needless to say, but I'll say it
|
|
anyway, this didn't go. Doug reached the base of an unscalable 15m aven and
|
|
the hoped for streamway bypass was unfound. Retreat, unable to evade the
|
|
concept which strikes dread into every caver's heart. . .
|
|
|
|
<p>DERIGGING (Aaagh ! No ! Faint ! Throw up !)
|
|
|
|
<p>Derigged the whole of Sprucy Wind and the last bit of Purple Pit. Exitted
|
|
(very slowly with more cursing / unit depth than previously seen this year)
|
|
with 150m rope + hangers & Co. & Co. Out @ midnight to v. nice moon.
|
|
|
|
<p>11½ hours (gasp!). A.
|
|
|
|
<hr /><u>Friday 6th August</u> <u>Dachstein walking trip</u>
|
|
|
|
<p>Doug, Andy W, Andy D, Chas
|
|
|
|
<p>Quite a drive to Ramsau am Dachstein, aided by a [?] of beer and snacks.
|
|
Once there we looked at the walk up, looked at the Seilbahn tariff, looked at
|
|
the walk again and decided that 150 S would be well spent on a return ticket.
|
|
The ride is very steep and goes up 1000m in a single span. The path looks
|
|
appalling from the Seilbahn - very exposed & scree-covered. Besides it's
|
|
better to save your energy for when you get to the top.
|
|
|
|
<p>Most of the glacier is flat, mushy snow without crevasses. We took a walk
|
|
up the Hoher Gjaidstein 2,7 hundred and something. Fine view of the
|
|
Trisselwand and of Hoher Dachstein from the top. It looks quite easy to get
|
|
up Hoher Dachstein so this must be done next time.
|
|
|
|
<p>Doug and Andy W went to play on the bergschrund & Andy D and Chas
|
|
found a snowslope to learn braking and glissading on. Standing glissade is
|
|
really fun. We rushed back, missed a bahn by one minute and had to wait for
|
|
the last one down - by this time the weather had really come down and the
|
|
lightning was flashing. We met a real alpinist and his son, draped round with
|
|
sitharnesses, chest harnesses, pegs, nuts, etriers, crampons, enormous coils
|
|
of rope, u.s.w., u.s.w. A very good day out.
|
|
|
|
<p align=right>Chas.
|
|
|
|
<p>P.S. the altitude (or something) made us fart like drains. We think
|
|
methane comes out of solution at low pressures.
|
|
|
|
<hr />Friday 6th August
|
|
|
|
<p>No caving was done. Went to the fireworks at Hallstatt and spent the day
|
|
searching Bad Aussee for gas.
|
|
|
|
<br><font size=-1><i>Why walk further than Waddington's tent ?</i></font>
|
|
|
|
<hr />Saturday 7th August
|
|
|
|
<p>Tim and Phil nearly went underground, but fitness doubts in training and
|
|
intense precipitation caused a sensible decision to be made. Instead, tackle
|
|
for a camp was assembled and carried up to 115.
|
|
|
|
<p>Did anyone cave ? No. I think not. The three day cycle strikes with a
|
|
vengeance: it certainly can't be the sunshine that keeps us above ground.
|
|
|
|
<p>Somebody write in this space. So as I can have a clean page for the next
|
|
write up.
|
|
|
|
<p>[ someone has obligingly written "Balls" diagonally in large letters to
|
|
fill the space, Ed. ]
|
|
|
|
<hr /><a id="id1982-115-15">Sunday/Monday</a> 8/9th
|
|
August 115
|
|
|
|
<p>Tim + Phil
|
|
|
|
<p>We went in with Paddy and Dave as Sherpas to ferry four tackle bags and a
|
|
50m rope to the phreas above the Stellerweg - Purgatory confluence. A camp
|
|
was established on a moderately flat sandy patch in a side passage with very
|
|
little draught. Shitting facilities, upwind, in an abandoned vadose groove.
|
|
Water at the Confluence, a ten minute round trip.
