mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2024-12-23 17:02:22 +00:00
295 lines
13 KiB
HTML
295 lines
13 KiB
HTML
<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.0//EN">
|
|
<html>
|
|
<head>
|
|
<meta http-equiv="Content-Type" content="text/html; charset=utf8" />
|
|
<title>1623/41, 1623/115 etc. trip history</title>
|
|
<link rel="stylesheet" type="text/css" href="/css/main2.css" />
|
|
</head>
|
|
<body>
|
|
<h1>Stellerweghöhlen system History</h1>
|
|
|
|
<p>This history file is really intended to be a clickable index to
|
|
all the various trips write ups in the log books (ie. just CUCC trips)
|
|
for the whole of the Stellerweg system (ie. 41, 115, 142, 144 and also 143).
|
|
It is currently incomplete because the two logbooks detailing the earliest
|
|
explorations are missing.
|
|
|
|
<h3><a id="id1978">1978</a></h3>
|
|
|
|
<a href="/years/1978/log.htm#id1978-41-1">08.12</a>
|
|
Karl Gaisberger, Andy W, Doug (1 hour) visit 41a collecting bugs
|
|
|
|
<h3><a id="id1980">1980</a></h3>
|
|
|
|
<p>trip list reconstructed from Journal report and personal log book entries
|
|
- some dates are by correlation with trips in other caves. Note that the link
|
|
to the 1980 logbook is not very useful, as the logbook is missing and there
|
|
is just some dummy info in the file. This also is why there are no other
|
|
links to trips in 1980.
|
|
|
|
<p>
|
|
<a href="/years/1980/log.htm#id1980-41-1">07.30</a>
|
|
Andy W, Budge (3½ hrs) enter 41a and find new way on at once<br>
|
|
07.30 Steve, Julian reach greasy ladder pitch above Big Pitch in 41<br>
|
|
07.31 Steve, Julian 15m down Big Pitch in 41 before light failure<br>
|
|
08.02 Julian, Nick bottom Big Pitch and find start of small pitches in 41<br>
|
|
08.02 Steve, Ben push on to head of Big Rift in 41<br>
|
|
08.02 Clive, Tim fail to reach front owing to mishap on Big Pitch in 41<br>
|
|
08.03 Nick, Budge check out 'obvious' way to German Route in 41<br>
|
|
08.04 Julian, Nick push down pitches in German route in 41<br>
|
|
08.05 Ben, Steve push to end of reasonable pitches in German Route in 41<br>
|
|
08.06 Clive, Julian rig into Big Rift in 41<br>
|
|
08.08 Steve, Julian hasty retreat from flood in Big Rift in 41<br>
|
|
08.10 Ben, Steve push on in Big Rift in 41<br>
|
|
08.11 Andy W, Julian (surveying to Big Rift), Steve, Tim (push down last two 17m pitches) (12½-13 hrs) and derig 41<br>
|
|
|
|
08.xx Julian, Budge survey from head of Big Pitch out to 41 entrance<br>
|
|
|
|
0x.xx Ken, Tim?, Clive?, Simon K find 115 and start first dig<br>
|
|
0x.xx+1 Clive, ?,? through first dig to hopeless choke in 115<br>
|
|
0x.xx+ First bolting trip in 115<br>
|
|
0x.xx+ Clive, ? Second bolting trip in 115 reaches hole across pitch head - blind, real way on found<br>
|
|
0x.xx Simon K, Ken push to head of Ramp in 115 but fail to spot way on<br>
|
|
0x.xx Derigging 115, and proper way on found
|
|
|
|
<h3><a id="id1981">1981</a></h3>
|
|
|
|
A 1981 trip list is pretty much impossible to reconstruct because of the
|
|
non-narrative nature of the published reports and the absence of the log
|
|
book. Stellerweg took "about a week" to rig to the previous limit, whilst
|
|
115 was rigged in one day. Several trips pushed into the depths via the
|
|
Purgatory from 115, and there were a number of 41/115 through trips.
|
|
Derigging 115 was done in three waves.
