From 7fe046361793294dcffa364d7bf2aa2ec2f260cb Mon Sep 17 00:00:00 2001 From: Expo on server Date: Sun, 3 Dec 2023 16:45:46 +0000 Subject: [PATCH] Logbook edited 2013-08-03a --- years/2013/logbook.html | 72 ++++++++++++++++++++--------------------- 1 file changed, 36 insertions(+), 36 deletions(-) diff --git a/years/2013/logbook.html b/years/2013/logbook.html index 7886b8478..d8ad002b0 100755 --- a/years/2013/logbook.html +++ b/years/2013/logbook.html @@ -14,7 +14,7 @@ maintain half a dozen parser functions. Sorry about all the crap that surrounds the image tags which has been imported along with the content when UK Caving blogs have been parsed. -Exported on 2023-11-23 17:11 using either the control panel webpage or when editing a logbook entry online +Exported on 2023-12-03 16:12 using either the control panel webpage or when editing a logbook entry online See troggle/code/views/other.py and core.models/logbooks.py writelogbook(year, filename) --> @@ -221,7 +221,7 @@ went.
2013-07-28
-
Becka, Chris D, Mike,
+
Becka, Mike, Chris D,
258 Rigging


Becka rigged Caramel Catharsis then showed Chris and Mike the top of String Theory which Chris made a start om rigging whilst Becka headed @@ -336,7 +336,7 @@ Determination is required for further trips and so it's name is born ->
2013-07-31
-
Chris D, Becka, Holly, Mike,
+
Chris D, Holly, Becka, Mike,
258 Rigging and AT LAST some pushing


Chris + Becka headed in early. becka finished rigging Procrastination which was dead easy to rig, all the bolts first where @@ -390,7 +390,7 @@ this is the deepest part of Tunnocks at -397! Woo hoo! [smiley]
2013-08-01
OllyB, Jenny,
-
107 - Too Bold for This Spit
+
Too Bold for This Spit


Yet again back into sleepless and heading ever closer to KH. Took more rope, and the last of our hangers and the last drill battery to the pushing front. Rigged 2 short pitches with one longer rope and headed @@ -434,7 +434,7 @@ Julian was patiently waiting to take us down the hill.
2013-08-01
-
Becka, Mike, Anthony,
+
Becka, Anthony, Mike,
258 Upper level Tunnock - Oompah, Just for a Laugh, Naughty, Naughty and 08-19 Alead


Becka + Mike down to Oompah + rigged the pitch on the left, down ~15m + looked blind but then Mike spotted a short climb up to @@ -454,7 +454,7 @@ final chamber.
2013-08-02
-
Matt, Mike, Becka,
+
Matt, Becka, Mike,
2013-BL-01 - Prospecting N + W of Tunnocks


Mike's last day + it was hot. Walked to Tunnocks entrance then hacked N then W in a big loop with Mike + Martin's GPS. Found a @@ -467,8 +467,8 @@ walking.
2013-08-02
-
Holly, Chris D, Anthony,
-
Tunnocks - 258 Pushing Determination
+
Holly, Anthony, Chris D,
+
258 Pushing Determination


Lured by tales of an ongoing spacious pitch series, I found myself heading off to Holly’s favourite lead at the far north of Tunnocks. After the usual tedium of the entrance series, a long sweaty uphill stromp through Flying High etc, we found ourselves staring at the start @@ -526,8 +526,8 @@ bunde we made it back to top camp just before our callout.
2013-08-03
-
Matt, Chris D, Holly, Becka,
-
2012-ns-01 - Ants In Pants
+
Chris D, Holly, Matt, Becka,
+
2013-03 - Ants In Pants


After a hot, heavy carry in the morning I rehydrated than headed off to 2012-NS-01 and surrounding holes with Chris + Matt. Chris watched Matt descend the furthest of four holes (#1) which led to a window into hole #2.
@@ -569,12 +569,12 @@ journey.
2013-08-04
-
Becka, Matt, Chris D,
-
Tunnocks - Procrastination – bolting the climb ‘Bring on the Clowns’
+
Chris D, Matt, Becka,
+
Tunnocks – Procrastination – bolting the climb ‘Bring on the Clowns’


