<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Strict//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-strict.dtd">
<html>
<!-- Eisluft history file -->
<head>
<meta http-equiv="Content-Type" content="text/html; charset=utf8" />
<title>
1623/76 Eislufth&ouml;hle history
</title>
<link rel="stylesheet" type="text/css" href="/css/main2.css" />
</head>
<body>
<h1>76 Eislufth&ouml;hle History</h1>

<p>This history file is really intended to be a clickable index to
every Eislufth&ouml;hle trip write up in the log books.</p>

<h3>1977</h3>

<p>As the 'official' expedition logbook for 1977 is missing, these write-ups are
in Andy Waddington's personal caving log:</p>

<table>
<tr><td><a href="/years/1977/andylg.htm#id1977-76-1">08.15</a></td><td> Andy W, Nick enter 106, find Plugged Shaft, 106A, 106B (1&frac12; hrs)</td></tr>
<tr><td><a href="/years/1977/andylg.htm#id1977-76-2">08.16</a></td><td> Nick, Simon, Andy W to -75m (3 hrs)</td></tr>
<tr><td><a href="/years/1977/andylg.htm#id1977-76-3">08.17</a></td><td> Andy W, Simon, Nick mostly rerigging (6 hrs)</td></tr>
<tr><td><a href="/years/1977/andylg.htm#id1977-76-4">08.20</a></td><td> Andy W, Simon, Nick to -110m, through choke and find Keg series (7 hrs)</td></tr>
<tr><td><a href="/years/1977/andylg.htm#id1977-76-5">08.21</a></td><td> Andy W, Simon, Nick explore Keg Series, find Follow-Through to -135m (7 hrs)</td></tr>
<tr><td><a href="/years/1977/andylg.htm#id1977-76-6">08.22</a></td><td> Andy W, Simon, Nick reach the Taproom -150m and derig to -75m (7 hrs)</td></tr>
<tr><td><a href="/years/1977/andylg.htm#id1977-76-7">08.24</a></td><td> Rod Leach, Simon, Nick derig to surface</td></tr>
</table>

<h3>1978</h3>
<table>
<tr><td><a href="/years/1978/log.htm#id1978-76-1">07.29</a></td><td> Andy W, Simon rig for SRT to snow platform (3 hrs)</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-2">07.30</a></td><td> Andy W rigging aborted due to thunderstorm (2 hrs)</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-3">07.31</a></td><td> Andy W, Doug reach Yesterday's Terminus (4&frac12; hrs)</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-4">08.01</a></td><td> Simon, Doug finish SRT rigging Plugged Shaft</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-5">08.03</a></td><td> Simon, Andy W SRT rig to Saved Shaft (7 hrs)</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-6">08.04</a></td><td> Doug, Andy W into new ground at -150m (6/5&frac12; hrs)</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-7">08.05</a></td><td> Doug, Simon very little progress</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-8">08.07</a></td><td> Doug, Simon rerig and some new pitch</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-9">08.08-9</a></td><td> Julian, Nick 115m new depth overnight to Balcony (10&frac12; hrs)</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-10">08.09-10</a></td><td> Andy, Doug into Hall of the Greene King and boulder pitch (12&frac14; hrs)</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-11">08.12-13</a></td><td> Nick, Julian, Simon overnighter down Fiesta Run (then crashed car)</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-12">08.14</a></td><td> Andy W, Doug, Mike S survey and photo (7 hrs)</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-13">08.16</a></td><td> Andy W, Doug derig to Taproom (10&frac34; hrs)</td></tr>
<tr><td><a href="/years/1978/log.htm#id1978-76-14">08.19</a></td><td> Nick, Dave F, Jont, Vic, Rod, Doug derig to surface (7&frac12; hrs or less)</td></tr>
</table>

<h3>1979</h3>
<table>
<tr><td><a href="/years/1979/log.htm#id1979-76-1">07.31</a></td><td> Nick, Tony start rigging, thwarted due to snow (1 hour)</td></tr>
<tr><td><a href="/years/1979/log.htm#id1979-76-2">08.01</a></td><td> Andy W, Tony, Ben continue rigging (3 hrs)</td></tr>
<tr><td><a href="/years/1979/log.htm#id1979-76-3">08.02</a></td><td> Nick, Julian reach Balcony pitch (7 hrs)</td></tr>
<tr><td><a href="/years/1979/log.htm#id1979-76-4">08.03</a></td><td> Ben, Andy W (10 hrs), Tony (6 hrs ?) rerigging and find Gents' pitch route</td></tr>
<tr><td><a href="/years/1979/log.htm#id1979-76-5">08.05</a></td><td> Nick, Julian into new ground and a side lead to -400m (9 hrs)</td></tr>
<tr><td><a href="/years/1979/log.htm#id1979-76-6">08.06</a></td><td> Ben, Andy W reorganise gear and push main way to -385m (11 hrs)</td></tr>
<tr><td><a href="/years/1979/log.htm#id1979-76-7">08.07</a></td><td> Simon F (11&frac34; hrs), Simon K (12&frac34; hrs) tourist to end and some rerigging</td></tr>
<tr><td><a href="/years/1979/log.htm#id1979-76-8">08.08</a></td><td> Nick, Julian derig side lead, push to within sight of end of Madlmeierschacht (8 hrs)</td></tr>
<tr><td><a href="/years/1979/log.htm#id1979-76-9">08.08</a></td><td> Andy W, Tony unsuccessful surveying trip (5 hrs)</td></tr>
<tr><td><a href="/years/1979/log.htm#id1979-76-10">08.10</a></td><td> Ben, Andy W bit of rerigging then aborted due to wet (6 hrs)</td></tr>
<tr><td><a href="/years/1979/log.htm#id1979-76-11">08.13</a></td><td> Julian, Andy W, Ben, Simon F, Nick push to bottom and derig to HotGK (14-16 hrs)</td></tr>
<tr><td><a href="/years/1979/log.htm#id1979-76-12">08.14</a></td><td> Tony, Andy C, Simon K derigging (6 hrs)</td></tr>
<tr><td><a href="/years/1979/log.htm#id1979-76-13">08.15</a></td><td> Nick, Simon F, Ben, Julian, Andy C final derig (6&frac12; hrs)</td></tr>
</table>

