From 530a62090f2dcd99afad03ea75dbb306ea293e31 Mon Sep 17 00:00:00 2001 From: Philip Sargent Date: Wed, 5 Feb 2025 02:05:36 +0000 Subject: [PATCH] orphan photo GPS located, and mistakes found --- cave_data/1626-2023-BL-08.html | 57 ++++----- years/2023/logbook.html | 210 +++++++++++++++++---------------- 2 files changed, 130 insertions(+), 137 deletions(-) diff --git a/cave_data/1626-2023-BL-08.html b/cave_data/1626-2023-BL-08.html index 088e6288f..6f40a11ac 100644 --- a/cave_data/1626-2023-BL-08.html +++ b/cave_data/1626-2023-BL-08.html @@ -1,61 +1,48 @@ - + + - -This file is generated by troggle on July 2, 2024, 11:48 a.m. UTC using the form documented at +This file is generated by troggle using the form documented at the form documented at handbook/survey/caveentry.html
-False - - -1626 -+ - -2023-BL-08 + +1626 ++ + +2023-BL-08 - 1626-2023-BL-08 - + 1626-2023-BL-08 + -Becka Lawson, Sarah Parker, Adam Aldridge - -A triangular entrance 4m wide by 4m high with snow inside, continues horizontal for 10m to far wall - -No wallet found of relevance. No logbook entry either. - +Becka Lawson, Sarah Parker, Adam Aldridge + +A triangular entrance 4m wide by 4m high with snow inside, continues horizontal for 10m to far wall + +Wallet 2023#47
logbook 2023-07-19f
+ - - - + +
(photo of Sarah matched by EXIF GPS data from Becka's photo on expofiles. The other two photos actually seem to be of soemwhere else entirely: BL-09 - pending checking.) + + - +
diff --git a/years/2023/logbook.html b/years/2023/logbook.html index 0803ebc58..cc438782b 100644 --- a/years/2023/logbook.html +++ b/years/2023/logbook.html @@ -9,10 +9,14 @@ @@ -178,7 +182,7 @@ Pic: Janis Huns attaching stuff to the rope for hauling up.

2023-07-03
-
Philip Sargent,Martin Green
+
Philip Sargent, Martin Green
basecamp - nerding
Philip arrived by train at lunchtime. Joined Martin for serious nerding to get WiFi internet working in potato hut. @@ -190,7 +194,7 @@ serious nerding to get WiFi internet working in potato hut.
2023-07-03
-
Honorata Bogusz,Jana Podbelsek,Mike Butcher,Radost Waszkiewicz,Will Kay
+
Honorata Bogusz, Jana Podbelsek, Mike Butcher, Radost Waszkiewicz, Will Kay
plateau - second water collection tarp


Me, Radost, Mike, Jana and Will went to top camp to set up main tarp and the second water collection tarp (which was a success). @@ -199,7 +203,7 @@ main tarp and the second water collection tarp (which was a success).
2023-07-03
-
Harry Kettle,Charlotte Payne,Christian Kuhlmann,Emma Caspers,Janis Huns
+
Harry Kettle, Charlotte Payne, Christian Kuhlmann, Emma Caspers, Janis Huns
Balkon - Rescuing Balcony ropes


A crack team of expo's hardest cavers was assembled to take a rope out of balcony that was left there last year.

@@ -214,7 +218,7 @@ at about 5pm. Charlotte and Harry were both very grumpy walking back with very h
2023-07-03
-
Amelia Oliver,Emily Mabbett,Jonty Pine
+
Amelia Oliver, Emily Mabbett, Jonty Pine
Fishface - Digging the snow out of Fishface entrance


After a carrying day on the 2nd, we suspected ff would be snowed in. A faff morning of acquiring shovel. We got to ff with shovels, discovering it did need digging. Jonty got particularly into this, producing quit the snow trench. @@ -257,7 +261,7 @@ non-working internal wifi on netbook causing config problems even though it was
2023-07-04
-
Wassil Janssen,Amelia Oliver,Ashley Gregg,Merryn Matthews,Philip Balister,Sarah Parker
+
Wassil Janssen, Amelia Oliver, Ashley Gregg, Merryn Matthews, Philip Balister, Sarah Parker
topcamp - Carry and set-up


Ash, Merryn, Amelia in [com?] Philip B., Sarah and me @@ -269,7 +273,7 @@ came down the mountain.
2023-07-04
-
Harry Kettle,Alice Kirby,Charlotte Payne,Christian Kuhlmann,Will Kay
+
Harry Kettle, Alice Kirby, Charlotte Payne, Christian Kuhlmann, Will Kay
Surface - Rope carry to Homecoming + Trial walk from Garlic Cave to Car Park on painted track


After more faff from Chi, we set off about 10AM to carry gear and check out the route to Homecoming. Fishface to Homecoming was well cairned and fairly straightforward to follow.