|
|
|
|
<p>After Rams Bras + Dig Bix we went on a pushing trip. Rerigged ORgasm
|
|
Chasm, same bolts so enterprisingly installed by Chas + Dave, different rope.
|
|
Both had lots of fun shuffling ropes and knots and rebelays suspended 200' up
|
|
the gaping hole. The big pitch ~150', is really great to descend but a nerve
|
|
wracking slog up, listening for twangs and rubs. Orgasm Chasm finally rigged
|
|
with a 3m descending traverse line, two ~12m pitches, a 7m, 45mm, round a
|
|
col, 15m. At the floor of the Chasm, the water runs down a rift in one
|
|
corner, followed round to a black slit hole. On the opposite side of the
|
|
Chasm to the final rope, an archway leads into a semi-abandoned passage, with
|
|
a 6m pitch and then the same black slit as above. Put a bolt on this but
|
|
didn't descend, sounds about 100' deep - could this be the end ? Don't miss
|
|
next week's exiting episode. The return trip was dogged by light problems.
|
|
Four boxes of wet matches, two dud cigarette lighters, a self destructing
|
|
leaky ammo can led to several anxious moments. Good advert for Timex watches,
|
|
still running after a 60' drop and two hours immersed in water - not so Casio
|
|
watches.
|
|
|
|
<p>Back to camp at 2am, dry clothes, warm pits, soup, spag bol, egg noodles,
|
|
dig bix, cigarettes and a comfortable kip till midday. Nice not to be woken
|
|
by the sun, or to know that it had pissed with rain all night. Just as above
|
|
ground the worst part of camping is getting out of a warm pit into the cold
|
|
air and then into cold damp caving gear. A grade IV Yorkshire change.
|
|
|
|
<p>On our way back to the surface we were rather pissed off not to meet the
|
|
next wave of campers, bar amp followers. A little trickle of rain had
|
|
frightened them away, they sat in BAr fischer and auctioned off our cassette
|
|
tapes, hash, etc. Good to have friends. Exit from camp only took 3½
|
|
hours, including further extensive stops to get carbides going, Phil having
|
|
prussiked up his own prussik sling in the dark ! Emerged to daylight, Mike
|
|
and Andy to meet us, veg curry, beer and the munchies.
|
|
|
|
<p>CUCC first underground camp.
|
|
<br>Deepest CUCC trip ? But how deep.
|
|
<br>Time underground 31 hrs.
|
|
|
|
<p><a href="#id1982-115-17">Next (abortive) pushing trip</a> (camp) /
|
|
<a href="#id1982-115-16">Surveying trip</a> (same day)/
|
|
<a href="#id1982-115-19">Next useful pushing trip</a> (camp) /
|
|
<a href="#id1982-115-13">Previous pushing trip</a>
|
|
<hr /><a id="id1982-115-16">Schnellzughöhle</a> : The Survey
|
|
?! Pete and Andy
|
|
|
|
<p>A 'gentle' introduction to the system for Andy - whose light was in his
|
|
car (oops). Down on Chas's light (Thanks Chas) but with no water - at first.
|
|
Pete and Andy soon had hands cold enough to grab water and make ice cubes,
|
|
but we refrained and carried on surveying and surveying and surveying and
|
|
surveying and surveying and
|
|
s u r v e y i n g
|
|
a n d
|
|
s u r v e y a w n. Met Paddy
|
|
and Dave coming the other way in their sherpa trip, so added them to the
|
|
survey party leaving Andy to sketch only. This didn't help as his light ran
|
|
out of water. Anyway, we stopped at the top of the Ramp. Relief for Andy also
|
|
meant light for Andy, but a nasty burnt urea smell for all concerned.
|
|
Thrashed out - 6 hrs ? What is this ? A short trip ?!! Unheard of !.
|
|
|
|
<p align=right>A.
|
|
|
|
<p>P.S. The survey, while short, may be the best bit !
