Add id="links" to pages that missed it. Part III: handling special characters that were missread in the automatic replacement

This commit is contained in:
Aiora Zabala
2011-06-01 11:07:53 +02:00
parent 041d0c1eb9
commit 89825727c1
9 changed files with 22 additions and 22 deletions

View File

@@ -35,7 +35,7 @@ junction with the rest of the system at Junction chamber was surveyed only by
measuring pitch lengths and so only grade two is claimed.
<p>A surface traverse from the two entrances of Stellerwegh&ouml;hle to the
entrance to Schnellzughöhle, and extending to other entrances in the area was
entrance to Schnellzugh&#246;hle, and extending to other entrances in the area was
carried out to grade five, and is in close agreement with data from previous
years. The survey from Schnellzugh&ouml;hle to the Confluence was all to
grade five, and agrees with the surveys done in 1980-81 to lower grade. From
@@ -75,7 +75,7 @@ made in 1980 from memory with measured pitch lengths.
<!-- A.E.R.Waddington, February 1983. -->
<hr />
<!-- LINKS -->
<ul>
<ul id="links">
<li><a href="../1983/41svy.htm">The truth</a> about the 1982 survey
(from CU 1984)</li>
<li>1982 Expedition info: