diff --git a/cave_data/1623-2023-ASH-08.html b/cave_data/1623-2023-ASH-08.html index 4d61f599a..c206f3d8b 100644 --- a/cave_data/1623-2023-ASH-08.html +++ b/cave_data/1623-2023-ASH-08.html @@ -1,5 +1,5 @@ - +
-This file is generated by troggle on Aug. 2, 2023, 9:03 p.m. UTC using the form documented at +This file is generated by troggle on Aug. 2, 2023, 9:04 p.m. UTC using the form documented at the form documented at handbook/survey/caveentry.htmlAn 8m diameter entrance bowl has a crawl off the side into standing height chamber. Another crawl downslope leads to a second chamber with two avens, one of which is a sky light, connecting tightly to the surface.