|
|
|
|
<p>[Webeditor: the results of this particular survey trip may be seen on the
|
|
site in <a href="../../1623/41/115p.png">plan (33k gif, 800x1080)</a> or <a href="../../1623/41/115x.png">extended section (23k gif, 1090x700)</a>]
|
|
|
|
<p><a href="#id1982-115-18">Next surveying trip</a> /
|
|
<a href="#id1982-115-15">Pushing trip</a> (same day - camp) /
|
|
<a href="#id1982-115-12">Previous surveying trip</a>
|
|
<hr /><a id="id1982-115-17">Tuesday / Wednesday 10/11
|
|
August</a> 115 Pushing ? + Camping
|
|
|
|
<p>Mike and Andy
|
|
|
|
<p>It rained all night on Monday night but we still went down even though it
|
|
looked a bit wet. Got u/g at ~12 to be greeted almost immediately by the
|
|
sound of rushing water in places which are normally dry. Took a long time to
|
|
get to big chamber owing to failure of Mikes big stinky. Found way through
|
|
Purgatory Bypass surprisingly easily only went wrong way twice. The water at
|
|
the Confluence looked rather high but we decided to push on down. Got as far
|
|
as the 2nd pitch in Orgasm Chasm which we found <u>FULL</u> of water. Andy
|
|
tested it with his foot and retreated. We reluctantly jacked and had an
|
|
uneventful trip out apart from meeting Pete + Andy W in streamway (and being
|
|
later woken up by them) Our only achievement on this trip was removing some
|
|
rubbish from the camp.
|
|
|
|
<p align=right>~ 28 hours
|
|
|
|
<p><a href="#id1982-115-19">Next streamway pushing trip</a> (the bottom) /
|
|
<a href="#id1982-115-18">Surveying trip</a> (same day) /
|
|
<a href="#id1982-115-15">Previous streamway pushing trip</a>
|
|
<hr /><a id="id1982-115-18">Tuesday / Wednesday 10/11
|
|
August</a> 115
|
|
|
|
<p>Pete + Andy W
|
|
|
|
<p>Went down the streamway thought it rather wet but pressed on and surveyed
|
|
from the 12 foot climb downstream. Met Andy + Mike who'd jacked because of
|
|
water. Got to the head of the Marlow climb where we decided to turn back
|
|
because of extreme cold, worries about the water, single bolt rigging, etc.
|
|
So we surveyed the dry bit from Confluence almost to the Big Chamber,
|
|
stopping at the camp for a meal. Out not too rapidly.
|
|
|
|
<p align=right>Pete
|
|
|
|
<p align=right>21 hours
|
|
|
|
<p><a href="#id1982-115-20">Next surveying trip</a> /
|
|
<a href="#id1982-115-17">Pushing trip</a> (same day - camp, abortive) /
|
|
<a href="#id1982-115-16">Previous surveying trip</a>
|
|
<hr /><a id="id1982-115-19">Wednesday / Thursday 11/12
|
|
August</a> 115
|
|
|
|
<p>Chas and Dave
|
|
<p align=right>The Sump<!-- replace this with a scanned graphic ? -->
|
|
|
|
<br><font size=-1>Rabbit Rabbit Rabbit !</font>
|
|
|
|
<p>As we entered, sun was beating down & promised to hold. This was the
|
|
last pushing trip cos time was out - derigging would have to start tomorrow.
|
|
We met Mike & Dobbers at inlet pitches and learnt to our dismay that they
|
|
had been foiled by water in Orgasm Chasm. This meant that photo gear had to
|
|
be abandoned at the camp for an all out push. As we entered the streamway the
|
|
water seemed higher than usual. We pushed quickly on - I was thinking of the
|
|
wet pitch found by Tim & Phil but knew we'd go on until bolts or rope ran
|
|
out regardless of time. Duck was not too bad and onto Orgasm Chasm. On the
|
|
big drop were two ropes - Chas went down the one with no knot on the end but
|
|
spotted it in time (phew). The pitches became wetter and then the 100'. I
|
|
vegetated while Chas placed one wet freehanging bolt then down into a cold
|
|
spray lashed chamber. We rushed into a corner to fettle. Poking among
|
|
enormous boulders we dropped into the stream again, through a canal and to a
|
|
20' pitch. No, it was a free climb and suddenly a sump. Just a rift with a
|
|
very deep scummy pool. No great thrill, no cheers or handshakes, we traversed
|
|
over to check for a bypass, but I think we knew this was it and we were
|
|
getting cold so a slow return to camp was made. A good meal and a King Edward
|
|
Cigar to celebrate, and a good nights sleep meant a speedy exit the next day.
