mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2024-11-25 16:52:00 +00:00
204 lines
11 KiB
HTML
204 lines
11 KiB
HTML
<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.0//EN">
|
|
<html>
|
|
<head>
|
|
<meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1" />
|
|
<title>1623/136 Steinschlagschacht: Forbidden Land</title>
|
|
<link rel="stylesheet" type="text/css" href="../../css/main2.css" />
|
|
</head>
|
|
<body>
|
|
<p><center><a href="top.htm"><img alt="Overview "
|
|
src="ovview.png" width=40 height=40></a>
|
|
<a href="pixsf.htm"><img alt=" Photos "
|
|
src="vtour.png" width=40 height=40></a>
|
|
<img alt="Rigging" src="rigbut.png" width=40 height=40>
|
|
<a href="names.htm"><img alt=" Glossary "
|
|
src="idx161.png" width=40 height=40></a>
|
|
<a href="../index.html#id161"><img alt=" Desc "
|
|
src="desc.png" width=40 height=40></a>
|
|
<a href="../../index.htm"><img alt=" Expo "
|
|
src="ausbut.png" width=40 height=40></a>
|
|
<a href="../../infodx.htm"><img alt=" Topics "
|
|
src="index.png" width=40 height=40></a>
|
|
<a href="../../indxal.htm"><img alt=" Index "
|
|
src="indxal.png" width=40 height=40></a>
|
|
<a href="../../../index.htm"><img alt=" CUCC"
|
|
src="cucc.png" width=40 height=40></a></center>
|
|
|
|
<h2>1623/136 Steinschlagschacht: Forbidden Land</h2>
|
|
|
|
<h3><a name="forbidden">Overview</a></h3>
|
|
|
|
<p>Originally explored in 1996 via an extremely loose and unpleasant
|
|
area of passages from <a href="fbland.htm#rhorror">Rocky Horror</a>
|
|
in Kaninchenhöhle. This was seen as sufficiently dangerous that
|
|
there were many refusals ever to go back, all subsequently rescinded in the
|
|
pursuit of new passage trending so promisingly SW towards the Southern
|
|
Schwarzmosskogelsystem. Fortunately, the area was reached (in 1997) by
|
|
determined exploration in the 1983 discovery Steinschlagschacht, and is
|
|
therefore now readily accessible. The passages are here described in the
|
|
correct direction for future exploration from this route of access.
|
|
|
|
<h3><a name="ealgor">Elin Algor</a>
|
|
(<a href="../../years/1996/index.htm">1996</a>)</h3>
|
|
|
|
<p>At the far end of the <a href="136.htm#thegods">Gods' Traverse</a> in
|
|
Steinschlagschacht, a hanging rebelay just over the edge of the wall
|
|
leads, with a wide swing, to a large eyehole on the opposite wall. A short
|
|
(15m) pitch against the wall on the outside of the hole leads to a large
|
|
muddy sloping ledge at the back of which is a hole into narrow traversy
|
|
passage, Elin Algor, first discovered from the other end in 1996.
|
|
|
|
<p>This soon enlarges and goes NE for 40m enlarging all the way, past an
|
|
unexplored and unpromising pitch through boulders in the floor on the left
|
|
[<a name="qC1996-161-94" href="qmtodo.htm#C1996-161-94">C1996-161-94</a> C], to a wide junction.
|
|
Sharp left (back west) is <a href="#twerke">Tirolia Werke</a>,
|
|
whilst straight on, the main Elin Algor passage followed for another 30m,
|
|
reducing in size to where the continuation is reached by climbing up
|
|
awkwardly through boulders to emerge in the floor. This can be bypassed by a
|
|
pitch up (bolted) and a climb down beyond. Here, a rift can be followed under
|
|
the main way for c20m, whilst the chossy rift above goes a similar distance
|
|
to where there is a window (exactly head sized) to a pitch on the right
|
|
[<a name="qC1996-161-82" href="qmtodo.htm#C1996-161-82">C1996-161-82</a> C].
|
|
|
|
<p>Still heading NE, the rift enlarges and becomes less chossy. Twenty metres
|
|
on, a 15m passage on the right leads to the foot of an impressive aven. A
|
|
little further on, the passage opens out to 7m wide and 13m high. An obscure
|
|
3m climb up on the left, followed by a traverse is the way into
|
|
<a href="#pumph">Pump House</a> (the original entry point from 161) bypassing
|
|
the obvious 6m pitch up. There is an aven in the roof here.
