[svn r8264] updating

This commit is contained in:
edvin 2009-03-04 12:42:54 +01:00
parent 8f3f0a9014
commit 624daa131f
3 changed files with 13 additions and 13 deletions

View File

@ -36,15 +36,9 @@ href="3rdparty/sherry/srtrig.htm">local copy</a> of this guide.--></p>
<p>It is intended to add rigging guides to the descriptions for each pitch
series in CUCC's major caves - these will be graphical, and based on sketch
rigging guides currently in various survey and log books. Look for the symbol</p>
<p style="text-align: center">Rigging Guide <img src="../../icons/rigit.png"
class="icon" alt="Rigging guide icon" /></p>
<p>in the descriptions, for a link. This is the next major long-term upgrade
for the website, and has hardly started yet. It is hoped to do the main routes
in <span lang="de">Kaninchenh&ouml;hle</span> which will be needed for the 1999
expedition by early summer. The main routes down from the top entrances will
follow as effort permits. To help this along, it is essential that rigging
rigging guides currently in various survey and log books. Look for the
rigging guide link in the descriptions. To help people add rigging
guides to the cave descriptions, it is essential that rigging
guides are drawn for any new rigging or rerigging each year. Ideally, this
should be done by the person who did the rigging the next time he is at Base
Camp (or even in the Top Camp log). It's also essential for future years to

View File

@ -123,7 +123,12 @@ href="pubs.htm">Publications index</a>, as are the log book accounts.</p>
<li><a href="kitlist.html">Kit list</a></li>
<li><a href="links.htm">Links</a> to other relevant websites</li>
<li><a href="tollrd.htm">Loser Panoramastra&szlig;e</a></li>
<li>Mailing lists: <a href="http://cucc.survex.com/cgi-bin/mailman/listinfo/expo">Expo members</a> and <a href="http://cucc.survex.com/cgi-bin/mailman/listinfo/expo-committee">Expo committee</a> (note that these will be changing in May 2008). </li>
<li>Mailing lists: <a
href="http://cucc.survex.com/cgi-bin/mailman/listinfo/expo">Expo
members</a> and <a
href="http://cucc.survex.com/cgi-bin/mailman/listinfo/expo-committee">Expo
committee</a> (note that the main list used to organise each
individual expo can now be found <a href="http://www.srcf.ucam.org/caving/wiki/Email_lists">here</a>). </li>
<li><a href="folk/index.htm">Members</a> 1976-present, with links to mugshots</li>
<li><a href="years/2009/mission.html">Mission Statement</a>: Latest set of objectives</li>
<li><a href="others/index.htm">Other groups</a> who have worked in the area.</li>

View File

@ -167,9 +167,10 @@ Water was obtained from snow at 231, collecting drips in 231 and a funnel
inserted in a grike on the roof of the stone bridge. Two butts were used for
water storage.</p>
<p>This camp was the main high camp in 2002 and the only one in 2003; it has
<p>This has been the main high camp since 2002; it has
been extensively reterraced to increase its capacity (as of 2003 it could sleep
12), and the water collection methods refined, to give an exceedingly
12), the water collection methods refined, and a cooking area created,
to give an exceedingly
comfortable bivvy site.</p>
<div class="centre"><a href="smkridge/204/bivvy.html">
@ -178,7 +179,7 @@ alt="204 bivvy" /></a></div>
<h3>76 bivvy</h3>
<p>In 2004, the 76 (<a href="plateau/76/76.htm">Eislufth&ouml;hle</a>)
<p>In 2004-2007, the 76 (<a href="plateau/76/76.htm">Eislufth&ouml;hle</a>)
reexploration project necessitated a camp close to the 76 entrance. A bivouac
was established in a convenient rock shelter nearby.</p>