|
|
It's very hard to get out of bed when it's dark even at 1pm. We hitched back
|
|
to camp and revealed all - I think they were all very pleased though cavers
|
|
aren't prone to outbursts of emotion.
|
|
|
|
<p align=right>29½ hours
|
|
|
|
<p><a href="#id1982-115-20">Next trip to bottom</a> /
|
|
<a href="#id1982-115-17">Previous (abortive) pushing trip</a>
|
|
<a href="#id1982-115-15">Previous pushing trip</a>
|
|
<hr />Friday 13th August 113
|
|
|
|
<p>Tim + Phil
|
|
|
|
<p>Just for a change of cave we derigged 113 from Purple Pit to the entrance.
|
|
Apart from one trip down Lost Johns and a couple down 132, 115 is the only
|
|
cave both of us had been in in the last twelve months. Sonnenstrahlhohle is a
|
|
fine pot, great shame its not the entrance to 115. Positively speleoorgasmic
|
|
entrance. Some pretty hair raising bolts though, even if they are well
|
|
positioned. In and out in 3½ hours. Then we had to walk back avec
|
|
beaucoup de tackle; there are far more pleasurable ways of putting your back
|
|
out than carrying 120m of rope and a rucksack full of caving gear; but such
|
|
means are not so readily available. Malesh !
|
|
|
|
<hr />Friday 13th August Dachstein walking trip
|
|
|
|
<p align=right>Andy W, Dave, Mike, Chas
|
|
|
|
<p>We went up Hoher Dachstein. Across the glacier - saw one uncovered
|
|
crevasse - up a snowslope & then via an incredible number of fixed
|
|
enormous pegs to the top. Having carried beer up for summit celebrations Chas
|
|
reached the top, dumped the sack and broke a bottle, flooding several
|
|
people's gear. Weather got worse & we came down. V. fine walk.
|
|
|
|
<p>Chas.
|
|
|
|
<hr /><a id="id1982-115-20">Friday / Saturday 13/14
|
|
August</a> 115 Derigging & Surveying
|
|
|
|
<p>Pete and Andy D
|
|
|
|
<p>Got down to the bottom in about 5 hours, where we ritually peed in the
|
|
sump and photographed it. Its rather similar to the one in Penyghent, in a
|
|
rift, and looking as if it goes deep. There is a small passage going up above
|
|
the sump, but it is full of boulders and we didn't think it was the time to
|
|
start digging. We surveyed and derigged the two big pitches in 5 hours and
|
|
managed to take the tackle thru the duck before it all got too much and we
|
|
left it at the head of the last streamway pitch. 4½ hours, 60 stations
|
|
and 5 bars of chocolate later we decided we were bored with surveying and
|
|
jacked in at the head of last year's undescended pitch. We arrived back at
|
|
camp after 16½ hrs caving and ate a vast amount before we went to bed.
|
|
We met Chas & Dave at the camp, then Andy + Mike who relieved us of
|
|
tackle bags at the bottom of the rift pitches. The entry was rather slow due
|
|
to severe abrasion problems in very sensitive areas. Just managed to see the
|
|
fireworks as we came out.
|
|
|
|
<p align=right>Pete
|
|
|
|
<p align=right>32 hours
|
|
|
|
<p><a href="#id1982-115-22">Next derigging trip</a> /
|
|
<a href="#id1982-115-19">Previous bottoming trip</a> /
|
|
<a href="#id1982-115-21">Next (survey/sherpa) trip</a> /
|
|
<a href="#id1982-115-18">Previous surveying trip</a> /
|
|
<hr /><a id="id1982-115-21">Saturday 14th August</a> 115 Surveying
|
|
|
|
<p>Mike & Andy W
|
|
|
|
<p>Good late start, but not too inefficient down to Ramp. Survey went rather
|
|
slowly. Like everywhere else in the cave, its a bastard to sketch the ramp.