|
|
|
|
<p><!-- a href="/years/1981/log.htm#id1981-115-1" -->0x.xx<!-- /a --> Rigging in to previous limit in 115<br>
|
|
0x.xx more trips<br>
|
|
0x.xx Pete, ? (11 hrs) push the Purgatory from 115, Pete ill on trip
|
|
0x.xx Chas., Clive O grade 3 survey from Confluence to 12 foot climb
|
|
|
|
<h3><a id="id1982">1982</a></h3>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-1">07.27</a>
|
|
Dave, Ian 115 rigging wave 1 down Ramp (9 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-2">07.27</a>
|
|
Mike, Phil T 115 rigging wave 2 down into Rift pitches (8 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-S">07.27</a>
|
|
Chas, Andy D surface survey 113 to 115<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-3">07.28</a>
|
|
Chas, Ian 115 rigging wave 1 in Rift pitches (8 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-4">07.28</a>
|
|
Andy D, Dave 115 rigging wave 2 to Big Chamber (11 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-5">07.29</a>
|
|
Pete, Phil T 115 through Purgatory and rig 3 streamway pitches (14 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-6">07.30</a>
|
|
Andy D, Chas 115 rig last three 1981 pitches and two new ones to The Slit (14
|
|
hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-142-1">07.31</a>
|
|
Pete, Mike, Phil T prospecting, found 141, 142<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-142-2">08.01</a>
|
|
Phil T, Mike push 142 and 141 (3 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-7">08.01</a>
|
|
Ian, Dave in 115 to Dartford Tunnel and new ground to Echo Aven, finding
|
|
the confluence from above without recognising it (10 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-8">08.01</a>
|
|
Tim, Phil S 115 tourist to Inlet Pitches (5 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-9">08.02</a>
|
|
Phil S, Chas surveying 115 Big Chamber area (7 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-10">08.02</a>
|
|
Mike, Phil T some rerigging and push 115 to Coming Soon (15 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-11">08.02</a>
|
|
Tim, Pete push 115 through duck to find Orgasm Chasm (16 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-142-3">08.04</a>
|
|
Doug, Mike in 142 for 4 hours, both lost each other<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-12">08.05</a>
|
|
Phil S, Janet in 115 abortive Purgatory survey (c6 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-13">08.05</a>
|
|
Chas, Dave in 115 pushing Orgasm Chasm, spot Purgatory Bypass from the
|
|
Confluence, and use it to exit (16½ hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-14">08.05</a>
|
|
Phil T, Pete push Dartford Tunnel ramifications, finding Chas & Dave's
|
|
arrows up from confluence (11 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-142-4">08.05</a>
|
|
Tim, Andy D, Mike in 142, find Big Chamber (5 hrs)<br>
|
|
|
|
08.08 Paddy, Dave in 115 sherpa gear for camp (not written up separately)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-15">08.08-9</a>
|
|
Tim, Phil T in 115 to establish camp 1 then push almost to duck (31 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-16">08.08</a>
|
|
Pete, Andy W survey 115 entrance series (6 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-17">08.10-11</a>
|
|
Mike, Andy D in 115 find Orgasm Chasm too wet, but camp anyway (28 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-18">08.10-11</a>
|
|
Pete, Andy W survey 115 streamway and Purgatory bypass centre line (21
|
|
hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-19">08.11-12</a>
|
|
