mirror of
https://expo.survex.com/repositories/expoweb/.git/
synced 2025-12-08 14:54:28 +00:00
[svn r3779] Added HTML files.
This commit is contained in:
792
years/1978/log.htm
Normal file
792
years/1978/log.htm
Normal file
@@ -0,0 +1,792 @@
|
||||
<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.0//EN">
|
||||
<html lang=en>
|
||||
<head>
|
||||
<title>
|
||||
1978: Logbook
|
||||
</title>
|
||||
</head>
|
||||
<body>
|
||||
29th July
|
||||
|
||||
<p>Got up at 7.30 (not Simon). We reached the café at about 12 and
|
||||
then discovered how heavy the gear was and how hot the weather was. The snow
|
||||
was out in force, but Simon, Andy and Doug found that 106 was possible. So
|
||||
the rest of us split into two groups and started prospecting.
|
||||
|
||||
<p>Nicky went down a shaft that appeared to go off to one side, however this
|
||||
only proved to be a tight and sharp (blood everywhere) way under the snow
|
||||
plug. About 50' deep.
|
||||
|
||||
<p><a name="1978-98-1">98</a> : A small shaft in a large clint (oops,
|
||||
grike). Very sharp rocks at the top, after which the shaft bells out toward
|
||||
a lightly boulder covered floor about 27m (85 feet to sensible people) from
|
||||
surface, but as yet the ladder doesn't reach the floor. Mike.
|
||||
|
||||
<p><a href="#1978-98-2">Next trip</a><hr>
|
||||
<hr>
|
||||
Ben and John ; Well we went down this hole somewhere near 106 but after c
|
||||
30' it got tight so returned to brilliant sunshine. We continued sweating
|
||||
around the plateau looking down things - the only one of interest was a huge
|
||||
entrance c 200 yds from 106 which ended after 50-60' free climb in a small
|
||||
snowfield with a beautiful 7' 6" ice stalagmite. On the way back to the
|
||||
van I attempted the left hand variant of the superdirect route across the
|
||||
plateau, but as I was laybacking up this flake, the whole thing fell off with
|
||||
me on it - do they have helicopter hearses ? John.
|
||||
<hr>
|
||||
|
||||
<a name="1978-76-1">Team Bluewater</a> (minus Nick)
|
||||
|
||||
<p>Mega panic because of huge volumes of snow, noted 96 choked with snow and
|
||||
lots of patches of snow between the snakes on the plateau. Navigation
|
||||
eventually got us to 106 where a draught was still evident in 106 and 106A
|
||||
but not in 106B. Simon went down and put bolts in - last year's anchors
|
||||
were well preserved - but had to smash off ice-formations to get into 106A.
|
||||
The Bluewater was fed in and belayed and Andy went down to the top of the
|
||||
snow plug, which had a tiny gap round it. Tried a new hole which led down c
|
||||
6m to a small chamber with a side aven whose walls were coated with a thick
|
||||
( 6cm ) layer of hexagonal ice-crystals which were very loose, so the
|
||||
explorer exitted to the top of the snow and started to DIG out the original
|
||||
route past the plug. Hacking away with the hammer soon enlarged the 15cm
|
||||
slot to 1m and got down to 5m deep where it got bigger and loose snow could
|
||||
be kicked down. Here ice formations smashed off for safety and Andy could
|
||||
see down to the 'snow platform' which was just a step in the steep
|
||||
névé. However, he did not descend to it because of a nasty rub
|
||||
above. Andy exitted and Simon descended to put a bolt in at the snow plug
|
||||
level, which took slightly longer than expected. The pitch is obviously
|
||||
going to be a right bastard to rig on SRT, even more than ladders - probably
|
||||
3 more bolts needed. Andy.
|
||||
|
||||
<p><a href="../1977/andylg.htm#1977-76-7">Previous trip</a>/
|
||||
<a href="#1978-76-2">Next trip</a><hr>
|
||||
|
||||
<a name="1978-98-2">30th July</a>
|
||||
|
||||
<p>Mike, John, Ben, Nicky. We all walked up to the plateau in the heat
|
||||
again, taking the rest of the tackle, and Simon, who was working off his
|
||||
hangover. Once on the plateau, we took the remaining ladders and another
|
||||
rope up to 98. After rigging the pitch as yesterday, Mike was the first to
|
||||
descend 70' of ladder and reach the bottom of the fine entrance shaft. After
|
||||
a brief exploration, I followed, lifelined down by Ben. Mike and myself
|
||||
first explored the most obvious of the two passages, a small rift section
|
||||
sloping downwards about 30 feet, but becoming too narrow and uncomfortable
|
||||
to pursue (sharp rock). After failing to find a way on, we returned to the
|
||||
bottom of the pitch to take a look at the short section of passage on the
|
||||
opposite side of the shaft. This opens out into another large shaft, and
|
||||
after chucking several rocks down, we called to John to come down to take a
|
||||
look at the new shaft, which we estimate to be another superb shaft of about
|
||||
70'. We returned to the surface to fetch more equipment and bolts for
|
||||
rigging the next pitch. Owing to the ominous presence of thunder, lightning
|
||||
and hailstones, we sheltered with the present Team Bluewater members before
|
||||
giving up for the day and strolling back from the plateau in the rain.
|
||||
Nicky.
|
||||
|
||||
<p><a href="#1978-98-1">Previous trip</a>/
|
||||
<a href="#1978-98-3">Next trip</a><hr>
|
||||
|
||||
<a name="1978-76-2">Eislufthöhle</a>. After delays for carbide,
|
||||
and thunder, and laziness, Andy finally set off to put another bolt in. Lots
|
||||
more snow landscaping before the bolt was finally started above last year's
|
||||
snow platform - sitting on more snow. The bolt was nearly in when shouts from
|
||||
above indicated lightning - and immediate evacuation. Between Simon's bolt
|
||||
yesterday and the new bolt (c 20') the rope has a nasty snow rub which makes
|
||||
prusiking horrible, and at least one ice/rock rub; the rigging needed here is
|
||||
difficult to conceive - perhaps a 10m ladder would help (DEFEATIST!). The
|
||||
next pitch will be very free, perhaps 20m ? then a walk off. This is proving
|
||||
to be the world's most frustrating pothole ! Very impressive electric storm
|
||||
on surface.
|
||||
|
||||
<p><a href="#1978-76-1">Previous trip</a>/
|
||||
<a href="#1978-76-3">Next trip</a><hr>
|
||||
|
||||
<a name="1978-98-3">31st July</a>
|
||||
|
||||
<p>98 : Ben, John, Mike. Ben and Mike went down first shaft and Mike
|
||||
started down the next to put a bolt in. Through the thrutchy bit brings you
|
||||
to the top of the next pitch, supposedly 60-80'. Mike was lined down a few
|
||||
feet to a ledge where he put a bolt in. John has meanwhile rerigged the
|
||||
entrance pitch and abseiled down and tossed a coin with Ben as to who should
|
||||
go down the next pitch first. Ben won and then John went to rig the second
|
||||
pitch. On the way through the thrutchy bit he dropped Mike's carbide down,
|
||||
making a superb noise sounding like a very deep shaft. Ben went down only to
|
||||
find that the bottom was the bottom of the pot. A small aven comes in next
|
||||
to the shaft, leaving only muddy earth at the bottom. It does not so much
|
||||
choke but the rift to either side narrows and the floor is flat. The second
|
||||
pitch was only about 35' from the ledge. Quite a nice shaft, but coming to
|
||||
nothing. John went up, then Mike came down. Then we derigged and went out.
|
||||
|
||||
<p><a href="#1978-98-2">Previous trip</a>/
|
||||
<a href="../../plateau/98.htm">Guidebook description</a><hr>
|
||||
|
||||
<a name="1978-76-3">Andy and Doug</a> ( the obvious Höhle )
|
||||
|
||||
<p>Two descents made today. On the first, Andy finished off putting in the
|
||||
bolt of the thunderstorm-interrupted trip of yesterday, whilst I sat on the
|
||||
ice at the bottom of the first pitch in darkness having dropped my helmet at
|
||||
Andy earlier. We returned to the surface to thaw out and I ate a tin of
|
||||
sardines. Then after a brief policy discussion we redescended. Andy zipped
|
||||
down to Yesterday's Terminus whilst I went down after him, adding another
|
||||
ladder to the one on the snow plug and then stopping halfway down Plugged
|
||||
Shaft to put a bolt in while Andy rumbled snow and ice down from Yesterday's
|
||||
Terminus. After about 3/4 of the hole, my stinky went out, so I descended in
|
||||
darkness to Yesterday's Terminus. At this point Andy's light went out as
|
||||
well, so we tried to relight, Andy pouring his waste carbide down his wellie
|
||||
and myself pouring it into my Hard Man's Handbag. We then decided it must be
|
||||
fairly late and exitted. Plugged Shaft has some very beautiful but
|
||||
potentially extremely dangerous. (Sorry, my brain stopped) Ice formations.
|
||||
Doug. My God, is that ice dangerous enough or what ? Andy.
|
||||
|
||||
<p><a href="#1978-76-2">Previous trip</a>/
|
||||
<a href="#1978-76-4">Next trip</a><hr>
|
||||
|
||||
<a name="1978-76-4">1st August</a>
|
||||
|
||||
<p>Guess which hole. Simon abbed to YT. Doug put in a rebelay bolt while
|
||||
Simon perused the situation at YT. The previously immovable ice boulders
|
||||
were easily kicked down the pitch leaving only one reasonably jammed large
|
||||
iceberg left. A bolt was placed well out in the passage giving a fine free
|
||||
hang to the large chamber at the top of Saved Shaft. The Bluewater now
|
||||
stretches all the way from the surface to the bottom of Plugged Shaft.
|
||||
Dropped the Interalp at the bottom and left rapidly, my Gibbs breaking on
|
||||
exit. Simon.
|
||||
|
||||
<p><a href="#1978-76-3">Previous trip</a>/
|
||||
<a href="#1978-76-5">Next trip</a><hr>
|
||||
|
||||
The plateau, Nicky, Ben, John.
|
||||
|
||||
<p>We managed to run up to the col, and then collapsed under the weight of
|
||||
sweat. The gallon water container was filled and we set off prospecting
|
||||
again. And it was hot. We tried wearing just shorts, but the sunburn hurt
|
||||
too much - a great incentive for going down holes. We went 40-60' down
|
||||
several promising passages but all choked/were snow plugged. And it was
|
||||
still hot. We wandered round in circles getting more demented in the heat.
|
||||
Nicky wearing her shorts on her head, me sitting down a hole with just head
|
||||
projecting and Ben screaming about boulders falling out of the sky. It was
|
||||
hot. John.
|
||||
<hr>
|
||||
|
||||
2nd August
|
||||
|
||||
<p>Generally low cloud and ominous weather ruined Ben, John and my own's
|
||||
prospect of a nice peacefully energetic rest day by making everyone jack. We
|
||||
proceeded to Bad Aussee where we caused chaos and many puzzled looks in one
|
||||
car park and then parked in another. We took Bad Aussee, buying some bread
|
||||
and really smelly garlic sausage. I lingered hopefully outside the museum
|
||||
but nobody else followed which was a pity since we later discovered that it
|
||||
had a speleological exhibition on. Back to Altaussee for a noon pub crawl
|
||||
round the lake while me and Nicky went for a swim with a naked log. Back to
|
||||
camp for sardines and mackeral and biscuits then, as per usual. Distributed
|
||||
whiskey to Krauts next door. Doug.<br>
|
||||
Plummers can't spell. Andy<br>
|
||||
I washed my socks. John.
|
||||
<hr>
|
||||
|
||||
<a name="1978-76-5">3rd August</a>
|
||||
|
||||
<p>Eislufthöhle, Andy and Simon
|
||||
|
||||
<p>S changed his prusiking system radically, converting to a frog system. A
|
||||
abbed first and we had a short discussion at the "loose" ice
|
||||
boulder. A rather too short rope and a ladder were rigged on Saved Shaft and
|
||||
we descended. After some confusion, we got the bolt kit down and rigged a
|
||||
traverse line across the top of Keg series. Eventually S descended last
|
||||
year's penultimate pitch, a fine free hang. It was decided that further
|
||||
descent would cause a rub about halfway up the pitch, a bolt will have to be
|
||||
placed tomorrow. Today was quite successful. S.
|
||||
|
||||
<p>PS. Tomorrow should see Team Bluewater breaking new ground.
|
||||
|
||||
<p><a href="#1978-76-4">Previous trip</a>/
|
||||
<a href="#1978-76-6">Next trip</a><hr>
|
||||
|
||||
<a name="1978-107-1">John, Ben, Nicky and Mike</a>.
|
||||
|
||||
<p>We decided to move on to a new area on the right of the plateau (going
|
||||
up). Before moving we all had a shave (not Nicky) down a cave with a
|
||||
flat-out crawl over razor blades wearing shorts and shirts. After which a
|
||||
superb knife-blade pitch occurred (for keep-fit enthusiasts) ten pull-ups
|
||||
required for exit. After moving to our new area, several caves were looked
|
||||
at until Nicky found a superb drafting entrance (handline required to pull
|
||||
against the gale). To date we are still attempting to remove some very nasty
|
||||
boulders, keystones, from the head of the first pitch. Mike.
|
||||
|
||||
<p>Some plummers can spell even less than others. Andy.
|
||||
|
||||
<p><a href="#1978-107-2">Next trip</a><hr>
|
||||
|
||||
<a name="1978-76-6">4th August</a>
|
||||
|
||||
<p>Eislufthöhle, Doug and Andy
|
||||
|
||||
<p>Low motivation led to a slow start, Doug abseiled first and adjusted the
|
||||
amount of slack in the rebelays, kicked the iceberg and continued. Andy
|
||||
followed with lots of rope in a tockle bog. Rigged a new (club rope first)
|
||||
rope on Saved Shaft before removing the old (shitty) rope to act as a
|
||||
traverse line for above Keg series. The Interalp was removed from same and
|
||||
put in the tockle bog.
|
||||
|
||||
<p>Moving forward (urgh !) we reached the takeoff for pitch 6 (gnuk, thrutch
|
||||
!). Andy put in a bolt about 1m below the big ledge which gives a very good
|
||||
changeover for the stand-off pitch below. This pitch gives the impression of
|
||||
dropping into the side of a vadose canyon - confirmed by finding an inlet
|
||||
10m up on the left (ie. upstream).
|
||||
|
||||
<p>Down the narrow passage into boulder land, Andy found a climb up on the
|
||||
right which led to a short roomy passage to yet another shaft - no draught
|
||||
[found by Nick, 1977]. Directly onward to the big chamber, less drip this
|
||||
time, we found an OK freeclimb down c 5m under a colossal boulder. Straight
|
||||
on, the rift proved to be very high but not too wide. Andy dropped down to
|
||||
an impossibly narrow streamway, while Doug found a useful traverse level
|
||||
leading about 50m to a small chamber into which we could not safely descend,
|
||||
but observed a hole into which boulders were lobbed, 25m ? The rift
|
||||
continues beyond, and we can't tell where the (much increased) draught comes
|
||||
from, retreated.
|
||||
|
||||
<p>Back at the 'final' pitch, Andy set off and observed more question marks
|
||||
halfway up the pitch. Doug had immense problems with his system, and the
|
||||
exit, right to the surface, was accompanied by continuous swearing and
|
||||
cursing, Doug surfacing 15 mins or so behind Andy. 5½ hours.
|
||||
<br>Andy.
|
||||
|
||||
<p><a href="#1978-76-5">Previous trip</a>/
|
||||
<a href="#1978-76-7">Next trip</a><hr>
|
||||
|
||||
<a name="1978-107-2">Nicky, Mike, John</a>.
|
||||
|
||||
<p>This is getting silly. We went back to the same hole as yesterday and
|
||||
started manoeuvering boulders. Stones fell for 2 secs plus before hitting
|
||||
and bouncing, while the draught is massive. The cloud dropped once, covering
|
||||
the plateau in fog, then you could see the mist swirling in the wind coming
|
||||
from our hole. This encouraged us to get engrossed in some technical digging
|
||||
using bolts in boulders and tied off knife blades as pulley points. Probably
|
||||
the biggest waste of time so far. Just one more boulder to move now. The
|
||||
main bolt is in place for the pitch, so we should see the bottom of the big
|
||||
hole tomorrow. John.