|
|
You can tell how slow progress was when two of us had time for 4 (four)
|
|
pisses and one shit at just one rebelay. Surveying hurriedly (but not too
|
|
quickly) out of the serious odour zone, we heard Pete & Andy coming up
|
|
from below. Not wishing to collide part way down a rope, we waited and then
|
|
carried gear for the deriggers to the entrance. Out in time for an aerial
|
|
view of the fireworks. Rotten traffic jams in Altaussee.
|
|
|
|
<p align=right>6 hrs
|
|
|
|
<p><a href="#id1982-115-22">Next surveying trip</a> (same day and overnight) /
|
|
<a href="#id1982-115-20">Previous surveying trip</a>
|
|
<hr /><a id="id1982-115-22">Saturday / Sunday 13/14th</a> [actually 14/15th,
|
|
Ed.] 115 Surveying, Derigging, photoing, bat rescue, etc.
|
|
|
|
<p>Chas + Dave. <font size=-2>Gortcha !</font>
|
|
|
|
<p>After wogging all the beans and tuna, leaving only sardines for the other
|
|
intrepid speleos, we went quickly down to the camp & met Pete & Andy
|
|
there. Dismayed to find quite a bit of surveying still to be done, from the
|
|
free climb above the Pool Pitch down to last year's undescended pitch. This
|
|
took us over 100 legs of fast surveying to grade 3. We had Dave's Photo gear
|
|
& photoed the Pool Pitch on the way. Went on down to the duck where Chas
|
|
bravely volunterred to venture into the icy water, the cold clutching at his
|
|
vitals, while Dave stood in up to his waist & took several stunning
|
|
action photos. Then we derigged out as far as the head of the Pool Pitch and
|
|
left all the tackle there. This involved some tremendous activity with a
|
|
pulley and jammer courtesy of Brindle haulage Ltd. - Chas's footloops were
|
|
nearly sawn in half. Back to camp for an ausblaten meal.
|
|
|
|
<p>Leisurely start on Sunday. We piccied the Dartford Tunnel at length - at
|
|
least Dave piccied it while unwilling photographer's assistant scurried round
|
|
in the dark letting off flashguns. We found several bats in the phreas &
|
|
brought out three, carefully packed in a tin, having photographed one in situ
|
|
first. This brings the known total of bats to about 5 and makes me wonder
|
|
whether the phreas does connect to the surface somewhere down the hill.
|
|
|
|
<p>Photographed the Rift pitches & Bell pitch on the way out & exited
|
|
to a colossal thunderstorm. The walk back was the most desperate part of the
|
|
trip & we were grateful to Mike for being in the carpark.
|
|
|
|
<p>33 hrs Chas <--- the longest ever
|
|
|
|
<p><a href="#id1982-115-23">Next surveying trip</a> /
|
|
<a href="#id1982-115-24">Next derigging trip</a>
|
|
<a href="#id1982-115-21">survey/Sherpa trip</a> (earlier same day)
|
|
<a href="#id1982-115-20">Previous derig/camping trip</a>
|
|
<hr /><a id="id1982-115-24">Monday / Tuesday</a>
|
|
|
|
<p align=center>115 Derigging
|
|
|
|
<p>Mike, Pete
|
|
|
|
<p>Spent many hours hauling 4 amazingly heavy tackle bags up from top of Lake
|
|
Pitch to camp, then carried 2 on to Stellerweg chamber where we rigged a rope
|
|
down the climb. So to bed, only to be woken by Andy & Andy at ~3 in the
|
|
morning. Next day we derigged to camp, had a bonfire with the rubbish &
|
|
carried all the gear back to Big Chamber. The inlet pitches were extremely
|
|
wet indeed. So we left the tackle bags we were carrying at the top of chamber
|
|
pitch + got ourselves out. But to redeem the situation we brought one of the
|
|
heavy tackle bags Andy + Andy had left at the last rift pitch.