Gear ledt at Homecoming entrance: @@ -307,7 +311,7 @@ Nice write up [re Honorata's 3-day update]. The rope there now is stuff we bough
2023-07-04
-
Buck Blake,Amelia Oliver,Ashley Gregg,Janis Huns,Joel Stobbart,Jonty Pine
+
Buck Blake, Amelia Oliver, Ashley Gregg, Janis Huns, Joel Stobbart, Jonty Pine
Fishface - Carrying rope to Fishface and failing to rig entrance
After the complicated operation of handling the solar panels out of the storage cave, the six of us packed kit, rope and a rescue bag and set off for Fishface. It was a hot but pleasant walk and the route was well marked. We arrivced and stashed bags under a nearby overhang then entered through the hole dug through the snow the previous day. @@ -326,7 +330,7 @@ left our caving kit under the small overhand near the entrance, then headed back
2023-07-05
-
Sarah Parker,Joel Stobbart,Lizzie Caisley,Maddie Kirby,Philip Balister
+
Sarah Parker, Joel Stobbart, Lizzie Caisley, Maddie Kirby, Philip Balister
Surface - Reflecting the Homecoming -> Fishface route, scoping out a Homecoming to col route


Joel, Lizzie and Philip fettled the tarp (where some water had pooled overnight) whilst I had a go at attaching the big Daren drum (filled with the solar panels and cables) to my rucksack, ready to carry from top camp to Garlic Cave. @@ -350,7 +354,7 @@ return.
2023-07-06
-
Janis Huns,Maddie Kirby
+
Janis Huns, Maddie Kirby
Plateau - scoping out a route from col to Garlic Cave


We set out to improve the direct route from the start of the plateau to Homecoming. The way down the wall after the second pole was suprisingly nice. This was followed by an easy flat section until the bunde and tiny cliffs obscured all the alternative paths we tried. Most of the way was already cairned, but we did find some nice fresh transitions through the bunde walls separating the easy-to-walk-on slabs. At Homecoming, we met Harry, Christian, Alice, Merryn getting ready to rig the cave. Then we visited Garlic cave - a massive above ground hole that leads to a bridge below which are the entrances to the cave itself. There was loads of snow - just as in every entrance - but there was a nice campable bit , plenty of water dripping. I sensed some garlic smell, remembering the story that this smell gave the name of the cave, but was still mysterious. Then Maddie realised we were surrounded by chives! Mystery solved.

On the way back we met Jono, Evelyn, and Oakem who were on the way to Garlic. At Homecoming, Honorata and Radost told us they had found 3 intriguing holes while prospecting. We found a baloon with a sweet note on it and read it to them. @@ -360,7 +364,7 @@ return.
2023-07-06
-
Joel Stobbart,Buck Blake,Jonty Pine
+
Joel Stobbart, Buck Blake, Jonty Pine
Fishface - Rigging and pitch-measuring trip


An ambitious day which slowly went increasingly wrong. The group departed base camp at a stunning 8.20AM, blitzed up the plateau and promtly became mired in several hours of faff which soon descended into more festering. The plan had been to rig the entrance series of Fishface down to the bottom of Blitzen Boulevard (4th pitch), from where we expected everything to be left rigged. However, confusion about rope lengths and metalwork and some impressively long grike trips meant that the two shallow pushing groups planning to explore from Blitzen and Liquid Luck caught us up at Top Camp. Uncle Mike was not amused. We swiftly bombed down to FF in 25 mins and started rigging. Joel was left to do everything as Jonty's light 'broke'.