|
|
|
|
<p>Ahead, easy going for 50m NE leads to a big sand cliff/slope into a large
|
|
chambery thing. A 10m handline on the right (bolt RH wall) leads down into it. Traversing round to the right at the level of the handline bolt
|
|
a steep (45°) loose muddy ramp ascends for 20-30m, turning left near the beginning. This ends at a small rift slope, mostly choked with mud and
|
|
rocks, through which is a pitch of perhaps 20m. The pitch head needs some
|
|
gardening and a smallish person [<a name="qC1999-136-nn"
|
|
href="qmtodo.htm#C1999-136-nn">C1999-136-nn</a> C].
|
|
|
|
<p>There are numerous ways off the chambery thing at the bottom of the
|
|
handline, but it is not clear where the gale goes. To the right, between
|
|
mudbanks, is the wet foot of a largish pitch. The water goes down an
|
|
impenetrable crack. A chossy 10m climb up a mud bank on the left leads to a
|
|
smallish tube at 'floor' level
|
|
[<a name="qC1996-161-81" href="qmdone.htm#C1996-161-81">C1996-161-81</a> C].
|
|
This was looked at in 1997: the tube is only about 4m long, but has 2
|
|
right-angle bends making it very difficult for tall people. It emerges into
|
|
the wall of a big shaft which couldn't be explored owing to lack of tackle
|
|
[<a name="qC1997-161-40" href="qmtodo.htm#C1997-161-40">C1997-161-40</a> A].
|
|
|
|
<p>There is a 15m diameter, 15m deep undescended pitch on the far side of
|
|
the large chambery thing
|
|
[<a name="qC1996-161-79" href="qmtodo.htm#C1996-161-79">C1996-161-79</a>
|
|
A], with probably an aven at the far end.
|
|
|
|
<p>On the left is a wet area where the water can be followed into a rift for
|
|
some metres, unfinished
|
|
[<a name="qC1996-161-80" href="qmtodo.htm#C1996-161-80">C1996-161-80</a> C].
|
|
Above this, 10m of passage leads to a 4m pitch, bridged by a large rock.
|
|
traversing the bridge leads to a squalid crawl over mud which gets too small
|
|
without digging after 10m. Descending the pitch leads to about 80m of small
|
|
winding draughting passage explored as far as a chossy pitchhead
|
|
[<a name="qC1996-161-78" href="qmtodo.htm#C1996-161-78">C1996-161-78</a> A].
|
|
|
|
<h3><a name="pumph">Pump House</a> and Hall of the Mounting Choss
|
|
(<a href="../../years/1996/index.htm">1996</a>)</h3>
|
|
|
|
<p>Above the climb from Elin Algor, a howling gale fills the 6m x 2m
|
|
phreatic passage, <b>Pump House,</b> leading for 70m to emerge in the
|
|
<b>Hall of the Mounting Choss,</b> a few metres (climbable) up its SE wall.
|
|
|
|
<p><a name="hotmc">Hall of the Mounting Choss</a> is a very long, steep
|
|
chamber, about 25m wide, 20m high and 80m long (above the rocks!). To the
|
|
left of the point of emergence from Pump House, is an inaccessible hole
|
|
(would need bolts)
|
|
[<a name="qC1996-161-77" href="qmtodo.htm#C1996-161-77">C1996-161-77</a> C].
|
|
Below this, at floor level, is the way into
|
|
<a href="fbland.htm#wimpway">Whimper Way,</a> leading to 161. Further left,
|
|
near the lowest (S) side of the chamber is another passage leading 5m to a
|
|
closed 5m high solution aven. To the right of the point of emergence is
|
|
another opening which quickly chokes with sand. There is a small, undescended
|
|
rift pitch in the W corner
|
|
[<a name="qC1996-161-76" href="qmtodo.htm#C1996-161-76">C1996-161-76</a> B].
|
|
The various holes in the floor down through boulders have been fairly
|
|
thoroughly checked and no ways on found.
|
|
|
|
<p>At the top of the 40m slope there is a big aven in the N corner and
|
|
a pair of pitches
|
|
[<a name="qC1996-161-74" href="qmtodo.htm#C1996-161-74">C1996-161-74</a> A
|
|
on the right and
|
|
<a name="qC1996-161-75" href="qmdone.htm#C1996-161-75">C1996-161-75</a> A
|
|
on the left]. The left hand hole has been descended and
|
|
<a href="offfld.htm#hotmcp">still continues</a>. There is a secondary low
|
|
point in the NE corner. Climbing down through the floor here leads back to
|
|
Whimper Way (NE of the entry point). A 15m x 15m x 10m boulder can be passed
|
|
by an 8m climb on the right. A harder 8m climb is also possible on the left.
|
|
These gain another 60m of passage over large breakdown to a draughting choke
|
|
of small rocks coming down from above
|
|
[<a name="qC1996-161-71" href="qmtodo.htm#C1996-161-71">C1996-161-71</a> C].
|
|
Just before this on the left wall there is a draughting crawl below an undercut [<a name="qC1999-136-nn" href="qmtodo.htm#C1999-136-nn">C1999-136-nn</a>.
|
|
Above the huge boulder are steeply sloping QMs in the left hand wall
|
|
[<a name="qC1996-161-73" href="qmtodo.htm#C1996-161-73">C1996-161-73</a> B].
|
|
Protection is needed for the climb.
|
|
|
|
<h3><a name="twerke">Tirolia Werke</a>
|
|
(<a href="../../years/1996/index.htm">1996</a>)</h3>
|
|
|
|
<p>Northwest at the wide junction in Elin Algor (to the right coming from
|
|
161, left coming from Steinschlagschacht), <b>Tirolia Werke</b> soon turns
|
|
west. Climbing down on the right at the start of the passage there is a good
|
|
carbide fill pool. There is a small stream for the first 15m which then
|
|
sinks. There is a small passage (to NW) just at the start, which has not been
|
|
explored
|
|
[<a name="qC1996-161-84" href="qmtodo.htm#C1996-161-84">C1996-161-84</a> C].
|
|
An awkward 3m sand climb (<a href="../../fixaid.htm#tw5m">short handline</a>)
|
|
leads into the first spot that shows the passage type round here. It is
|
|
hading rift, with steep ramps on the right at many points. These have all
|
|
been climbed to where they are steep enough to need gear/practically
|
|
vertical, but have not actually stopped.
|
|
[<a name="qC1996-161-85" href="qmtodo.htm#C1996-161-85">C1996-161-85</a> B
|
|
and <a name="qC1996-161-86" href="qmtodo.htm#C1996-161-86">C1996-161-86</a>
|
|
B], then steeper ramps
|
|
[<a name="qC1996-161-87" href="qmtodo.htm#C1996-161-87">C1996-161-87</a> B
|
|
and
|
|
<a name="qC1996-161-88" href="qmtodo.htm#C1996-161-88">C1996-161-88</a> B].
|
|
The passage continues for 70m to a 3m ladder pitch at an awkward narrow drop
|
|
in the rift floor. Shortly before this pitch a 3m climb up on the right hand
|
|
side leads to a largish chamber at the foot of an aven. There is a small
|
|
tight wet lead in here
|
|
[<a name="qC1997-161-39" href="qmtodo.htm#C1997-161-39">97-39</a> C], and
|
|
there appears to be a parallel rift here (probably the same as that seen
|
|
further along Tirolia Werke).
|
|
|
|
<p>20m beyond this is a small opening low in the left hand wall leading to
|
|
the <a href="offfld.htm#gravpit">Gravel Pit</a>. In the main rift, water can
|
|
be heard behind the right hand wall, presumably in a parallel rift. Climbing
|
|
down under boulders before the slipped wall on the right leads to an
|
|
undescended 5m pitch
|
|
[<a name="qC1996-161-91" href="qmtodo.htm#C1996-161-91">C1996-161-91</a> A].
|
|
Traversing around this (long legs only) reaches a second pit
|
|
[<a name="qC1996-161-92" href="qmtodo.htm#C1996-161-92">C1996-161-92</a> A]
|
|
from which the parallel rift can be seen. There are others scrots under
|
|
boulders here, back to the bottom of the main rift.
|
|
|
|
<p>The rift size is severely reduced here as a large section of the right
|
|
hand wall has slipped down. The next bit can be reached by a narrow rift
|
|
straight ahead, or airy traversing up the ramp on the right. Beyond this last
|
|
widening is a choss slope to a very uninviting boulder choke.
|
|
Probably needs another look, draughty, but not terribly promising
|
|
[<a name="qC1996-161-93" href="qmtodo.htm#C1996-161-93">C1996-161-93</a> C].
|
|
|
|
<hr />
|
|
<!-- LINKS -->
|
|
<div id="menu">
|
|
<ul id="links">
|
|
<li><a href="names.htm">Glossary of passage names</a></li>
|
|
<li><a href="top.htm">Kaninchenhöhle</a> Cave Description - Overview</li>
|
|
<li><a href="../../index.htm">Back to Expedition Intro page</a></li>
|
|
<li><a href="../../infodx.htm">Index to info/topic pages</a></li>
|
|
<li><a href="../../areas.htm">Area/subarea descriptions</a></li>
|
|
<li><a href="../../indxal.htm">Full Index to 1623 caves</a></li>
|
|
<li><a href="../../../index.htm">Back to CUCC Home page</a></li>
|
|
</ul>
|
|
</div>
|
|
</body>
|
|
</html>
|