<h3>2004</h3>
<table>
<tr><td><a href="/years/2004/logbook.html#t2004-07-14B">07.14</a></td><td> Jenny: Locate entrance, bolt+rig to head of Draught Bitter (3&frac12; hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-07-16A">07.16</a></td><td> Jenny, OllyB: bolting Draught Bitter (4 hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-07-17A">07.17</a></td><td> Jenny, OllyB: bolting, rigging and surveying in Plugged Shaft (6&frac12; hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-07-18C">07.18</a></td><td> OllyB, Jenny: Surveying Draft Bitter and 76b (3 hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-07-19D">07.19</a></td><td> Jenny, OllyB: Discover Brave New World, survey The Test Tubes (8 hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-07-22D">07.22</a></td><td> Jenny, OllyB: Bolt and survey Lovers Leap (5&frac12; hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-07-24B">07.24</a></td><td> OllyB, Jenny: Rig rest of Plugged shaft, Saved Shaft and into Keg Series (10 hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-07-25B">07.25</a></td><td> OllyB, Jenny: Surveying horizontal stuff in Brave New World (6 hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-07-26B">07.26</a></td><td> OllyB, Jenny: Brave New World, surveying horizontal stuff and descending A* pitch (11 hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-07-27C">07.27</a></td><td> OllyB, Jenny: Surveying in Brave New World (4&frac34; hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-07-29A">07.29</a></td><td> Jenny: Gear retrieval from Brave New World (1&frac12; hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-07-30C">07.30</a></td><td> OllyB, Jenny: Bolt+survey down Keg Series to sump, survey along Razor Prance (12 hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-08-01B">08.01</a></td><td> OllyB, Jenny: Bolt down to Taproom, surveyed and de-rigged to bottom of Plugged Shaft (10 hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-08-03B">08.03</a></td><td> OllyB, Jenny: Survey Forward to the Past, and into All Ways Chamber from Brave New World (10&frac12; hrs)</td></tr>
<tr><td><a href="/years/2004/logbook.html#t2004-08-04C">08.04</a></td><td> OllyB (13&frac14; hrs), Jenny (13&frac34; hrs): Bolt and survey down Fault Pitch then survey The Boiling Tubes from Brave New World. De-rig everything left. </td></tr>
</table>

<h3>2005</h3>
<table>
<tr><td><a href="/years/2005/logbook.html#t2005-07-23B">07.23</a></td><td> Jenny, OllyB: Rigging Plugged Shaft (5&frac12; hrs)</td></tr>
<tr><td><a href="/years/2005/logbook.html#t2005-07-27A">07.27</a></td><td> Jenny, Olly (both 12 hrs), Dave (11&frac12; hrs): Rigging to the Tap Room, and Adventures in Time and Space connection to Keg Series.</td></tr>
<tr><td><a href="/years/2005/logbook.html#t2005-07-30B">07.30</a></td><td> Jenny, Olly: Rebelay failure in Plugged Shaft (1&frac12; hrs).</td></tr>
<tr><td><a href="/years/2005/logbook.html#t2005-07-31A">07.31</a></td><td> OllyB, Jenny, Dave: Rigging to Spent Ledge, tourist in Brave New World (11 hrs)</td></tr>
<tr><td><a href="/years/2005/logbook.html#t2005-08-05B">08.05</a></td><td> OllyB, Jenny: Pleasant but Pointless, in Brave New World (9&frac12; hrs)</td></tr>
<tr><td><a href="/years/2005/logbook.html#t2005-08-07A">08.07</a></td><td> Jenny, OllyB: Batman and Pancake Chips in Brave New World (11 hrs)</td></tr>
<tr><td><a href="/years/2005/logbook.html#t2005-08-10E">08.10</a></td><td> Jenny, OllyB: Loopy in Brave New World (12&frac12; hrs)</td></tr>
<tr><td><a href="/years/2005/logbook.html#t2005-08-11C">08.11</a></td><td> OllyB, Jenny: Keg Series derigging (6&frac12; hrs)</td></tr>
<tr><td><a href="/years/2005/logbook.html#t2005-08-12A">08.12</a></td><td> OllyB, Jenny: 1970's route, rigging and surveying down from spent ledge. Derigged out to Boulder Chamber (10 hrs)</td></tr>
<tr><td><a href="/years/2005/logbook.html#t2005-08-13A">08.13</a></td><td> Jenny, OllyB: Final derig (3&frac34; hrs)</td></tr>
</table>

<hr />

</body>
</html>