|
|
|
|
<p align=right>31½ hours
|
|
|
|
<p><a href="#id1982-115-25">Final derigging trip</a>
|
|
<a href="#id1982-115-23">survey/Sherpa trip</a> (same overnight)
|
|
<a href="#id1982-115-22">Previous derig/camping trip</a>
|
|
<hr /><a id="id1982-115-23">Monday/Tuesday</a>
|
|
|
|
<p align=center>15th/16th [actually 16/17th]
|
|
|
|
<p>Andy W, Andy D
|
|
|
|
<p>Completed surveying of 115 by surveying from bottom of ramp to part way
|
|
down the connection. Went on to camp sketching as we went. Had a quick meal
|
|
at camp and started carrying the streamway tackle out. Found them too heavy
|
|
and left them at various stages on our journey. Came out at 1.30 pm.
|
|
|
|
<p align=right>~ 18½ hours
|
|
|
|
<p><a href="#id1982-115-25">Final derigging trip</a>
|
|
<a href="#id1982-115-23">Derigging trip</a> (same overnight)
|
|
<a href="#id1982-115-22">Previous surveying trip</a>
|
|
<hr /><a id="id1982-115-25">Wednesday / Thursday 17th/18th [actually 18/19th]</a> <u><b>115
|
|
Final Derig</b></u>
|
|
|
|
<p>Dave, Andy D, Paddy, Chas
|
|
|
|
<p>The lowest gear was in the Big Chamber and we derigged from there with no
|
|
major hitches. Thanks to everyone who carried the gear back from the
|
|
entrance.
|
|
|
|
<p>P.S. Chas was walled in with tackle bags at the entrance crawl. The
|
|
bastards !
|
|
|
|
<p align=center>10 hrs
|
|
|
|
<p>
|
|
<a href="#id1982-115-24">Previous derig/camping trip</a> /
|
|
This was the last CUCC 115 trip to date
|
|
<hr /><a id="id1982-142-5"><u>Thursday 18th [actually 19th]</u></a> 132
|
|
Derigging
|
|
|
|
<p>Mike, Pete
|
|
|
|
<p>We derigged 132 in 1½ hrs, then surface surveyed from the lower to
|
|
the upper entrance of 41; and took lots + lots of bearings on the
|
|
Trisselwand.
|
|
|
|
<p align=right>1½ hours.
|
|
|
|
<p><a href="../1983/log.htm#id1983-142-1">Next trip</a> (1983)/
|
|
<a href="#id1982-142-3">Previous trip</a>
|
|
<hr />
|
|
<!-- LINKS -->
|
|
<ul id="links">
|
|
<li>1982 Expedition info:
|
|
<ul>
|
|
<li>Main Expo report, Cambridge Underground 1983:
|
|
<ul>
|
|
<li><a href="report.htm">CUCC in Austria</a> - Phil Townsend</li>
|
|
<li><a href="41gd.htm">Stellerweg Guidebook Description</a> by Pete Lancaster</li>
|
|
<li><a href="41svy.htm">Stellerweg Survey</a> article by Andy Waddington</li>
|
|
<li><a href="41camp.htm">The Underground Camp</a> by Chas Butcher</li>
|
|
<li><a href="newbit.htm">New Discoveries</a> 1982 by Mike Thomas</li>
|
|
<li><a href="bats.htm">The Bats of 115</a> by Dave Brindle</li>
|
|
</ul></li>
|
|
<li><a href="bcracc.htm">BCRA Caves & Caving Report</a></li>
|
|
</ul></li>
|
|
<li><a href="../../pubs.htm#pubs1982">Index</a> to all publications</li>
|
|
<li><a href="../../index.htm">Back to Expeditions intro page</a></li>
|
|
<li><a href="../../../index.htm">CUCC Home Page</a></li>
|
|
</ul>
|
|
</body>
|
|
</html>
|