expoweb/years/2003/priorities.html
2024-02-09 00:01:17 +00:00

75 lines
2.9 KiB
HTML

<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.0//EN">
<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=utf8" />
<title>2003 Expo: Priorities</title>
<link rel="stylesheet" type="text/css" href="/css/main2.css" />
</head>
<body>
<h1 align=center>2003 Expo priorities</h1>
<p>The three primary goals for 2003 are:</p>
<ul>
<li>Razordance
<li>Gaffered to the Wall
<li>Eislufth&ouml;hle
</ul>
<p>The people principally responsible for organising each of these three parallel efforts will be:
<table border>
<tr><td>Razordance:</td><td>Dour, Mark, Dave</td></tr>
<tr><td>Gaffered:</td><td>Martin, Earl</td></tr>
<tr><td>Eislufth&ouml;hle:</td><td>Olly, Tony</td></tr>
</table>
</p>
<p>There are also a number of auxilliary projects. These are largely intended for people to do on rest days,
or if they don't feel like doing a big pitch series. Some of these are listed below; cf. the <a
href="../../1623/204/qm.html">204 QM list</a>.</p>
<h3>Pitch series (requiring bolting)</h3>
<ul>
<li />Merry-Go-Round (Brian's pitches off Swings, QM 02-07 - rock quality not brilliant)
<li />Eleven Second Rattle (QM 01-38)
<li />Merry Fucking Christmas (QM 01-68) <a href="#fn1">*</a>
<li />01-16A (off Boulder Coaster)
<li />(we're never going to run out of pitches!)
</ul>
<h3>Horizontal stuff in Steinbr&uuml;ckenh&ouml;hle</h3>
<ul>
<li />Possible continuation of Crowning Glory (01-10A) - pitch may have been bolted?
<li />Climb 01-79C and 01-78B (possible connection to Helter Skelter, nice one to tick off)
<li />Crawls off Treeumphant (00-16B to 00-26C)
<li />Crawls off main Swings &amp; Roundabouts passage (01-74C to 01-95C)
<li />Attack Helter Skelter boulder choke (drafting, visible way on)
<li />Finish off Up at 45&deg;
</ul>
<h3>Other caves</h3>
<ul>
<li>Hauchh&ouml;hle (has an undescended pitch, and lies above conjectured Kaninchenh&ouml;hle - Steinbr&uuml;ckenh&ouml;hle connection)
<li>Brauningh&ouml;hle (close to Eislufth&ouml;hle, several QMs)
<li>Prospecting for new entrances beyond the ridge to the northeast of Steinbr&uuml;ckenh&ouml;hle
<li>Artischockenh&ouml;hle (needs a surface survey and proper description)
<li>Lots of documentation and resurvey work to tie in loose ends
</ul>
<hr />
<a name="fn1"><font size="-1">* The MFC tube comes out in the side of a large shaft which continues both up
and down. This may connect with a doline on the surface almost directly above. If so, this would provide a
seventh entrance to Steinbr&uuml;ckenh&ouml;hle, although this would not be of much use given the unpleasant
nature of the crawl connecting it to the rest of the cave.</font>
<hr />
<!-- LINKS -->
<ul id="links">
<li><a href="index.htm">Back to 2003 Index</a><br />
<li><a href="../../pubs.htm">Index</a> to all publications</li>
<li><a href="../../index.htm">Back to Expeditions intro page</a></li>
<li><a href="../../../index.htm">CUCC Home Page</a></li>
</ul>
</body>
</html>