mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2024-12-23 00:42:22 +00:00
Logbook edited 2014-08-07b
This commit is contained in:
parent
c6b6aed9af
commit
942b798484
@ -637,9 +637,14 @@ At this point, Rob proclaimed "I bet you £500 that we're in Blown Out." On
|
||||
|
||||
<div class="tripdate" id="2014-08-07b">2014-08-07</div>
|
||||
<div class="trippeople">Pete, Fleur, <u>Chris</u>, </div>
|
||||
<div class="triptitle">Balcon Höhle - A Room With a View</div>
|
||||
<br /><br />Fleur polished up the entrance pitches after the previous day of gardening. We followed the howling gale to reach the 40m pitch reached by Mike & Andrea on 05/08. Pete rigged over the top, "Natural Highs",with his rigging butler providing an ever-increasing rope length (10m replaced by 20m replaced by 40m). After traversing over 3 pitches we were on terra firma, in substantial passage with leads all around & the sound of drilling above. I shinned up the RH wall into large phreas going up & downstream, which I ambled along upstream until I was able to wave cheerily at Noel & Holly who were dangling on the far side, wondering how to reach the balcony I was beaming out from. We settled for a DistoX "handshake" across the gulf.
|
||||
<div class="triptitle">Balkonhöhle - A Room With a View</div>
|
||||
<br /><br />Fleur polished up the entrance pitches after the previous day of gardening. We followed the howling gale to reach the 40m pitch reached by Mike & Andrea on 05/08. Pete rigged over the top, "Natural Highs",with his rigging butler providing an ever-increasing rope length (10m replaced by 20m replaced by 40m).
|
||||
|
||||
<p>
|
||||
After traversing over 3 pitches we were on terra firma, in substantial passage with leads all around & the sound of drilling above. I shinned up the RH wall into large phreas going up & downstream, which I ambled along upstream until I was able to wave cheerily at Noel & Holly who were dangling on the far side, wondering how to reach the balcony I was beaming out from. We settled for a DistoX "handshake" across the gulf.
|
||||
|
||||
<br /><br />Fleur & Pete surveyed the 'Leeds Bypass' while I put some "Unnatural Highs" bolts in (Pete's battery had died hence excessive use of natural protection). Then we surveyed on down-sip along the windy phreas. It just got bigger and bigger - while Pete & Fleur followed the biggest windiest passage I took the frill to a draft phreatic pitch off to the left, left 15m down with a 'Y' hang waiting for someone to come along with another 30m or so of rope to descend it - 'Gardeners Question Time' due to the usual issue of just how much gardening to do. Fleur & Pete returned having reached a traverse that needed rigging. So we took the drill along to the end, passing a dried up stream trench in the floor. The remaining 10m rope took us 2/3 along the traverse in 3 bolts + 1 natural, so a splendid lead for someone to continue into the phreas beyond. 230m in book.
|
||||
|
||||
<br /><br />We had a bit of a queue on the ent pitches, meeting up with Mike & Elaine & then Holly & Noel, so we all compared our finds - all going, so smiles all round.
|
||||
<div class="timeug">T/U: 10.0 hours</div>
|
||||
<div class="editentry"><br /><a href="/logbookedit/2014-08-07b">Edit this entry</a><br /></div>
|
||||
|
Loading…
Reference in New Issue
Block a user