mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2025-12-08 23:04:35 +00:00
Fixed up incorrect html ellipsis character codes in logbooks (2000, 2013, 2017)
This commit is contained in:
@@ -992,7 +992,7 @@ going in. Trundled through Scarface, Brownie's Cunt & Rocky Horror.
|
|||||||
Rigged pitch very badly & bodged our way down (SRT gear packed in bags
|
Rigged pitch very badly & bodged our way down (SRT gear packed in bags
|
||||||
for going through Stairway to Hell) Did this. Had to bail 2" out of
|
for going through Stairway to Hell) Did this. Had to bail 2" out of
|
||||||
puddle to get in, but the choke itself was OK - the more you do it the less
|
puddle to get in, but the choke itself was OK - the more you do it the less
|
||||||
likely to all fall in it seems&ellip;
|
likely to all fall in it seems…
|
||||||
|
|
||||||
<p>Climbed down into <span lang="de">Elin Algor</span> & went to look at
|
<p>Climbed down into <span lang="de">Elin Algor</span> & went to look at
|
||||||
pitch (1996-161-82C). 6m climb up (3-4m above the head-sized window) gives
|
pitch (1996-161-82C). 6m climb up (3-4m above the head-sized window) gives
|
||||||
|
|||||||
@@ -276,11 +276,11 @@ aprrox. 4m. Holly + Mike turned up with the drill + Holly bolted the
|
|||||||
pitch down which finished. They surveyed + headed out. Chris + I had
|
pitch down which finished. They surveyed + headed out. Chris + I had
|
||||||
surveyed the upper section then Chris shimmied up a climb then got the
|
surveyed the upper section then Chris shimmied up a climb then got the
|
||||||
drill when Holly had finished with it + rigged it them added a few
|
drill when Holly had finished with it + rigged it them added a few
|
||||||
bolts - strong draft coming from a small hole in the ceiling&ellipsis; draft
|
bolts - strong draft coming from a small hole in the ceiling… draft
|
||||||
good but passage dimensions not great. Chris then bolted a proper pitch
|
good but passage dimensions not great. Chris then bolted a proper pitch
|
||||||
to avoid the expo rig then headed up whilst Becka re-rigged with bolts
|
to avoid the expo rig then headed up whilst Becka re-rigged with bolts
|
||||||
the traveerese at the bottom of Procrastination. We got 11 holes out of
|
the traveerese at the bottom of Procrastination. We got 11 holes out of
|
||||||
one battery - surprisingly good&ellipsis; soft rock.</p>
|
one battery - surprisingly good… soft rock.</p>
|
||||||
|
|
||||||
<div class="timeug">T/U: Chris + Becka 11 hours, Holy + Mike 10 hours</div>
|
<div class="timeug">T/U: Chris + Becka 11 hours, Holy + Mike 10 hours</div>
|
||||||
|
|
||||||
|
|||||||
@@ -190,9 +190,9 @@ and Corin’s first trip underground whilst on expo. Ash took us down
|
|||||||
Balcony to Cathedral Chasm. He gave myself and Corin a lesson in surveying which
|
Balcony to Cathedral Chasm. He gave myself and Corin a lesson in surveying which
|
||||||
was great because he uses a PDA which - so I am told - is a very
|
was great because he uses a PDA which - so I am told - is a very
|
||||||
efficient surveying technique. We surveyed a total of 79metres!.. In about 2
|
efficient surveying technique. We surveyed a total of 79metres!.. In about 2
|
||||||
hours&ellipsis; By the end of this we'd found 1 C lead and 2 B leads, one of which
|
hours… By the end of this we'd found 1 C lead and 2 B leads, one of which
|
||||||
resulted in a grim mendip crawl that only Ash ended up doing and surveying.
|
resulted in a grim mendip crawl that only Ash ended up doing and surveying.
|
||||||
Michael thinks that the other B lead could connect to Tunnocks&ellipsis; Will see.</p>
|
Michael thinks that the other B lead could connect to Tunnocks… Will see.</p>
|
||||||
<p><i>NB: Ash’s alternative account</i></p>
|
<p><i>NB: Ash’s alternative account</i></p>
|
||||||
<p>After the rain
|
<p>After the rain
|
||||||
prevented caving the day before, the four of us set off to Balcony at
|
prevented caving the day before, the four of us set off to Balcony at
|
||||||
|
|||||||
Reference in New Issue
Block a user