[svn r4772] *** empty log message ***

This commit is contained in:
mjg54
2003-02-21 14:37:21 +01:00
parent 0bf700fa2d
commit 42e52b6a35
3 changed files with 22 additions and 15 deletions

View File

@@ -96,6 +96,8 @@ be undocumented QMs in this shaft). The pitch narrows below the deviation, to a
metres diameter. The remaining drop is in a fine open shaft, passing a ledge a few metres off the floor, into
<B>Crowning Glory Chamber</B></p>
<img class=onright src="rigging/e.png" alt="E entrance rigging guide">
<P>204f is a hole in a pile of boulders a few metres up the surface gully from 204e. A small tube descends towards 204e
via a couple of bouldery squeezes. The tube becomes steeper with a black space beyond. A light shone down this tube
reveals that it connects to the top of the pitch reached from 204e.