From 3a2443d6712f4469488db07e63262406a6c78862 Mon Sep 17 00:00:00 2001
From: Philip Sargent
Date: Thu, 28 Aug 2025 22:10:24 +0300
Subject: [PATCH] add in completion and tidy name
---
cave_data/1623-2025-JW-00.html | 2 +-
cave_data/1623-254.html | 72 +++++++++++++++-------------------
2 files changed, 32 insertions(+), 42 deletions(-)
diff --git a/cave_data/1623-2025-JW-00.html b/cave_data/1623-2025-JW-00.html
index 2d1b89f10..c9ad603b2 100644
--- a/cave_data/1623-2025-JW-00.html
+++ b/cave_data/1623-2025-JW-00.html
@@ -19,7 +19,7 @@ the form documented at
False
False
-2025-JW-00
+Small crawl
1623
1/T/+
diff --git a/cave_data/1623-254.html b/cave_data/1623-254.html
index 25185fe0f..78770502e 100644
--- a/cave_data/1623-254.html
+++ b/cave_data/1623-254.html
@@ -1,72 +1,62 @@
-
+
+
-
-This file is generated by troggle on Nov. 20, 2023, 7:13 p.m. UTC using the form documented at
+This file is generated by troggle using the form documented at
the form documented at
handbook/survey/caveentry.html
-False
-1623-254
-Kindergartenhöhle
-1623
-2/S/T x
-254
-2004-19
+Kindergartenhöhle
+1623
+2/S/T +
+254
+2004-19
- 1623-254a
- a
+ 1623-254a
+ a
- 1623-254b
- b
+ 1623-254b
+ b
- 1623-254c
- c
+ 1623-254c
+ c
-CUCC 2004 Brian, Tony
-caves-1623/254/254.svx
-Entrances A and B quickly unite. Phreatic passage leads downslope past a pitch (QM A) to a crossroads. Straight on is choked; right leads to a chamber and another choke, possibly passable (QM A). Left is 25m of varying-size phreatic to a T-junction. Right leads to two choked passages, both probably diggable (left QM A, right QM B) -- these draft, although the notes don't say whether the draft is in or out. Left at the T-junction leads upslope via a 2m climb to a chamber with an aven, then another chamber at the foot of an 18m surface shaft (entrance C). From this chamber a small passage leads off to the left (QM C).
-Rope + SRT gear
-Logbook account
-Plan:

Elevation:

Notes in 2004#46
-
-Blank if not, or notes about status such as 'surveyed, but no entrance fix so not yet in dataset'. -->
-In kataster (Form prepared 2006-06-28)
-
-
+CUCC 2004 Brian, Tony. CUCC 2025
+caves-1623/254/254.svx
+Entrances A and B quickly unite. Phreatic passage leads downslope past a pitch (QM A) to a crossroads. Straight on is choked; right leads to a chamber and another choke, possibly passable (QM A). Left is 25m of varying-size phreatic to a T-junction. Right leads to two choked passages, both probably diggable (left QM A, right QM B) -- these draft, although the notes don't say whether the draft is in or out. Left at the T-junction leads upslope via a 2m climb to a chamber with an aven, then another chamber at the foot of an 18m surface shaft (entrance C). From this chamber a small passage leads off to the left (QM C).
+
+ In 2025:
+
+The draughting pitch marked on the survey turned out to only be windy because it was between 2 entrances, the pitch itself had no draught and was shallow) and digging through a bit of rubble up the slope to the right of the end of the phreatic tube at the entrance (which just continued upwards until we decided the boulders were of too dubious stability to continue), we pronounced the cave killed.
+Rope + SRT gear
+Logbook account 2004-08-05
+Logbook account 2025-07-12 - finished exploration.
+Plan:

Elevation:
Notes in 2004#46
+
+
+
-
+