Expo 2012

2012-07-29
Julia Bradshaw, Anthony Day, Martin Green, Jessica Stirrups, Emma Wilson
Holy Bondage

On this date, with the exchange of geartape Julia "the bloke" Bradshaw and Dour "the beardy one" Day were in the sanctity of the tattiehut joined in Holy Bondage until the day that one or the other fall apart.

Registrar: Martin Green
Witnessed: Jessica Stirrups
Emma Wilson


Rope for rigging down to pushing in 204

A => 48 (up), 30, +70 (up) [Last item annnoted 'wrong' in pencil]
King Carbide => 50/60
Brians phat shaft => 82+30
Painted Lady => ~30m
Puss in bolts + on the prowl traverse => 30+27, rope protector,
deviation
Fat Cat => 80, (or 25,45,12) may need more for swing off -> log book
states "QMA would require swing & prob more rigging to assist swing"

Actual ropes => A: 41m, 11mm, chop from 92m
King Carbide: chop from 92m 10mm
Brians : 92 + 38 11mm
Painted Lady => 140m 10mm
Puss in bolts => 34 9mm
On the prowl => 29 9mm
Fat Cat => 140 10mm

2012-08-07
Wookey Serena
Wook comes out in the Wookmobile

Wook & Serena filled the van with lots of food & gear & set off for expo. Remarkably traffic-free trip in the UK & across europe. Relised at dover that we'd failed to bring a map of europe in physical or digital form, so did a quick download + make plan on cheap UK data. Worked very well offline so failed to get lost at all. Had 4hrs kip en-route.

Very hot all the way here until thunderstorms from Reid in Imkreis onwards. _Very_ wet. Got to Bad Aussee having heard that there was a big concert on but traffic had cleared. Main Rd to Grundlesee was closed & we were sent the back way, only to find it was totally packed with drenched pedestrians & vehicles coming the other way. Eventually got to the main rd to find totally stationary traffic. Went nowhere for about half an hour before finally inching down to camp site which was utterly heaving.

Left 5:30pm, arrived 9:30pm.

2012-08-03
Martin Frank
Rigged Tunnockschacht entrance pitches
2012-08-04
Martin Jess, Dour, Frank

Martin rigged Fat Cat and explored the wrong way to solution pocket 8m long & 10m high

Dour sat at the top for 3hrs and got quite cold.

T/U: 8hrs
2012-08-01
Anthony
Rigging 204

Rigged the entrance pitch to 204. Found that the snow was quite low. My spanner made a descent of the 2nd pitch, at which point I went out

T/U: 1hrs
---------
2012-08-04
Frank

Popped down the hole to top of Fat Cat. Jess pointed me towards Emmas alternative hole, using backup of Fat Cat started on a quick pootle downhill. Realised quite quckly I'd been sandbagged into a hard bolting nightmare. No slings so cut end off rope to make one and head down in tight rift.

Ended in rift that opened, placed bolt and headed down. Some minor rubs that probably didn't damage the rope... Found a nice loking natural and destroyed it one hit. Didn't make the mistake a second time and cut end off rope to make a sling, arrived at sharp eyehole looking for deviation - Jess called down from Emmas 'actual' hole 'which was nice'. Lost confidence in rock after dinner-plate fell off. taking note of natural above. made 'Y' hang but [unreadable] with hand bolts. Wish I had not lost drill bit at bivvy.

PS pitch heads back under and appears to connect to Fat Cat pitch.