The entrance pitch/spiral traverse thing was completed on a 40m rope. Tasteful noods (2nd pitch) didn't quite go on a 27m due to rerigging around the top rebelay to avoid rub, so Joel initially reached the bottom on a knot pass and Jonty rerigged to the bottom on a 32m. The traverse at the bottom of Tasteful Noods (2A) and pitch 3 both had rope left from last year but not rigged - some of the knots didn't line up and required rerigging but the lengths were fine. Pendulum pitch needs some more bolts at the bottom, possibly as a traverse, to make getting on and off the pitch less deathy. Uncle Mike rigged Blitzen for us as we got too scared, he insisted the step over the huge rift with no traverse was fine, so we left him to it. There may or may not be a bolt there now @@ -371,7 +375,7 @@ return.
2023-07-06
-
Emily Mabbett,Charlotte Payne,Emma Caspers,Lizzie Caisley,Mike Butcher
+
Emily Mabbett, Charlotte Payne, Emma Caspers, Lizzie Caisley, Mike Butcher
Fishface - Surveying around Benign Bubble Baby Bypass


After hiking up to plateau to arrive for midday, we discovered the advanced rigging party still above ground... In order to leave them time to start rigging the first 4 pitches of Fishface, an ungodly amount of faff began. We finally arrived at the cave at 3pm, thinking we'd left plenty of time for the riggers, we quickly changed and headed underground. Alas, our hopes were crushed as we came to the bottom of the first pitch to discover the other pushing party sat freezing their tits off at the top of the second pitch as the riggers rigged just below them. Needless to say, it took some time to descent to the bottom of Blitzen Boulevard with Mike taking over the rigging of the 4th pitch after a debate over placing another bolt at the pitch head. Once arrived at Benign Bubble Baby Bypass, we conducted a quick something time to refresh our surveying technique before splitting into 2 groups. Me and Mike went ahead through the tube leading on through the bottom of the climb heading towards the liquid luck ptch head to bolt the small pitch at the end of the traverse whilst the others began surveying from said turn off. As me and Mike arrived at the pitch head, I asked if I could begin my bolting lesson before a big scary hole. I was refused. Instead I was told to tie the rope around a small head sized bolder wedged in the rift, which were currently both stood on. I thought this was a silly idea but obliged. The actual bolting of the pitch went well (I think?), however comments about placing bolts higher were made which was somewhat impossible given my height. The final bolting and rigging became passable so I decended the large (4m...) hole.

@@ -385,7 +389,7 @@ return.
2023-07-06
-
Honorata Bogusz,Radost Waszkiewicz
+
Honorata Bogusz, Radost Waszkiewicz
Prospecting


We prospected between Fischgesicht and Heimkehr entrances. We found 5 caves, which I will refer to here using the temporary number and names entered in expo.survex.com. Small drain (2023-hbrw-01) and medium drain (2023-hbrw-02) were surveyed completely and they both strecth for about 20-30m, a small stream passing through each of them.

We also found 3 new caves which seem to continue but we couldn't survey them since they all begin with large pitches: @@ -399,7 +403,7 @@ return.
2023-07-06
-
Zac Woodford,Amelia Oliver,Ashley Gregg,Emma Caspers
+
Zac Woodford, Amelia Oliver, Ashley Gregg, Emma Caspers
Fishface - Surveying the top of liquid luck


Gave the rigging team ~3hr headstart but we still caught up with them at the bottom of first pitch. Emma and Zac then sat around while Ash and Mealy calibrated the disto. We were waiting so long that Uncle Mike's surveying group caught up. We waited in a a bothy for them to pass us before slowly, one-by-one, following on. We then caught up with them again at the top of Blitzen pitch and had to bothy again (after Mealy led us on too low in the rift).

At the beginning of BBBB (Benign Babble Baby Bypass) we talked with Mike's group pushing the other lead and descending some small pitches to push ours. We faffed around a while trying to find it, but when we did, we found it just looped back around to Mike's group's lead. We surveyed it anyway. @@ -409,7 +413,7 @@ return.
2023-07-06
-
Wassil Janssen,Alice Kirby,Christian Kuhlmann,Harry Kettle,Merryn Matthews
+
Wassil Janssen, Alice Kirby, Christian Kuhlmann, Harry Kettle, Merryn Matthews
Homecoming - Rig faff


This was a long day that started at Base Camp with the intent of rigging the entrance series of Homecoming cave. We set off only slightly later than the planned 8:00 [illegible] some faff. Quite surprising since Will was not part of the team.

The walk up to Top Camp took almost 2 hours, just as expected. We were also carrying drills, string, food, and other Top Camp equipment. We followed the reflectors to Fishface. They were white on both sides, which could make it frustrating if you are someone who is lost on their way to Top Camp. Instead, it should be red that leads to Top Camp, while white leads to caves and the car park. @@ -421,7 +425,7 @@ return.
2023-07-07
-
Christian Kuhlmann,Wassil Janssen
+
Christian Kuhlmann, Wassil Janssen
Homecoming - Foray into the Second Coming
Ropes used: