d - online edit of handbook/rig/rope_history.html

This commit is contained in:
Expo on server 2024-08-22 18:08:28 +01:00
parent 066cc62c69
commit 477eb51711

View File

@ -8,7 +8,7 @@ the rope is OK.</p>
<p>Rope should be chained only when it is washed and checked. Dirty or unchecked rope may be coiled. Rope should be washed, checked and <p>Rope should be chained only when it is washed and checked. Dirty or unchecked rope may be coiled. Rope should be washed, checked and
measured at the end of each expo. Ropes should be retired, when they have received a fall with a factor of greater than 0.5, when there any measured at the end of each expo. Ropes should be retired, when they have received a fall with a factor of greater than 0.5, when there any
defects detected (<a href="/expofiles/documents/notice_generale_cordes_courant_downloaded_22_07_16.pdf">examples bottom left corner</a>) or are defects detected (<a href="/expofiles/documents/notice_generale_cordes_courant_downloaded_22_07_16.pdf">examples bottom left corner</a>) or are
older than 5 years without a maximum end of life date (typically 10 years or more). The maximum end of life date may be determined by cutting of a section of rope and older than 5 years without a maximum end of life date (this is typically 10 years or more). The maximum end of life date may be determined by cutting of a section of rope and
finding the plastic strip that should contain the manufacturer and date of manufacture. This may then allow the manufacturers guidance to be finding the plastic strip that should contain the manufacturer and date of manufacture. This may then allow the manufacturers guidance to be
determined.</p> determined.</p>
<p>Now read the <a href="rigit.html">Expo Rigging Guide</a> on rope care and retirement. <p>Now read the <a href="rigit.html">Expo Rigging Guide</a> on rope care and retirement.