|
||||
|
||||
<p><a href="#1978-107-1">Discovery</a>/
|
||||
<a href="#1978-107-3">Next trip</a><hr>
|
||||
|
||||
<a name="1978-76-7">5th August</a>
|
||||
|
||||
<p>Yes, a really "brown stains on the furry wonder suit" day
|
||||
today. Simon and I zipped down uneventfully to the pitch with the big ledge
|
||||
where Simon pulled up the rope and gardened the ledges. On to the climb down
|
||||
where we rigged a handline, and then through the traverse to the boulder
|
||||
floor before the chamber with THE PITCH. We chucked a few rocks down and
|
||||
then started putting a bolt in, eventually finding some good rock to put it
|
||||
in. Using this bolt as a belay, Simon climbed down into the chamber and then
|
||||
came back out again very very fast as he noticed what he thought was a nice
|
||||
solid wall above him was in fact a delicately poised bouder (THE BOULDER).
|
||||
|
||||
<p>I calmed Simon down, then had a look myself, trying underneath where we
|
||||
were standing for a safeish looking pitch head. None was forthcoming. I came
|
||||
back and Simon went down again, then Simon came back and I went down again.
|
||||
The pitch has a very impressive echo and will be a naughty word to rig.
|
||||
Refettled carbides at bottom of climb down and went out, Simon causing more
|
||||
brown stains by rumouring that the ice boulder had moved.
|
||||
|
||||
<p><a href="#1978-76-6">Previous trip</a>/
|
||||
<a href="#1978-76-8">Next trip</a><hr>
|
||||
|
||||
<a name="1978-107-3">Ben, Mike</a>
|
||||
|
||||
<p>Admittedly our boulders were smaller, but they'd still kill you. We had
|
||||
this large rock jammed in the hole we wanted to go down, so we used the
|
||||
system rigged up yesterday and pulled and pulled but it didn't move much.
|
||||
Then Mike had a good idea and eliminated the friction on the pulling rope.
|
||||
With a quick pull we had it suspended above the hole, held only by a peg
|
||||
pulling in the direction most likely to pull it out. Then it was chocked up
|
||||
and the pulleys rearranged so as to pull it out. The rock was put on the
|
||||
ledge by the pitch where it trembled a bit, but was held by the rope so we
|
||||
felt we could go down the pitch. Unfortunately, we found a spreader, a long
|
||||
enough rope and rigged the pitch. Ben was selected to go down. Going through
|
||||
the hole, which is a bit small, it opens out into a superb enormous shaft,
|
||||
about 20' in diameter, 55' deep. At the bottom, lots of different passages
|
||||
lead off, one which is pretty big and horizontal. There's also a good rift
|
||||
which still carries the draught. Its pretty fucking marvellous down there.
|
||||
Mike came down after Ben had come back up. Ben.
|
||||
|
||||
<p><a href="#1978-107-2">Previous dig</a>/
|
||||
<a href="#1978-107-4">Next trip</a><hr>
|
||||
|
||||
<a name="1978-107-4">6th August</a>
|
||||
|
||||
<p>Ben, Mike, John, Nicky : 107
|
||||
|
||||
<p>After a couple of hours effort and sardines, all dangerous boulders were
|
||||
removed from the entrance and the shaft abbed down by all four of us. After
|
||||
gasping or something similar at the SIZE of it and the strong draught, we
|
||||
split into two exploring parties (there is a lot to explore). Anyway, after
|
||||
John had descended down 100 foot shaft in a rift section, and made enough
|
||||
noise to attract attention to this fact, we all followed, finding one good
|
||||
natural belay besides John's peg. At the foot of this impressive enlarged
|
||||
canyon, we found another fine pitch (65') which offers several possible
|
||||
forward routes. A short traverse to the left leads to another large soaring
|
||||
shaft - which will be intensively explored tomorrow. Only a few loose
|
||||
boulders were discovered, generally by their rapid descent towards those at
|
||||
the foot of the pitch - but none of us were much worried, still being too
|
||||
impressed with the size of the place. Generally the rock seems to be pretty
|
||||
good and clean and we haven't encountered closely any kind of dubious
|
||||
boulders. Nicky.
|
||||
|
||||
<p><a href="#1978-107-3">Previous trip</a>/
|
||||
<a href="#1978-107-5">Next trip</a><hr>
|
||||
|
||||
6th August : Team Bluewater Fed, Festered and Farted.<hr>
|
||||
|
||||
<p><a name="1978-76-8">7th August</a>
|
||||
|
||||
<p>Doug and Simon : Collected a crowbar from 107 and S transported it down
|
||||
to Yesterday's Terminus, where to great surprise we discovered that the ice
|
||||
boulder had disappeared and presumably broken up on the floor of the pitch.
|
||||
Continued on down to the large boulder where Doug put in a bolt, backed up
|
||||
by the handline. S abbed into a huge pitch meandering forwards and widening.
|
||||
Protection needed on a flake near the top and at a constriction about 30' ?
|
||||
down. At c 75', worry about the rubs became great, pitch widens out, may
|
||||
well need rebelay. At least 30' to bottom of pitch, then a further pitch
|
||||
down after that. It might be possible to have a decent rig from a buttress
|
||||
further forward, but a floor was visible that. (??) Simon.
|
||||
|
||||
<p><a href="#1978-76-7">Previous trip</a>/
|
||||
<a href="#1978-76-9">Next trip</a><hr>
|
||||
|
||||
<a name="1978-107-5">Nicky, John, Mike, Ben</a>.
|
||||
|
||||
<p>After we had collected all the tackle from the dump, we went back to the
|
||||
cave (via 106) where we met Ben who was trying to jack by blocking the
|
||||
entrance pitch with loose boulders. Having removed the rock, we abbed down
|
||||
to the bottom of the 65 and we started looking along the passage after the
|
||||
traverse mentioned yesterday. We freeclimbed into the shaft and found a very
|
||||
strongly draughting (inwards) canyon. This continued (partly choked) to a
|
||||
pitch of 30 foot down to a false floor followed by another 20 foot to
|
||||
another false floor followed by yet another yet undescended larger pitch.