Becka started bolting across the traverse from 31/7 to reach aven, then Chris took over while Matt froze in the gale. After some time I reached the top:
Elevation and riging topo for Bring on the Clowns +src="logbkimg03.png">

Stepping across the top to the passage at the top of the aven, initially all I could see was a body sized tube at the top of another @@ -627,8 +627,8 @@ some new marks.
2013-08-05
-
Becka, Matt, Cameron, Holly,
-
2013-03 - Antsinpantsschacht
+
Holly, Matt, Becka, Cameron,
+
Antsinpantsschacht


In the hunt for a new entrance to Tunnocks we headed to the area of plateau above the ‘snow + leaves’ bit of Tunnocks (near Starfish Junction). A days prospecting 2 days before had identified a number of holes in the area of which Matt had already dropped a couple. Of @@ -717,8 +717,8 @@ further tomorrow.
2013-08-06
-
Anthony, Chris D,
-
Tunnocks - The Number of the Beast
+
Chris D, Anthony,
+
258 Tunnocks – The Number of the Beast


Dour + Chris took in over 100m rope to see what they could do with the pitch at the top of Bring on the Clowns. On the way in Chris put in a bolt to shift the Procrastination part II Y-hang one bolt over in an attempt to hand the rope out to dry after Becka’s exit on @@ -768,7 +768,7 @@ to the top of String Theory, out at 6am.
2013-08-06
-
Holly, Becka, Fleur,
+
Holly, Fleur, Becka,
Tunnocks - Determination


The last trip down Determination saw us dropping two more pitches deeper down in this part of the system. No major comments for the journey in except that I’ll quote Becka who @@ -850,7 +850,7 @@ out and slowly caved back to outside.
2013-08-06
-
Chris Burnley, Matt, Cameron, Pete,
+
Chris Burnley, Cameron, Matt, Pete,
Prospecting – Snow Pole and Dead Tree area to w-NW of Tunnocks


We headed back to area looked at a few days before by Matt + Becka. Refining the bunda-avoidance on route from Tunnocks-entrance @@ -890,7 +890,7 @@ then a further ~20-25m(??) to bottom. Hard to judge but 60m rope needed.
2013-08-07
Matt, Cameron, Becka,
-
Tunnocks - Tour of upper level Tunnocks + gear haul
+
Tour of upper level Tunnocks + gear haul


Fetched the gear we’d dumped yesterday just beyond the boulder choke + tottered down Flying High to dump them at Starfish Junction. Left a tacklesack arrow for the others then up to the snow + leaves aven. I climbed up as far as the window in the main aven but way @@ -932,7 +932,7 @@ the plateau that can swallow their sheep, -
2013-08-07
-
Holly, Fleur, Pete, Chris B,
+
Holly, Pete, Fleur, Chris B,
Tunnocks


A gear shifting, route familiarisation + lead identification trip. @@ -967,8 +967,8 @@ wider.
2013-08-10
-
Olly, Stuart, Jenny,
-
107 - Lucky and stupid
+
Jenny, Stuart, Olly,
+
107


It thunderstormed all night and was still raining in the morning so we altered our planned trip to land of confusion and decided to look at leads in Ropeless and Sleepless. The drill was at the pushing front so we were a bit limited. Headed to the end of @@ -1000,7 +1000,7 @@ Stuart to survey the roof tube while I caved out feeling very lucky and very stu
2013-08-11
-
Fleur, Pete, Cameron,
+
Fleur, Cameron, Pete,
Tunnocks – Hedonism Highway/ Rocky Road Area


