diff --git a/years/2025/logbook.html b/years/2025/logbook.html index 595c1a2c0..6b9737651 100755 --- a/years/2025/logbook.html +++ b/years/2025/logbook.html @@ -1043,7 +1043,7 @@ Lift back down with exiting KH team.
We set off after a bit of faff, which wasn’t helped by the large number of people staying at top camp (everyone from basecamp bar a couple!). We suited up at the entrance, raced to the bottom of the two entrance pitches and headed to the horizontal passage leading on from Vertigo View. The plan of action was to split into 2 groups, Me, Tom B and Ella would survey the horizontal section whilst Ned bolted a traverse line to investigate a window in the far wall of the pitch which lead off the same horizontal section. We sprang into action, and like clockwork steady progress was made, shouting commands at each other like some sort of military drill,