|
||||
There is another pitch on the first false floor down a continuation of the
|
||||
canyon but this is 100 ft, ie. we don't want to do it. Several bolts are
|
||||
needed on these pitches only one of which is placed so far, so this will
|
||||
occupy most of the next trip. PS. while attempting to put a bolt in, Ben
|
||||
requested and received a hit on the head with the peg hammer.
|
||||
|
||||
<p><a href="#1978-107-4">Previous trip</a>/
|
||||
<a href="#1978-107-6">Next trip</a><hr>
|
||||
|
||||
Team Fiesta arrived in the previous evening, comprising Nick and Julian,
|
||||
so a new saga starts here :
|
||||
|
||||
<p>7th August
|
||||
|
||||
<p>Messieurs Supercool and Supersmooth
|
||||
|
||||
<p>Helicopter up to the plateau and abseiled down. Found 110, see sketch.
|
||||
Six teeth dropped off my anchor ! Huh ! substandard subb ... mumble.... Time
|
||||
2 hrs. Oh, yes, I forgot, we had to do some digging to get in. Then :
|
||||
|
||||
<p>Found 111, 30m to narrow rift which got too tight/choked, shaft split 20m
|
||||
down to shaft half full of snow.
|
||||
<!-- I suspect that there is a sentence about 112 missing here-->
|
||||
Both last two shafts are close to 98.
|
||||
|
||||
<p>Back at car by 7.15, helicopter never turned up. Nick.
|
||||
<hr>
|
||||
|
||||
8th August.
|
||||
|
||||
<p>Mikeandysimonnickybendougjohn Fed/ Festered/ Farted
|
||||
|
||||
<p>Found Koppenbrüllerhöhle and investigated with matches.
|
||||
<hr>
|
||||
|
||||
<a name="1978-76-9">8-9th August</a> : Overnight trip by Supercool and
|
||||
Supersmooth
|
||||
|
||||
<p>106 : Just found the entrance before dark, Phew ! Got underground by 8pm.
|
||||
Blatted down to the Tap Room, then along traverse to pitch head amongst
|
||||
boulders. Placed new bolt at head and descended about 15m to microledge and
|
||||
placed a bolt rebelay. Next section was a "best pitch o'the pot"
|
||||
so far. 35m to a large ledge with inlet. As the water fell away, we made a
|
||||
bold step over to an opposite ledge. A couple of bolts later we descended
|
||||
10m back to the streamway. Then we followed an obvious traverse line to the
|
||||
next pitch. Plenty of black spaces about, so we rigged a traverse line from
|
||||
bolt above a rocking boulder (really swinging, man). Pitch head ('nother
|
||||
blot) was smallish but things got bigger further down. And bigger. And
|
||||
bigger ..... A superb (Even better pitch o'the pot) free hanging 55m job.
|
||||
Juniper Gulf eat shit ! This landed on blodders (good uns) and was followed
|
||||
by a quick 5m to the floor. Downhill the stream flowed into a lowish
|
||||
(wetsuitable) passage. Uphill quickly leads to balcony overlooking immense
|
||||
chamber (15m x 15m x 80m high). Stream could be heard around corner, but
|
||||
hadn't got enough rope to descend 12m pitch from balcony to reach it.
|
||||
|
||||
<p>Exit was slower than expected due to :<br>
|
||||
1) Rope on 5m pitch vanishing upwards and coming back down through the
|
||||
boulders..... Aaaaaarrrrrgh ! JG came back down to give me the rope having
|
||||
prusiked the pitch once already. (A quick half litre for that man).<br>
|
||||
2) Falling asleep while prusiking !
|
||||
|
||||
<p>Made the entrance again after 10.5 hour trip. Even Unox ham in a cold
|
||||
drizzle tastes superb after this ! Total depth so far c 280m (Club record
|
||||
depth) Nick
|
||||
|
||||
<p><a href="#1978-76-8">Previous trip</a>/
|
||||
<a href="#1978-76-10">Next trip</a><hr>
|
||||
|
||||
9th August (daytime !?) F/F/F
|
||||
|
||||
<p><a name="1978-107-6">9th-10th Ben and John overnight down 107</a>
|
||||
|
||||
<p>As the sun set below the clouds, we disappeared down the first pitch. A
|
||||
quick grot around the rift of the 7th decided us that we could not easily
|
||||
eliminate the ladders to the false boulder, so we looked around the bottom
|
||||
of the 65' pitch. An awkward, loose climb leads to a short traverse across
|
||||
this hole. You lob boulders down and 4 seconds plus there's a dull boom. 300
|
||||
ft ?
|
||||
|
||||
<p>Beyond the hole is a 15' pitch rigged off the mankiest bolt in Austria
|
||||
and a tied off peg and a natural thread. Then the big one. Bolting at 2
|
||||
O'Clock in the morning in the wet icy draught is slow work. The water level
|
||||
in the nearby pool rose quickly and what was a trickle turned into a
|
||||
freezing stream. 180' of ladder and rope was fed down and I followed. There
|
||||
are lots of ledges, easy ladder climb, but it was getting colder and wetter.
|
||||
The whole cave was reverberating to the sound of massed choirs chanting
|
||||
"Brown Girls". Time to go home. Total depth descended c 400'.
|
||||
|
||||
<p align=right>John.
