From 5e8c902772a1012109cc4ee10a1098b3f5f1f690 Mon Sep 17 00:00:00 2001 From: Wookey Date: Wed, 25 Mar 2015 03:13:03 +0000 Subject: [PATCH] make 2011-01 slug and filenames match up --- .../{1623-2011-1.html => 1623-2011-01.html} | 78 +++++++++---------- noinfo/entrance_data/1623-2011-01.html | 2 +- 2 files changed, 40 insertions(+), 40 deletions(-) rename noinfo/cave_data/{1623-2011-1.html => 1623-2011-01.html} (97%) diff --git a/noinfo/cave_data/1623-2011-1.html b/noinfo/cave_data/1623-2011-01.html similarity index 97% rename from noinfo/cave_data/1623-2011-1.html rename to noinfo/cave_data/1623-2011-01.html index cca367afa..9348b65f7 100644 --- a/noinfo/cave_data/1623-2011-1.html +++ b/noinfo/cave_data/1623-2011-01.html @@ -1,26 +1,26 @@ - - - - - - - - -False -2011-1 -Kugelzweitehöhle -1623 -2d -3S - -2011-01 BS30 - - - 1623-2011-1 - - - -UBSS 1992, CUCC 2013 + + + + + + + + +False +2011-1 +Kugelzweitehöhle +1623 +2d +3S + +2011-01 BS30 + + + 2011-1 + + + +UBSS 1992, CUCC 2013

WARNING In heavy weather the main pitch becomes very dangerous, with cobbles being washed down, as well as water coming from everywhere, especially the rift.

Also known as Bullet Second Höhle

@@ -37,19 +37,19 @@

Shortly after the deviation the pitch is rebelayed to a free hanging rebelay before opening out into a large chamber, with the floor a further 35m below

-

The chamber has a bolder floor and is 30m long, 15m wide and about 20m tall. A passage continues from the top of the chamber near where the rope drops in. This passage continues upwards, with a moderately unstable boulder floor. A further small passage heads of the bottom of the chamber which could be a digging project. There may be a passage going of the far end of the chamber near the ceiling. -It is estimated that 60m + 90m rope should do. -UBSS Totes Gebirge Expedition 1992 - -not in kataster - - - - - -caves/2011-01/2011-01.svx - -smkridge/2011-01/2011-01.html - - - +

The chamber has a bolder floor and is 30m long, 15m wide and about 20m tall. A passage continues from the top of the chamber near where the rope drops in. This passage continues upwards, with a moderately unstable boulder floor. A further small passage heads of the bottom of the chamber which could be a digging project. There may be a passage going of the far end of the chamber near the ceiling. +It is estimated that 60m + 90m rope should do. +UBSS Totes Gebirge Expedition 1992 + +not in kataster + + + + + +caves/2011-01/2011-01.svx + +smkridge/2011-01/2011-01.html + + + diff --git a/noinfo/entrance_data/1623-2011-01.html b/noinfo/entrance_data/1623-2011-01.html index ae3490e31..c69101c58 100644 --- a/noinfo/entrance_data/1623-2011-01.html +++ b/noinfo/entrance_data/1623-2011-01.html @@ -7,7 +7,7 @@ False -1623-2011-01 +2011-01 CUCC 2011; Emma, Gareth, Neil, Andy