mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2025-03-23 02:31:53 +00:00
Add missing trip to logbook. Fixup all Ampersands to html.
This commit is contained in:
parent
8fdb6d65fc
commit
db3acb5b68
@ -31,14 +31,14 @@ get to hang-glide over us though we collected him from his field in Bad Mittendo
|
|||||||
<div class="timeug">T/U: 0hrs, 7½hrs walking</div>
|
<div class="timeug">T/U: 0hrs, 7½hrs walking</div>
|
||||||
|
|
||||||
<div class="tripdate" id="t2016-06-22a">2016-06-22a</div>
|
<div class="tripdate" id="t2016-06-22a">2016-06-22a</div>
|
||||||
<div class="trippeople"><u>Nat</u>, Ash & Elliott</div>
|
<div class="trippeople"><u>Nat</u>, Ash & Elliott</div>
|
||||||
<div class="triptitle"></div>
|
<div class="triptitle"></div>
|
||||||
|
|
||||||
<p>After day of topcamp fettling we set off to Balcony to rig the entrance shaft, after
|
<p>After day of topcamp fettling we set off to Balcony to rig the entrance shaft, after
|
||||||
initially intending to do only a carry. We reflected en-route, so as to be able to find out way
|
initially intending to do only a carry. We reflected en-route, so as to be able to find out way
|
||||||
back, arriving ~ 8pm. I rigged the first few rebelays, not really understanding what the bolts
|
back, arriving ~ 8pm. I rigged the first few rebelays, not really understanding what the bolts
|
||||||
wanted me to do. Elliott took over & we eventually got to the bottom with some bodge. Due to a
|
wanted me to do. Elliott took over & we eventually got to the bottom with some bodge. Due to a
|
||||||
lack of inspiration we headed back out & back to top camp, getting there ~midnight.</p>
|
lack of inspiration we headed back out & back to top camp, getting there ~midnight.</p>
|
||||||
|
|
||||||
<div class="timeug">T/U: ~3 hours</div>
|
<div class="timeug">T/U: ~3 hours</div>
|
||||||
|
|
||||||
@ -47,11 +47,11 @@ lack of inspiration we headed back out & back to top camp, getting there ~midnig
|
|||||||
<div class="triptitle"></div>
|
<div class="triptitle"></div>
|
||||||
|
|
||||||
<p>Feeling Keen we set off to rig Tunnocks entrance shaft, optimistically we took ropes /hangers
|
<p>Feeling Keen we set off to rig Tunnocks entrance shaft, optimistically we took ropes /hangers
|
||||||
to get to the bottom of ducks on ice. Burdened by 2 bags & equipped with me skyhook I set off;
|
to get to the bottom of ducks on ice. Burdened by 2 bags & equipped with me skyhook I set off;
|
||||||
several exciting swings & wall destruction (by skyhook) complete saw Ash & I in sight of the
|
several exciting swings & wall destruction (by skyhook) complete saw Ash & I in sight of the
|
||||||
bottom ice/snow plug; after a final swing & lunge to gain a skyhook placement I put a bolt in &
|
bottom ice/snow plug; after a final swing & lunge to gain a skyhook placement I put a bolt in &
|
||||||
looked up to see the other hilti for a u-hang out of reach. At this point I got fed up of silly
|
looked up to see the other hilti for a u-hang out of reach. At this point I got fed up of silly
|
||||||
acrobatics & we went home despite the end of the entrance being in sight.</p>
|
acrobatics & we went home despite the end of the entrance being in sight.</p>
|
||||||
|
|
||||||
<div class="timeug">T/U: 4?? hours</div>
|
<div class="timeug">T/U: 4?? hours</div>
|
||||||
|
|
||||||
@ -74,16 +74,16 @@ cord and a few other things).</p>
|
|||||||
|
|
||||||
|
|
||||||
<div class="tripdate" id="t2016-06-24a">2016-06-24</div>
|
<div class="tripdate" id="t2016-06-24a">2016-06-24</div>
|
||||||
<div class="trippeople"><u>Nat</u> & Elliot</div>
|
<div class="trippeople"><u>Nat</u> & Elliot</div>
|
||||||
<div class="triptitle">Balcony rigging - guide (start of 2016)</div>
|
<div class="triptitle">Balcony rigging - guide (start of 2016)</div>
|
||||||
|
|
||||||
<p>After a disgustingly warm carry up the hill with Anthony, Ash & Elliott, Elliott & I decided
|
<p>After a disgustingly warm carry up the hill with Anthony, Ash & Elliott, Elliott & I decided
|
||||||
we still wanted to go caving. We headed over to Balcony with 100m of 11mm snake rope, bolting &
|
we still wanted to go caving. We headed over to Balcony with 100m of 11mm snake rope, bolting &
|
||||||
surveying kit. Derigging the far too thin, previous rope we set about swinging into windows on
|
surveying kit. Derigging the far too thin, previous rope we set about swinging into windows on
|
||||||
the 34m pitch, my only lead from 2014 that hadn't been snaffled. (for good reason after a loose
|
the 34m pitch, my only lead from 2014 that hadn't been snaffled. (for good reason after a loose
|
||||||
climb & another scary climb (that Elliot went up) it crapped out, giving the grand total of
|
climb & another scary climb (that Elliot went up) it crapped out, giving the grand total of
|
||||||
surveyed new passage of ~10m. (swingers) After re-rigging the entrance on speedy 11mm we went
|
surveyed new passage of ~10m. (swingers) After re-rigging the entrance on speedy 11mm we went
|
||||||
for a little bimble & found the natural highs had been derigged. See below for rigging guide.</p>
|
for a little bimble & found the natural highs had been derigged. See below for rigging guide.</p>
|
||||||
|
|
||||||
<p>100m + 20m</p>
|
<p>100m + 20m</p>
|
||||||
|
|
||||||
@ -110,7 +110,7 @@ for a little bimble & found the natural highs had been derigged. See below for r
|
|||||||
<div class="trippeople">Anthony, <u>Nat</u></div>
|
<div class="trippeople">Anthony, <u>Nat</u></div>
|
||||||
<div class="triptitle">Tunnocks - Procrastination</div>
|
<div class="triptitle">Tunnocks - Procrastination</div>
|
||||||
|
|
||||||
<p>Rigging trip down Tunnocks, Anthony continued rigging down string Theory whilst I sat &
|
<p>Rigging trip down Tunnocks, Anthony continued rigging down string Theory whilst I sat &
|
||||||
refrigerated. String Theory rigged we consolidated rigging Kit and Anthony continued rigging
|
refrigerated. String Theory rigged we consolidated rigging Kit and Anthony continued rigging
|
||||||
down procrastination. I continued to refrigerate. Rigging complete we headed out. 9 Krbas, 9
|
down procrastination. I continued to refrigerate. Rigging complete we headed out. 9 Krbas, 9
|
||||||
maillons, 9 hangers (N of Beast, magic glue (dev))</p>
|
maillons, 9 hangers (N of Beast, magic glue (dev))</p>
|
||||||
@ -151,15 +151,15 @@ new entrances.</p>
|
|||||||
|
|
||||||
<p>Set off to continue rigging down Tunnocks (aiming to carry 2 bags to camp). On the way the
|
<p>Set off to continue rigging down Tunnocks (aiming to carry 2 bags to camp). On the way the
|
||||||
one bolt wonder handline before usual suspects was converted (more or less) into a bonafide
|
one bolt wonder handline before usual suspects was converted (more or less) into a bonafide
|
||||||
traverse line. Picked up Krabs, hangers & maillons from bottom of string theory & carried on
|
traverse line. Picked up Krabs, hangers & maillons from bottom of string theory & carried on
|
||||||
down procrastination; Wookey rigged number of the beast & we carried on down to magic glue,
|
down procrastination; Wookey rigged number of the beast & we carried on down to magic glue,
|
||||||
putting deviations in along the way. Once at magic glue faff ensued with rope misbehaving &
|
putting deviations in along the way. Once at magic glue faff ensued with rope misbehaving &
|
||||||
getting tangled. Once I was at the bottom, wookey instaled a deviation; having previously
|
getting tangled. Once I was at the bottom, wookey instaled a deviation; having previously
|
||||||
dropped Krab/sling down the pitch: "It's a good job wer're not climbers or we'd have to retiure
|
dropped Krab/sling down the pitch: "It's a good job wer're not climbers or we'd have to retiure
|
||||||
that", on a spike, bags were left just below magic glue, with a long plod out.</p>
|
that", on a spike, bags were left just below magic glue, with a long plod out.</p>
|
||||||
|
|
||||||
<p>Stuff left: 2 bags of camping stuff, 1 drill, 2 drill bits, 1 battery, blow tube,
|
<p>Stuff left: 2 bags of camping stuff, 1 drill, 2 drill bits, 1 battery, blow tube,
|
||||||
hammer/setter & hiltis</br>
|
hammer/setter & hiltis</br>
|
||||||
<u>No drill tackle sack</u></br>
|
<u>No drill tackle sack</u></br>
|
||||||
8 maillions, 6 krabs, 4, hangers, 2 bits of tat</p>
|
8 maillions, 6 krabs, 4, hangers, 2 bits of tat</p>
|
||||||
|
|
||||||
@ -171,14 +171,14 @@ dropped Krab/sling down the pitch: "It's a good job wer're not climbers or we'd
|
|||||||
<div class="trippeople"><u>Sioned</u>, Andrew, Becka</div>
|
<div class="trippeople"><u>Sioned</u>, Andrew, Becka</div>
|
||||||
<div class="triptitle">Balkonhöhle</div>
|
<div class="triptitle">Balkonhöhle</div>
|
||||||
|
|
||||||
<p>Went for an explore with a few 30m lengths of rope. Was mine & Andrew's first trip down &
|
<p>Went for an explore with a few 30m lengths of rope. Was mine & Andrew's first trip down &
|
||||||
Becka hadn't been down since 2014. Andrew was initially considering dropping down one of the
|
Becka hadn't been down since 2014. Andrew was initially considering dropping down one of the
|
||||||
pitches at Natural High but George suggested a better option further on that turned out to be
|
pitches at Natural High but George suggested a better option further on that turned out to be
|
||||||
called consolidation Pitch. Rigging of a bolt on the traverse across a series of pitches down to