Chas, Dave 115 - the bottom (29½ hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-20">08.13-14</a>
|
|
Pete, Andy D survey and derig from bottom of 115 (32 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-21">08.14</a>
|
|
Mike T, Andy W survey 115 Ramp pitches and derig sherpa (6 hrs)<br>
|
|
|
|
<p>At this point, people writing in the log book lost track of either what
|
|
day it was, or what date it was. Dates here assume the latter.<p>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-22">08.14-15</a>
|
|
Chas, Dave survey 115 streamway, photo, derig, bat removal (33 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-23">08.16-17</a>
|
|
Andy W, Andy D 115 finish Rift and Bypass surveys and sketch over bypass
|
|
centre line, then carry streamway tackle out (18½ hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-24">08.16-17</a>
|
|
Mike, Pete derig 115 from Lake Pitch to camp (31½ hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-115-25">08.18-19</a>
|
|
Dave, Andy D, Paddy, Chas derig 115 to surface (10 hrs)<br>
|
|
|
|
<a href="/years/1982/log.htm#id1982-142-5">08.19</a>
|
|
Mike, Pete derig 142 (1½ hrs)
|
|
|
|
<h3><a id="id1983">1983</a></h3>
|
|
|
|
<a href="/years/1983/log.htm#id1983-142-1">07.25</a>
|
|
Mike T, Wiggy (4 hrs) pushing leads in 142 Big Chamber<br>
|
|
<a href="/years/1983/log.htm#id1983-142-2">07.27</a>
|
|
Mike T, Dave B (no TU) surveying in 142<br>
|
|
<a href="/years/1983/log.htm#id1983-142-3">07.27</a>
|
|
Becky, Wiggy (no TU) push pitch near 142 entrance to choke<br>
|
|
<a href="/years/1983/log.htm#id1983-143-1">07.28</a>
|
|
Tony M, Nicky discover 143 & 144 (not entered)<br>
|
|
<a href="/years/1983/log.htm#id1983-143-2">07.30</a>
|
|
Tony M, Nicky (no TU) push both 143 and 144 a short way<br>
|
|
<a href="/years/1983/log.htm#id1983-143-3">07.31</a>
|
|
Tony M, Nicky (no TU) push 143 to 3rd pitch<br>
|
|
<a href="/years/1983/log.htm#id1983-142-4">08.01</a>
|
|
Wiggy, Gail, Phil S (no TU) pushed and surveyed odd bits in 142<br>
|
|
<a href="/years/1983/log.htm#id1983-143-4">08.01</a>
|
|
Pete L, Dave B (5½ hrs) take over 143 and bottom it<br>
|
|
<a href="/years/1983/log.htm#id1983-144-3">08.01</a>
|
|
Tony M, Nicky (no TU) push 144 down a couple of pitches<br>
|
|
<a href="/years/1983/log.htm#id1983-142-5">08.04</a>
|
|
Phil S, Gail (5 hrs) 142
|
|
<a href="/years/1983/log.htm#id1983-144-4">08.04</a>
|
|
Pete L, Dave B (7 hrs) 144 down pitches until no more gear
|
|
<a href="/years/1983/log.htm#id1983-142-6">08.06?</a>
|
|
Phil S, Julian, Naomi (5 hrs) connect 142 to 41
|
|
<a href="/years/1983/log.htm#id1983-143-5">08.06</a>
|
|
Pete L, Chas (5 hrs) survey and derig 143
|
|
<a href="/years/1983/log.htm#id1983-144-5">08.07</a>
|
|
Pete L, Dave B (no TU) bottomed 144
|
|
<a href="/years/1983/log.htm#id1983-142-7">08.09</a>
|
|
Phil S, Gail (7½ hrs) survey and derig 142 - 41
|
|
<a href="/years/1983/log.htm#id1983-144-6">08.09</a>
|
|
Pete L, Dave B (16½ hrs) tidy up, survey and derig 144
|
|
|
|
<h3><a id="id1984">1984</a></h3>
|
|
|
|
<a href="/years/1984/log.htm#id1984-142-1">07.23</a>
|
|
Mike M, Bill, Brian D (4 hrs) in 142 to 41 to look for upward leads towards 143<br>
|
|
<a href="/years/1984/log.htm#id1984-142-2">07.24</a>
|
|
Mike M, Brian D, Wiggy (10 hrs) 142 photo trip to Big Chamber then push in 41<br>
|
|
<a href="/years/1984/log.htm#id1984-142-3">07.29</a>
|
|
Bill, Pete L, Mike M (8 hrs) 142 to 41 survey inlet towards 143<br>
|
|
<a href="/years/1984/log.htm#id1984-142-4">07.30</a>
|
|
John, Brian, Wiggy (6 hrs) 142 photo trip and fail to reach 41 leads<br>