|
||||
|
||||
<p><a href="#1978-107-5">Previous trip</a>/
|
||||
<a href="#1978-107-7">Next trip</a><hr>
|
||||
|
||||
<a name="1978-76-10">9th-10th August</a> Doug and Andy overnight in 106
|
||||
|
||||
<p>It had already got dark by the time we went underground, and various
|
||||
amounts of rerigging delayed us somewhat. Eventually we got to the big pitch
|
||||
which Andy descended first - it was COLOSSAL ! At the bottom, a couple of
|
||||
ace natural belays got us down the next 10m pitch to the floor of Mega
|
||||
boulders. At first it appeared to be a big choke, but descending down dip
|
||||
and then climbing up vast piles of boulders, a roomy gallery - almost an
|
||||
exhibition hall of all the varieties of unstable boulder bridges - was
|
||||
found. The explorer started a descent of the far side of the boulders under
|
||||
a boulder estimated at 5000 tons, but waited for support from DHF.
|
||||
Eventually found the obvious free climb down, but found it overhanging - so
|
||||
went off for the bolting gear and rigged a short pitch down into the new
|
||||
chamber. From here a traverse and awkward climb down leads to a stream which
|
||||
goes off to the left (not pushed very far). An additional tributary comes
|
||||
from a rift about 20' up and flows the same way. Between the two is an OFD
|
||||
type passage ending in a drop into a rift and a possible (but not without a
|
||||
lifeline) continuation beyond. We rigged a natural belay for the start of
|
||||
the rift (in a side rift to the left) and placed a bolt rebelay, but did not
|
||||
descend further due to lack of time. Set off upward and soon got somewhat
|
||||
warmer (despite the heavy water at the bottom of the 180') on the way up.
|
||||
Eventually surfaced at a late hour (8.30 am !) after a 12 hour plus trip.
|
||||
Andy. Deeper than OFD now !
|
||||
|
||||
<p><a href="#1978-76-9">Previous trip</a>/
|
||||
<a href="#1978-76-11">Next trip</a><hr>
|
||||
|
||||
<a name="1978-107-7">10th August</a>
|
||||
|
||||
<p>Mike, Nicky, 107
|
||||
|
||||
<p>Having struggled into our several layers of wet clothing and watched the
|
||||
plateau disappear in the layers of mist, we started off down the cave. Having
|
||||
got thoroughly resoaked by the bottom of the 65' pitch, we carried on to the
|
||||
head of the "big" pitch, pausing to drop stones down John's
|
||||
"Big 'ole". Mike then proceeded without hesitation or thought to
|
||||
the bottom of the first section of the pitch - whilst I sat cheerfully at the
|
||||
top contemplating the rock wall opposite. After half an hour, the merry
|
||||
strains of "Brown Girls" stopped floating up the pitch and bolting
|
||||
sounds carried on intermittently. After another half an hour of my own
|
||||
personal attempts at singing (quietly) and warming up exercises, two whistle
|
||||
blasts were heard. After yet another half hour, Mike reappeared at the top of
|
||||
the pitch. Damp, cold and wetness ensured that our early (but not hasty)
|
||||
retreat from the cave was the wisest decision, so we left with only one bolt
|
||||
as progress. Nicky.
|
||||
|
||||
<p><a href="#1978-107-6">Previous trip</a>/
|
||||
<a href="#1978-107-8">Next trip</a><hr>
|
||||
|
||||
<a name="1978-41-1">12th August</a>
|
||||
|
||||
<p>Karl, Doug, Andy
|
||||
|
||||
<p>Karl arrived at 10am and we drove up to the plateau café. Walked to
|
||||
1623/41a (Stellerweghöhle) which is very well concealed in Bunde. The
|
||||
phreatic-looking horizontal entrance led on into a hading rift and then to a
|
||||
huge snowpile below another entrance. Below the snow, the rift is very
|
||||
extensive, and at about 45 degrees, but further on it gets a bit more
|
||||
vertical. The big pitch at the end is beyond a very nasty traverse through a
|
||||
window, so we couldn't see much, having brought no rope. On the way through
|
||||
and back, Karl kept looking under boulders and at one stage showed us a pile
|
||||
of bat bones, so we thought he was looking for bat remains, but when he
|
||||
found what he was looking for it proved to be a small creature - little
|
||||
worms c ½ cm long which he collected with forceps. Eventually, we had
|
||||
four, and left.
|
||||
|
||||
<p>On the way back, we passed various entrances, and did a short trip in
|
||||
Elchhöhle (1623/31) which is a large phreatic tube in horizontally
|
||||
bedded rock, with lots of boulders. Karl again kept looking for bugs, despite
|
||||
having left his collecting gear at the entrance. Then he found a small beetle
|
||||
under a rock at which he seemed most upset not to have his gear, so Doug
|
||||
rushed off to get it. When he returned, the beetle had escaped, so Karl was
|
||||
dismantling the cave to find it. Large rocks crunched and eventually the
|
||||
terrified beetle was collected - Karl was very pleased as it is only the
|
||||
second specimen of that species found in Austria. We exitted and had lunch at
|
||||
the Loser Hütte before returning to camp and drowning the beetle in
|
||||
Vodka. Andy.
|
||||
|
||||
<a href="../1980/log.htm#1980-41-1">Next trip</a> (start of CUCC exploration)
|
||||
<hr>
|
||||
|
||||
12th-13th August. Nick, Julian, Simon. <a name="1978-76-11">Eislufthohle</a>
|
||||
|
||||
<p>'nother overnighter. Couple of hours to get down to previous terminus.
|
||||
Then : descended 30' to bolt rebelay and 40' to floor. Traversed forward in
|
||||
large meandering vadose canyon (100' high, traverse level 30-40' off floor).
