<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.0//EN"> <html lang=en> <!-- embryonic 182 history file --> <head> <title> 1623/182 Puffball and Icing Sugar Cave history </title> </head> <body> <h1>182 Puffball and Icing Sugar Cave History</h1> <h3>1990</h3> <a href="../../years/1990/log.htm#1990-182-1">07.30</a> Discovery by Jeremy (15 min) and Adam (35 min)<br> <a href="../../years/1990/log.htm#1990-182-2">08.02</a> Joe (1 hr) and Adam (2 hr) push and find going<br> <h3>1991</h3> <a href="../../years/1991/log.htm#1991-182-1">07.04</a> Del, Juliette, Julian H, John (3½ hrs) start rigging<br> <a href="../../years/1991/log.htm#1991-182-2">07.05</a> Tony, John, Mark M (8 hrs) explore Shell Pitch and Q8<br> <a href="../../years/1991/log.htm#1991-182-3">07.06</a> Del, Juliette, Julian H, Mark M (9 hrs) push beyond Shell pitch<br> <a href="../../years/1991/log.htm#1991-182-4">07.07</a> Gill, Jon, Olly (7 hrs) push end and survey partway out<br> <a href="../../years/1991/log.htm#1991-182-5">07.08</a> Gill, Olly (11 hrs) survey down first rope, pushed Tarzan's Folly to Dark Room<br> <a href="../../years/1991/log.htm#1991-182-6">07.09</a> Mark M, Julian T, Olly (10 hrs) push From Dark Room to Cloud Chamber<br> <a href="../../years/1991/log.htm#1991-182-7">07.10</a> Tony, Del, Julian H, Juliette (10½ hrs) survey, and push Fat Knot Fruity - hit by flood pulse<br> <a href="../../years/1991/log.htm#1991-182-8">07.12</a> Mark D, Jon (8½ hrs) push down Traditional Style pitches<br> <a href="../../years/1991/log.htm#1991-182-9">07.12</a> Julian H, Mark M, Julian S (9½ hrs) survey from Darkroom down 2 pitches<br> <a href="../../years/1991/log.htm#1991-182-10">07.16</a> Mark D, Julian H (4 hrs) push lead above Q8<br> <a href="../../years/1991/log.htm#1991-182-11">07.17</a> Wookey, Julian H (3¾ hrs) flood-aborted survey/derig<br> <a href="../../years/1991/log.htm#1991-182-12">07.23</a> Andy, Wook (10 hrs) derig 1st wave<br> <a href="../../years/1991/log.htm#1991-182-13">07.24</a> Henri, Olly (8¾ hrs) derig 2nd wave<br> <h3>1992</h3> <a href="../../years/1992/log.htm#1992-182-1">06.26</a> Mark M, Julian H, Alastair (9 hrs), Matt (6 hrs) rig in<br> <a href="../../years/1992/log.htm#1992-182-2">07.02</a> Mark M, Julian H, Alistair (9½ hrs) rerig/push Piezo towards Dark Room<br> <a href="../../years/1992/log.htm#1992-182-3">07.03</a> Mark M, Julian H, Alistair (11 hrs) push Piezo into Darkroom<br> <a href="../../years/1992/log.htm#1992-182-4">07.03</a> Matt, Glen, Julian S (7 or 8 hrs) discover Brute Force and Ignorance<br> <a href="../../years/1992/log.htm#1992-182-5">07.04</a> Glen, Mark M (11 hrs) rerigging and ferrying gear to front<br> <a href="../../years/1992/log.htm#1992-182-6">07.04</a> Matt, Julian S (7 hrs) rig Ignorance into Dot-to-dot<br> <a href="../../years/1992/log.htm#1992-182-7">07.07</a> Mark S, Clive (5 hrs) tourist to Natural Redundancy<br> <a href="../../years/1992/log.htm#1992-182-8">07.08</a> Olly, Julian S, Glen (7½ hrs) pottering and down to Darkroom<br> <a href="../../years/1992/log.htm#1992-182-9">07.08</a> Matt, Julian H, Alistair, Mark M (14 hours) push Navigational Limit and collapse entrance<br> <a href="../../years/1992/log.htm#1992-182-10">07.10</a> (probably really 07.09) Olly (¼ hr) gingerly retrieves drill from entrance<br> <a href="../../years/1992/log.htm#1992-182-11">07.10</a> Dave, Andrew (3 hrs), "everybody else" stabilise entrance at some risk<br> <a href="../../years/1992/log.htm#1992-182-12">07.11</a> Julian H, Richard, Aggy (8½ hrs) layed 600m cable and checked wet-weather rigging<br> <a href="../../years/1992/log.htm#1992-182-13">07.14</a> Alistair, Clive, Fran, Mark M (13 hrs) push two pitches to sump<br> <a href="../../years/1992/log.htm#1992-182-14">07.14</a> Richie, Jerry (9½ hrs) tourist and pull drill up Piezo<br> <a href="../../years/1992/log.htm#1992-182-15">07.14-15</a> Olly, Julian S (9 hrs) do lots of survey<br> <a href="../../years/1992/log.htm#1992-182-16">07.16</a> Richie, Ali M (5½ hrs) surveying in Strike 2<br> <a href="../../years/1992/log.htm#1992-182-17">07.16</a> Julian H, Wookey (11 hrs), Gill (8 hrs) surveying and some derig<br> <a href="../../years/1992/log.htm#1992-182-18">07.17</a> Olly, Julian S (9 hrs) surveying QS&C<br> <a href="../../years/1992/log.htm#1992-182-19">07.18</a> Julian H, Mark M (11½ hrs), Andy, Tony (8½ hrs) photo and derig bottom<br> <a href="../../years/1992/log.htm#1992-182-20">07.23</a> Julian S (1½ hrs) fails to derig as no rope to pull out<br> <a href="../../years/1992/log.htm#1992-182-21">07.27</a> Wookey, Olly (6 hrs 20) derig most<br> <a href="../../years/1992/log.htm#1992-182-22">07.28</a> Wookey, Olly (6 hrs 50) survey, push odds, derig more<br> <a href="../../years/1992/log.htm#1992-182-23">07.30</a> Clive (2 hrs?) goes to derig, but already done<br> <a href="../../years/1992/log.htm#1992-182-24">08.01</a> Olly (8½ hrs) solo survey, push and derig<br> <hr> <!-- LINKS --> <img alt=">" src="../../../icons/lists/0.gif"> <a href="../182.htm">Back to cave description</a><br> <img alt=">" src="../../../icons/lists/0.gif"> <a href="../../index.htm">Back to Expedition Intro page</a><br> <img alt="--->" src="../../../icons/lists/1.gif"> <a href="../../indxal.htm">Full Index</a><br> <img alt="--->" src="../../../icons/lists/1.gif"> <a href="../../areas.htm">Other areas</a><br> <img alt="------>" src="../../../icons/lists/2.gif"> <a href="../index.htm#182">Plateau area index</a> </body> </html>