We went to check out the draughting pitch (08-40A) off Hedonism Highway/ Rocky Road. Becka had recommended this one and it was a good call. A dodgy natural thread and bolt @@ -1018,7 +1018,7 @@ down further or 2) go up the inlet rift. We did the latter but ran out of rope.
2013-08-11
Olly, Stuart, Jenny,
-
2012-SW-01, 2012-SW-02 - Surface Prospecting
+
Surface Prospecting


My hip and neck were quite sore after a yesterday’s fall and Olly was also feeling tired, so we decided on a surface day. We started at laser5 and headed ~ parallel to the 204 path but west of it. @@ -1038,7 +1038,7 @@ too small. Again Stuart drew a survey while we photoed + GPS-ed.
2013-08-11
-
Matt, Alex, Chris D,
+
Matt, Chris D, Alex,
Surface Prospecting - Drafty hole area


Callout book entry only.
T/U: 0.0 hours
@@ -1047,7 +1047,7 @@ too small. Again Stuart drew a survey while we photoed + GPS-ed.
2013-08-12
-
Fleur, Pete, Cameron,
+
Fleur, Cameron, Pete,
Hedonism Highway/ Rocky Road area


Returned 12th Aug, same team: @@ -1070,7 +1070,7 @@ src="/years/2013/logbkimg12.png">
2013-08-12
Olly, Stuart, Jenny,
-
107 - China
+
107 China


Set off to Land of Confusion hoping to find ourselves in KH by the end of the trip. Got to Land of Confusion fairly efficiently, Olly set off to rig the pitch at the end while Stuart and I surveyed leads on the west of the passage. The first went along a little rift @@ -1117,8 +1117,8 @@ of Stuart’s previous longest trip!
2013-08-13
-
Tom Clayton, Fleur,
-
Tunnocks - West Side Story – "Clayton’s Cock-up"
+
Fleur, Tom Clayton,
+
Tunnocks, West Side Story – "Clayton’s Cock-up"


After a day of research following the expo dinner I had spotted a QMA at the end of West Side Story at String Theory/Fellows level. The survey notes reported an undescended p20 with a passage visible beyond. My plan was to take Tom down there and get him bolting. @@ -1169,8 +1169,8 @@ appears to be at least one poor surface survey in this region.
2013-08-14
-
Tom, Pete, Fleur,
-
Tunnocks - West Side Story – Bacm Bccm Afridi
+
Fleur, Pete, Tom,
+
Tunnocks, West Side Story – Bacm Bccm Afridi


This time hiltis were stashed in multiple locations and Clayton’s Cock-up was conquered. However the other side just led to a brief rocky bridge and more holes in a massive drafty hading rift. So instead we went down the first hole (Thus avoiding the nasty @@ -1209,7 +1209,7 @@ through Pushing the Envelope. Too one bag out each to the entrance chamber.
2013-08-14
-
Tom Clayton, Cameron Bullen, Matt Watson,
+
Tom Clayton, Matt Watson, Cameron Bullen,
Tunnocks, Downgrade Window


Went to check out what was described as an ‘acrobatic traverse’ by Pete at the end of Downgrade just off Hedonism Highway. The traverse was actually a large gap to a window the @@ -1227,8 +1227,8 @@ src="/years/2013/logbkimg16.png">

2013-08-15
-
Olly, Stuart, Jenny,
-
107 - final derig – Wonderland survey
+
Jenny, Stuart, Olly,
+
107 final derig – Wonderland survey


Stuart rejoined us for the final derig. Got the gear to ropeless junction and had a quick side trip to show Stuart Wonderland and look at the roof tube there. Frustratingly after getting all the gear in, the fully charged, unused drill battery did half a hole. I @@ -1244,7 +1244,7 @@ src="/years/2013/logbkimg15.png">

2013-08-15
-
Tom Clayton, Alex Crow, Matt Watson,
+
Tom Clayton, Matt Watson, Alex Crow,
Tunnocks, Downgraded window


This trip had two objectives, to explore the passage found the day before and to investigate the area of the cave under ‘Ants in your Pants’ surface shaft. A few places