|
|
<a href="/years/1984/log.htm#id1984-143-1">07.31</a>
|
|
Pete L, Mike M (4½ hrs) rig 143 to look for connection<br>
|
|
<a href="/years/1984/log.htm#id1984-143-2">08.02</a>
|
|
John P, Andy W (4 hrs) down 143 to hammer and shout<br>
|
|
<a href="/years/1984/log.htm#id1984-142-5">08.02</a>
|
|
Bill, Wiggy (4 hrs) in 142 to listen and shout<br>
|
|
<a href="/years/1984/log.htm#id1984-142-6">08.06</a>
|
|
Pete, John P (2 hrs) derig 142<br>
|
|
<a href="/years/1984/log.htm#id1984-143-3">08.08</a>
|
|
Brian D, Wiggy (4½ hrs) derig 143
|
|
|
|
<h3><a id="id1985">1985</a></h3>
|
|
|
|
<p>The logbook is pretty light on dates, and the photocopy is missing a few
|
|
title lines and T/Us, so this may be incomplete.<p>
|
|
|
|
<a href="/years/1985/log.htm#id1985-144-1">07.29</a>
|
|
Brian D, Mike R, Chris S (1½ hrs) start rigging 144<br>
|
|
<a href="/years/1985/log.htm#id1985-142-1">07.29-30</a>
|
|
Mike M, Mark R, Gavin, Tina, Stef (6¼ hrs)
|
|
SRT practice in 142 and new connection to 41<br>
|
|
<a href="/years/1985/log.htm#id1985-144-2">07.30?</a>
|
|
Chris S, Mike R (6 hrs) more rigging 144<br>
|
|
<a href="/years/1985/log.htm#id1985-142-2">07.30</a>
|
|
Mike M, Gavin, Tina (8 hrs) survey in 142<br>
|
|
<a href="/years/1985/log.htm#id1985-144-3">07.31</a>
|
|
Brian, Mark R, Stef (10½ hrs) push 144 finding Roddick's Dive<br>
|
|
<a href="/years/1985/log.htm#id1985-144-4">07.31</a>
|
|
?,? (11 hrs) join above and push extension in 144<br>
|
|
<a href="/years/1985/log.htm#id1985-144-5">08.06?</a>
|
|
Mike R, Chris S, Stef (6½ hrs) establish 144 food dump and push on<br>
|
|
<a href="/years/1985/log.htm#id1985-144-6">08.07</a>
|
|
Mike M, Mark R, Chris S (18 hrs) made 144/41 connection and surveyed out<br>
|
|
<a href="/years/1985/log.htm#id1985-144-7">08.08-09</a>
|
|
Mike R, Tina, Brian D (11 hrs), Gavin (9½ hrs), Stef (8 hrs)
|
|
derigging in 144<br>
|
|
<a href="/years/1985/log.htm#id1985-142-3">08.11</a>
|
|
Gavin, Mike R (8 hrs), Chris S, Tina (8½ hrs)
|
|
survey 142 Big Chamber and Mg ribbon burn
|
|
|
|
<h3>1980-1996</h3>
|
|
|
|
<p>A large amount of exploration in <span lang="de">Schwabenschacht</span>
|
|
carried on in the interregnum by our friends from
|
|
<span lang="de">Stuttgart</span> - connecting to 142 near head of Big Chamber
|
|
pitch in May 1996.
|
|
|
|
<h3><a id="id1996">1996</a></h3>
|
|
|
|
<a href="/years/1996/log.htm#id1996-142-1">07.16</a>
|
|
Wookey, <span lang="de">Thilo,</span> (5 hrs) ... Surveying connection from 78 to 142
|
|
|
|
<h3>Post-1996</h3>
|
|
|
|
<p>A considerable amount of resurvey work has been carried out in the system
|
|
by our friends from <span lang="de">Stuttgart</span>, along with quite a bit of new exploration. This culminated in the discovery of some huge trunk
|
|
passage completely overlooked by CUCC in 1981/2, which promises to produce a
|
|
new low-level entrance in 2000 or 2001. This is a continuing project
|
|
typically involving several short expeditions each year. CUCC liaises with
|
|
Arge, and there is a healthy exchange of survey data. However - we don't
|
|
yet document their finds on the site - it is hoped to provide English
|
|
translations of the cave descriptions some time, but it's unlikely we'll
|
|
ever list all the trips which explored the cave.
|
|
|
|
<hr />
|
|
<!-- LINKS -->
|
|
<ul id="links">
|
|
<li>Cave description <a href="../41.htm">overview</a></li>
|
|
<li><a href="survey.htm">The surveys</a></li>
|
|
<li><a href="../index.html#id41"><span lang="de-at">Schwarzmooskogel</span>
|
|
ridge area</a></li>
|
|
|
|
</ul>
|
|
</body>
|
|
</html>
|