[svn r6867] Added scanned images from 2003-04 logbook
BIN
years/2004/2004-05sketch.jpg
Normal file
|
After Width: | Height: | Size: 34 KiB |
BIN
years/2004/2004-06sketch.jpg
Normal file
|
After Width: | Height: | Size: 11 KiB |
BIN
years/2004/jenny_rebelay.jpg
Normal file
|
After Width: | Height: | Size: 20 KiB |
@@ -35,6 +35,8 @@ pounds, refilled the van with lighter items and set off for Milton Tesco's, to c
|
||||
the various tasks which we hadn't had time to do due to the massive hiatus). We set off for Earl's place and arrived without mishaps,
|
||||
planning to leave for Dover at 4am. Expo had begun.</p>
|
||||
|
||||
<div class="centre"><img src="twotonnes.jpg" /></div>
|
||||
|
||||
<hr />
|
||||
|
||||
<div class="tripdate">5/7/04</div>
|
||||
@@ -282,7 +284,7 @@ rebelay temporarily to enable me to swing onto the ledge more easily. The rebela
|
||||
managed to cope, then just as I start to swing I noticed the rope would rub, so had to go back up, pass the rebelay, add an extra maillon,
|
||||
pass the rebelay and start swinging.</p>
|
||||
|
||||
<p><i>[Diagram of a stick-Jenny attempting to swing onto a ledge]</i></p>
|
||||
<div class="centre"><img src="jenny_rebelay.jpg"></div>
|
||||
|
||||
<p>I landed on the ledge and did some gardening of rocks, which boomed lots and made the ledge feel really rather exposed. Olly was
|
||||
complaining about the cold so I put in a bolt rather too quickly and he came down to the ledge. Olly took over the bolting so he could
|
||||
@@ -450,8 +452,7 @@ or <b>03-6C</b> look to be much.</p>
|
||||
|
||||
<div class="timeug">T/U 9hrs</div>
|
||||
|
||||
<p><i>[Extensively annotated copy of 2003 Underworld survey with ticked-off leads noted.]</i></p>
|
||||
|
||||
<div class="centre"><img src="uworld_qms.jpg" /></div>
|
||||
<hr />
|
||||
|
||||
<a id="lb07-21-A" />
|
||||
@@ -893,8 +894,7 @@ takes ~ 1 1/2 hours to get to the bottom of Subsoil and ~ 2 1/2 hours to get out
|
||||
|
||||
<div class="timeug">T/U 11.5hrs</div>
|
||||
|
||||
<p><i>[Sketch: "Rigging guide below Underworld"]</i></p>
|
||||
|
||||
<div class="centre"><img src="uworld_rig.jpg" /></div>
|
||||
<hr />
|
||||
|
||||
<div class="tripdate">27/7/04</div>
|
||||
@@ -928,7 +928,7 @@ rethreaded through the bomber natural instead of via the sling.</p>
|
||||
his way to the bridge, and recommended rigging a scramble down the back end of the hole, where the drop was more, around 10m. We did this,
|
||||
rigged from the single bit of usefully fixed rock in the vicinity – a bomber thread.</p>
|
||||
|
||||
<p><i>[Diagram, with captions including "fuckwit caver who throws his gear down holes"]</i></p>
|
||||
<div class="centre"><img src="pete_fuckwit.jpg" /></div>
|
||||
|
||||
<p>Pole was retrieved very easily by gently abseiling down and going around the snow plug. Very gently prusiking and self-lining completed
|
||||
the ascent (not wanting to damage the 9mm rope over the ledge. Pole was handed up on the end of the rope to safety.</p>
|
||||
@@ -1058,7 +1058,7 @@ wandered up this for 5m or so to a leftwards bend, at which point I decided to c
|
||||
<p>HOWEVER while carrying out one of the tacklesacks through Doesn't Go Rift I did something rather odd to my back, so I haven't caved
|
||||
since. Buggeration.</p>
|
||||
|
||||
<p><i>[Sketch elevation of Pie Series, which was later properly surveyed]</i></p>
|
||||
<div class="centre"><img src="pieseriessketch.jpg" /></div>
|
||||
|
||||
<div class="timeug">T/U 4hrs</div>
|
||||
|
||||
@@ -1146,25 +1146,29 @@ on.</p>
|
||||
of 3 entrances along a fault/joint; we called this 2004-05. They were 10m to a ledge, then seemed to go deeper, but we didn't have tackle
|
||||
and I couldn't get the rocks to drop there.</p>
|
||||
|
||||
|
||||
<p><b>2004-05:</b> <i>[sketch]</i></p>
|
||||
<div class="centre"><img src="2004-05sketch.jpg" /></div>
|
||||
|
||||
<p>Continued further, going back to the bivvy, but further north than the outward route. Found a rift below a line of small cliffs -
|
||||
2004-06.</p>
|
||||
|
||||
<p><b>2004-06:</b> <i>[sketch]</i></p>
|
||||
<div class="centre"><img src="2004-06sketch.jpg" /></div>
|
||||
|
||||
<p>Shortly later we found another entrance which was going to be 2004-07, until I found paint (90/5) and a tag (175), so we continued on
|
||||
until we say a walk/scramble-in entrance on the right. This has a drawn up survey and is <b>2004-07</b>. <i>[Arrow pointing into a blank
|
||||
<p>Shortly later we found another entrance which was going to be 2004-07, until
|
||||
I found paint (90/5) and a tag (175), so we continued on until we say a
|
||||
walk/scramble-in entrance on the right. This has a drawn up survey and is
|
||||
<b>2004-07</b>. <i>[Arrow pointing into a blank
|
||||
space marked "GPS".]</i></p>
|
||||
|
||||
<p>Further still back, we came across a large chamber with collapsed roof and two entrances. We forgot to survey it at all put it was
|
||||
photoed by Olly and GPSsed. <i>[Another arrow into the blank space.]</i></p>
|
||||
<p>Further still back, we came across a large chamber with collapsed roof and
|
||||
two entrances. We forgot to survey it at all put it was photoed by Olly and
|
||||
GPSsed. <i>[Another arrow into the blank space.]</i></p>
|
||||
|
||||
<p>We then walked back to where Tantalus Schacht should be and didn't find it, but did allocate <b>2004-09</b>, which is a shaft with "a
|
||||
good drop and rattle" – sorry no photos or survey, but it was GPSsed.</p>
|
||||
<p>We then walked back to where Tantalus Schacht should be and didn't find it,
|
||||
but did allocate <b>2004-09</b>, which is a shaft with "a good drop and rattle"
|
||||
– sorry no photos or survey, but it was GPSsed.</p>
|
||||
|
||||
<p>P.S. Olly's GPS seems to have lost these coords, so we'll have to re-find them next year.</p>
|
||||
<p>P.S. Olly's GPS seems to have lost these coords, so we'll have to re-find
|
||||
them next year.</p>
|
||||
|
||||
<hr />
|
||||
<a id="lb07-31-C" />
|
||||
|
||||
BIN
years/2004/pete_fuckwit.jpg
Normal file
|
After Width: | Height: | Size: 36 KiB |
BIN
years/2004/pieseriessketch.jpg
Normal file
|
After Width: | Height: | Size: 64 KiB |
BIN
years/2004/twotonnes.jpg
Normal file
|
After Width: | Height: | Size: 54 KiB |
BIN
years/2004/uworld_qms.jpg
Normal file
|
After Width: | Height: | Size: 112 KiB |
BIN
years/2004/uworld_rig.jpg
Normal file
|
After Width: | Height: | Size: 74 KiB |