|
called consolidation Pitch. Rigging of a bolt on the traverse across a series of pitches down to
|
||||||
a ledge with a clear 4 second drop straight down with lots of water dripping. Due to lack of
|
a ledge with a clear 4 second drop straight down with lots of water dripping. Due to lack of
|
||||||
reop we traverses over to the opposite ledge to descend the pitch beyond that was dry. [unfilled
|
reop we traverses over to the opposite ledge to descend the pitch beyond that was dry. [unfilled
|
||||||
blank] m down with a couple of rebelays ended on a boulder slope with a smaler passage coming in
|
blank] m down with a couple of rebelays ended on a boulder slope with a smaler passage coming in
|
||||||
from the right & a squeeze over a 4m drop at the bottom but we had no rope left. </p>
|
from the right & a squeeze over a 4m drop at the bottom but we had no rope left. </p>
|
||||||
|
|
||||||
<div class="callout">22:00</div>
|
<div class="callout">22:00</div>
|
||||||
<div class="timeug">T/U: 6.5 hours</div>
|
<div class="timeug">T/U: 6.5 hours</div>
|
||||||
@ -224,17 +224,17 @@ rack for years. Aug/Any[?] it all went fine, and 76 was comfortably familiar, th
|
|||||||
<div class="tripdate" id="t2016-06-28b">2016-06-28</div>
|
<div class="tripdate" id="t2016-06-28b">2016-06-28</div>
|
||||||
<div class="trippeople">Becka, <u>Sioned</u>, Andrew</div>
|
<div class="trippeople">Becka, <u>Sioned</u>, Andrew</div>
|
||||||
<div class="triptitle">Balkon - Pitch of Bipedal</div>
|
<div class="triptitle">Balkon - Pitch of Bipedal</div>
|
||||||
<p>We went back to investigate the lead with some more short pieces of rope & 100m of
|
<p>We went back to investigate the lead with some more short pieces of rope & 100m of
|
||||||
9mm. Having received a 13m piece of rope that had been dropped at Natural High. We rerigged the
|
9mm. Having received a 13m piece of rope that had been dropped at Natural High. We rerigged the
|
||||||
initial drop & continued back to the bottom of the boulder slope. Squeezing round a piller we
|
initial drop & continued back to the bottom of the boulder slope. Squeezing round a piller we
|
||||||
descended into a wet chamber with some pretty & sharp rock formations. The passage continued
|
descended into a wet chamber with some pretty & sharp rock formations. The passage continued
|
||||||
round the corner & ended with a hole in the floor & a sloping aven coming in from the right,
|
round the corner & ended with a hole in the floor & a sloping aven coming in from the right,
|
||||||
where we found a survey station. This turned out to the where elliott ended up at the end of
|
where we found a survey station. This turned out to the where elliott ended up at the end of
|
||||||
last year having come in throught the passage coming in from the right at the top of the boulder
|
last year having come in throught the passage coming in from the right at the top of the boulder
|
||||||
slope and free climbed the squeezy bit? He had just run out of batteries for survey equipment &
|
slope and free climbed the squeezy bit? He had just run out of batteries for survey equipment &
|
||||||
not been able to return (hence the name - Batteries). We decided not to survey the incoming
|
not been able to return (hence the name - Batteries). We decided not to survey the incoming
|
||||||
passage & instead Becka went down the main 75m pitch to investigate and survey. There was
|
passage & instead Becka went down the main 75m pitch to investigate and survey. There was
|
||||||
nothing at the bottom & surveying turned out to be impossible as the disto we had that day was
|
nothing at the bottom & surveying turned out to be impossible as the disto we had that day was
|
||||||
only up to 50m (the one we used the day before was 100m) so we de-rigged and came out.</p>
|
only up to 50m (the one we used the day before was 100m) so we de-rigged and came out.</p>
|
||||||
|
|
||||||
<p><img src="logbk2.img" alt="rigging topo"></p>
|
<p><img src="logbk2.img" alt="rigging topo"></p>
|
||||||
@ -446,6 +446,12 @@ only up to 50m (the one we used the day before was 100m) so we de-rigged and cam
|
|||||||
<p>Callout book entry.</p>
|
<p>Callout book entry.</p>
|
||||||
<div class="callout">22:00</div>
|
<div class="callout">22:00</div>
|
||||||
|
|
||||||
|
<div class="tripdate" id="t2016-07-16d">2016-07-16</div>
|
||||||
|
<div class="trippeople">Luke, Fleur, Pete, Martin, Elaine</div>
|
||||||
|
<div class="triptitle">Tunnocks - Champagne on Ice derig</div>
|
||||||
|
<p>Callout book entry.</p>
|
||||||
|
<div class="callout">22:00</div>
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
</html>
|
</html>
|
||||||
|
Loading…
x
Reference in New Issue
Block a user