|
||||
After jammed boulders, descended the yetchiest, muddiest 15m (sorry change of
|
||||
units) pitch in the entire known universe. Traverse, traverse, traverse and
|
||||
we rigged another pitch but didn't descend. Further pitch seen below, all in
|
||||
same canyon. Total depth to this point estimated at 350-360m. The cave mud
|
||||
mentioned above was examined by Karl and he confirmed that it was not the
|
||||
sort of mud expected from a sump backing up. I therefore declare, forthwith
|
||||
and hereby, that Eislufthöhle is very significant, horizontally
|
||||
significant and likely to go a lot deeper. I forgot to mention in the above
|
||||
description that we made one thrutchy freeclimb down at one point, but I'm
|
||||
not sure exactly where.
|
||||
|
||||
<p><a href="#1978-76-10">Previous trip</a>/
|
||||
<a href="#1978-76-12">Next trip</a><hr>
|
||||
|
||||
<a name="driveroty">Brain</a> aberrations during the above trip write-up were
|
||||
caused by the distraction of our second trip of the night :
|
||||
|
||||
<p>Explored the river by the side of the road below the toll road. Tackle :
|
||||
one Ford Fiesta. Descended 30' pitch into streamway, with a couple of
|
||||
mid-air turns too. time c 5 seconds, tackle written off.
|
||||
|
||||
<p>The above trip led to a series of extraneous trips to Bad Aussee and
|
||||
Salzburg hospitals where Simon and Julian were swindling the insurance with
|
||||
their minor injuries (broken neck, broken sternum). It put an end to pushing
|
||||
106 for the year, and we were naturally reluctant to indulge in any more
|
||||
overnight trips.
|
||||
<hr>
|
||||
|
||||
<a name="1978-107-8">14th August</a>
|
||||
|
||||
<p>John and Ben, 107
|
||||
|
||||
<p>At last, decent weather allowed a reasonably early start taking Vic, Rod
|
||||
and Dave for them to add some depth down the shaft with the boulder floor.
|
||||
John and Ben meanwhile rerigged the rift pitch with the 100m rope. Pretty
|
||||
awkward abseil, even worse ladder climb back up. Got to Mike's
|
||||
"desperate loose ledge", pushed a bolt in the wall and laddered the
|
||||
rest of the shaft. Fed the rest of the 100m rope down and John started off
|
||||
down. At -70' he found an enormous mess in the rope and after trying for a
|
||||
long while to undo it, came back up pulling the rope behind him. We undid the
|
||||
knots on the ledge after half an hour, and then both descended 110' pitch.
|
||||
Not bad shaft with big boulder at bottom. Stream continues under rift.
|
||||
Descended 20' in scramble and bolted another 20' pitch. Continued along above
|
||||
stream to pitch c 30-50'. Depth so far this way 570'. Ben. Time 7 hrs.
|
||||
|
||||
<hr>
|
||||
|
||||
Team Geriatric (Vic, Rod, Dave) crawled up the hillside half a mile
|
||||
behind the fast moving dust cloud that showed where team youth was burning
|
||||
up the miles. At the cave entrance, when they eventually got there, the
|
||||
pensionaers were heard to be talking about family responsibilities,
|
||||
arthritis and other ploys for not going underground (one of them even had to
|
||||
be lent a descender, having conveniently forgotten his own). Marshalled
|
||||
between members of the Youth Team, the ancients were carefully fed down the
|
||||
entrance of the cave. A curious transformation came over them, a glazed
|
||||
expression in their old eyes as though recalling distant memories of when
|
||||
they too had discovered new glories. Down the first pitch, then the second,
|
||||
and the third, then along the traverse ; so far so good, their aged limbs
|
||||
had stood up well to the strain. Now at the head of the next pitch they were
|
||||
sat down and told of hitherto undescended holes ahead of them. Then Team
|
||||
Youth vanished into the darkness to push into discoveries elsewhere.
|
||||
|
||||
<p>Left alone at last, the crones shook off their disguise of weariness.
|
||||
Swiftly they fixed a rope down the thirty foot pitch to a large flor of
|
||||
unstable boulders. One of them carried on to the bottom of the boulder choke
|
||||
while another was fixing a bolt at the top of the rift. Soon Rod was going
|
||||
down the rift till he ran out of rope at about 70'. He called for another
|
||||
rope, tied it onto the end of the previous one and carried on down to the
|
||||
end of that one too. He ascended to a safe spot (The Sentry Box) and called
|
||||
the others down. Dave, the last man down, took another 200' of rope with him
|
||||
to the bottom of the second rope. Here he placed another bolt, belayed the
|
||||
rope, and vanished off into a vast, dark hole. At one stage he was abseiling
|
||||
down between the wall and a huge pinnacle, 30' high. The rope just reached
|
||||
the floor. Here a stream appeared. He followed it down a descending rift
|
||||
until, after about 50' of descent, he came to a small pitch with possibly
|
||||
another one beyond that.
|
||||
|
||||
<p>Dave prusiked back to where Rod and Vic had been waiting in the Sentry
|
||||
Box sharing both ends of a bar of Kendal Mint Cake at the same time since it
|
||||
was too hard to break. From here the operation of getting out was a smooth
|
||||
well-rehearsed exercise that they had done many times before. It took only
|
||||
just over the hour to get out onto the plateau where they were in time to
|
||||
enjoy the last few hours of sunshine.
|
||||
|
||||
<p>And Team Youth ? They came eventually, weary, dirty and dishevelled as
|
||||
usual. They had missed the sunshine. It was dark by the time they got got
|
||||
down. Team Geriatric had wined and dined and already gone to the pub.
