diff --git a/handbook/rig/ropecare.html b/handbook/rig/ropecare.html
index 53e0e6f86..ad193b933 100644
--- a/handbook/rig/ropecare.html
+++ b/handbook/rig/ropecare.html
@@ -85,11 +85,11 @@ One final issue is that we should not see this idea as an excuse for never doing
Strategy which will be employed for each section varies:
-o Leave everything in place (rope in good condition, low water risk)
-o Derig up to pitch head, leave all knots in place for future re-rig (rope in good condition, but water could be a risk)
-o Derig up to pitch-head, undo all knots and prepare for re-rig with rope upside down or otherwise displaced (minor rope damage which can be dealt with by ensuring that repeat wear next year is not in exactly the same place)
-o Derig and remove rope, but leave metalwork in place (rope in poor condition but return intended)
-o Derig all equipment (project end)
+ - Leave everything in place (rope in good condition, low water risk)
+
- Derig up to pitch head, leave all knots in place for future re-rig (rope in good condition, but water could be a risk)
+
- Derig up to pitch-head, undo all knots and prepare for re-rig with rope upside down or otherwise displaced (minor rope damage which can be dealt with by ensuring that repeat wear next year is not in exactly the same place)
+
- Derig and remove rope, but leave metalwork in place (rope in poor condition but return intended)
+
- Derig all equipment (project end)
Perform an on-rope inspection ON THE WAY DOWN to check that planned strategies are realistic.
@@ -117,22 +117,5 @@ o Derig all equipment (project end)
-
-
-