mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2024-11-29 21:32:00 +00:00
90 lines
4.5 KiB
HTML
90 lines
4.5 KiB
HTML
<html>
|
|
<head>
|
|
<meta http-equiv="Content-Type" content="text/html; charset=utf8" />
|
|
<title>CUCC Expedition Rigging Handbook: A New Pitch</title>
|
|
<link rel="stylesheet" type="text/css" href="../../css/main2.css" />
|
|
</head>
|
|
<body>
|
|
<h2 id="tophead">CUCC Expo Rigging Handbook</h2>
|
|
<h1>Your first pitch</h1>
|
|
|
|
|
|
<h3>A New Pitch !</h3>
|
|
|
|
<p>So your cave goes, and you have reached a large black space. Whether your
|
|
reaction is joy or terror, there are a few things to consider before
|
|
leaping, lemming-like, into the void on a handy piece of string, or running
|
|
back to top camp to announce that the cave is "bottomless".</p>
|
|
|
|
<p>How deep is the pitch ? Where would be the ideal line of descent, avoiding
|
|
rub points, loose rock, mud and/or water ? Is there an obvious traverse
|
|
level across the top of the pitch, or a short way down ? Can you actually
|
|
<b><i>see</i></b> any of this without starting to rig ? Look across the
|
|
pitch as well as down it - there may be accessible passage still to
|
|
explore and always a chance that the pitch can be climbed or bypassed
|
|
entirely. Look up too: if there is an aven it may give a clue as to where
|
|
flood inlets might appear, or there may be loose rock or ice formations
|
|
up there to be considered.</p>
|
|
|
|
<p>The traditional method of judging the depth of a pitch is to lob a rock
|
|
down. <span lang="fr">Casteret</span> always used to wrap his rock in a copy
|
|
of "<i lang="fr">Le Monde</i>" and set it alight before casting it into the
|
|
void. Before chucking <b>anything</b> down a pitch, consider whether there
|
|
could be another party down there, perhaps having come by an entirely
|
|
different route. In <span lang="de">Kaninchenhöhle</span> in
|
|
particular, this is a very real possibility.</p>
|
|
|
|
<p>A traverse/security line is often useful to approach the edge of a new
|
|
pitch. This may or may not become a permanent part of the rigging, but
|
|
until the safety of the pitch head has been assessed, it is better to be
|
|
safe than sorry. Such a rope will often enable you to reach a better
|
|
viewpoint (or rock-chucking point :-) to assess the pitch, and certainly
|
|
confers a greater degree of confidence when scrambling about looking for
|
|
potential rig points.</p>
|
|
|
|
<p>When throwing your rock, only the time to the first bounce is really
|
|
relevant, unless it continues to rattle on for <b>very much</b> longer. If
|
|
you can drop it in a "free hang" then this will give you a good idea of the
|
|
minimum length of rope needed before a rebelay is required.</p>
|
|
|
|
<h3>Rigging it</h3>
|
|
|
|
<div class="onleft">
|
|
<a href="../l/rbelay.html">
|
|
<img alt="Rebelay photo - 32k" src="../t/rbelay.jpg" width="150" /></a></br><span
|
|
class="caption">Rope to tight</br>(click to enlarge)</span>
|
|
</div>
|
|
<p>There are two two obvious tactical errors you can make when rigging a new
|
|
pitch. On the one hand, you can spend ages bolting a perfect hang, only
|
|
for the first person to find the pitch ends blind. On the other hand, you
|
|
can bodge up a rig to check that it goes, then fail to rig properly before
|
|
it takes a lot of traffic. The first error is frustrating and limits your
|
|
finding of new stuff. The second error can be terminal at worst and at best
|
|
can waste a lot more time than would have been needed to rig properly.</p>
|
|
|
|
<p>If a pitch is roomy, draughts strongly or is in an immensely promising
|
|
location, it is probably worth taking the time to rig it properly from the
|
|
start. If the pitch is small, has no draught or is likely to drop back into a
|
|
known part of the cave, it is probably better to send someone down before
|
|
investing too much effort. You can make it safe pretty quickly with rope
|
|
protectors and perhaps deviations off naturals, without taking the time to
|
|
place bolts which you will need for a more permanent rig.</p>
|
|
|
|
<p>Experience in the UK should have given you a good feel for when a pitch
|
|
is well-rigged. It won't take too long in Austria to get a feel for how
|
|
it can go wrong. If you find a pitch badly rigged by someone else, don't
|
|
assume it must be OK because they survived. If you can improve the rig,
|
|
do so; if not, consider carefully whether you should go down at all.</p>
|
|
|
|
<p>A well-rigged pitch should not be overly gymnastic, nor, ideally, should
|
|
it have either very long or very short sections, which result in a lot of
|
|
waiting around for the other person(s) in a group. Loops at rebelays should
|
|
not disappear when the rope is unloaded, and should be long enough to allow
|
|
the removal of any type of descender. They do not need to be long enough to
|
|
stand in - especially if the pitch above is short. Overmuch slack at a
|
|
rebelay will result in a high fall-factor if the belay fails.</p>
|
|
|
|
<hr /></body>
|
|
</html>
|
|
|