diff --git a/cave_data/1626-2024-pb-01.html b/cave_data/1626-2024-pb-01.html index 8cbe87bc9..fb38ccbf8 100644 --- a/cave_data/1626-2024-pb-01.html +++ b/cave_data/1626-2024-pb-01.html @@ -38,7 +38,7 @@ the form documented at
The entrance was rigged with a pulse in a block on the floor and a Y hang from 2 pulses on either side of the opening. The shaft turns out to be about 15 meters deep and about 2 meters in diameter.
The floor is rocky with no way on, unless you are a Mendip caver. No need to return until every other lead on the plateau is complete.
Drawn-up plan and elevation
Drawn-up plan and elevation