|
||||
|
||||
<p><a href="#1978-107-7">Previous trip</a>/
|
||||
<a href="#1978-107-9">Next trip</a><hr>
|
||||
|
||||
14th August : <a name="1978-76-12">106</a> Piccying and surveying trip
|
||||
|
||||
<p>Mike, Andy and I went down 106, surveyed down to the bottom of the 100'
|
||||
pitch. Mucho Chillo. Down to the bottom of the Taproom, Andy spent hours
|
||||
trying to get his member out of his sitsling for a piss. A few piccies on
|
||||
the way out. Fairly late out to the surface, dark by the time we reached the
|
||||
van.
|
||||
|
||||
<p>Mike was not the catastrophe I expected. Doug.
|
||||
|
||||
<p><a href="#1978-76-11">Previous trip</a>/
|
||||
<a href="#1978-76-13">Next trip</a><hr>
|
||||
|
||||
15th August : 107 pushing
|
||||
|
||||
<p>Nicky and I went down a bit late (12.30) due to hanggliding. We rigged
|
||||
the 30' John and Ben had found using 3 bolts (all manky). About 100' of
|
||||
freeclibing ensued down to the Geriatric's previous far point. Due to lack
|
||||
of time, we then had to leave. Mike.
|
||||
<hr>
|
||||
|
||||
<p>16th August : <a name="1978-76-13">Eislufthöhle</a>, derigging the
|
||||
bottom, Doug, Andy.
|
||||
|
||||
<p>We initially thought that getting up was the worst bit - at 4.30 am, but
|
||||
we were to learn otherwise later. Underground by 7.40 am, a literal alpine
|
||||
start. The familiar abseil descent took just over one hour to Hall of the
|
||||
Greene King, and then we slowed down, carrying gear from the overhanging
|
||||
boulder pitch to rig the freeclimb that was alleged to follow. Abseiling the
|
||||
next pitch left large clods of mud on the descendeur and below, traversing
|
||||
started immediately, but ended at an inlet on the left. Andy tried for a
|
||||
long way at stream level, but eventually jacked and climbed up to a ledge
|
||||
where Doug had a stinky gonk. Soon arrived at the really shitty pitch which
|
||||
made a horrible mess on a rack. Not far to go now chaps - a final
|
||||
undescended pitch was reached and Andy went down to a ledge with almost no
|
||||
rope left. Lobbed rocks down the pitch - sounded like 10-15m to a muddy
|
||||
ledge, but further out seemed a lot deeper; 30-50m ? Doug repeated the
|
||||
exercise and then we set off out, derigging.
|
||||
|
||||
<p>Carrying vast piles of muddy rope over the traversing section takes quite
|
||||
a while and derigging each pitch was a serious delay. Doug's ascenders were
|
||||
slipping (nasty Petzls !) but we were soon back up the rift and got the
|
||||
rope, including the spare 75m length, into tackle bags and up to Hall of the
|
||||
Greene King. From here it was just an incredible slog out. Prusiking with a
|
||||
large tackle bag is really strenuous and Doug tackle-hauled his gear up the
|
||||
big pitch.
|
||||
|
||||
<p>Andy reached the Taproom well ahead of Doug and waited halfway up the
|
||||
next pitch, which, if we don't find a name for it soon will cause write-ups
|
||||
to be far too long, until Doug appeared below. As time was getting late,
|
||||
Doug dropped his gear and the pace increased, and so we reached the entrance
|
||||
by about 6.25 pm - Much relief. We were acutely aware of the effort of
|
||||
raising a Mega-bag 300m against its will : ie. knackered. Doug brought the
|
||||
remaining bag down to the car park.
|
||||
|
||||
<p>10¾ hours. Andy.
|
||||
|
||||
<p><a href="#1978-76-12">Previous trip</a>/
|
||||
<a href="#1978-76-14">Next trip</a><hr>
|
||||
|
||||
August 16th : <a name="1978-107-9">107 bottoming trip</a>.
|
||||
Rod, Jont, Dave, Vic.
|
||||
|
||||
<p>Well, we got off to our usual crack of dawn start (9 am) and wandered up.
|
||||
Dave and Jont went off to do a surface survey to 82, then surveyed down to
|
||||
the head of "our" pitch. The Meisterplan failed and they had an
|
||||
hour's wait here due to gross slowness in prusiking with heavy tackle
|
||||
bags....however, I run ahead...
|
||||
|
||||
<p>Rod and I went down to the previous end. I surveyed the bottom passage
|
||||
while Rod put a bolt in, then I abseiled down. Not a pleasant abseil as I
|
||||
had to stop, hang on the rope 100' down, tie the other rope on, pass the
|
||||
knot and carry on, hoping that the second rope reached the bottom. Due to
|
||||
our incredible efficiency in calculating the tackle needed, it did. Ice cold
|
||||
water all down the pitch did not help either - nor the failure of both
|
||||
electric and stinkie.
|
||||
|
||||
<p>Chap. II "The End". Well, there is a big wide rift that ends in
|
||||
a fairly conclusive choke sans draught. The water disappears down a rapidly
|
||||
lowering tight passage of the more sordid Yorkshire variety, which I followed
|
||||
to the limit of my patience (it got even smaller). Much relieved, I exitted,
|
||||
collecting a chilly Rod on the way out, who did a hero's job with 60m of wet
|
||||
12mm Marlow up the 95m pitch.
|
||||
|
||||
<p>And all in 7 hours. Geriatrics rule OK ? Vic.
|
||||
|
||||
<p><a href="#1978-107-8">Previous trip</a>/
|
||||
<a href="#1978-107-10">Final trip</a><hr>
|
||||
|
||||
August 19th : <a name="1978-107-10">107 derigging trip</a>. Andy, Ben, John, Mike, Nicky.
|
||||
|
||||
<p>Leaving Andy and Mike to come down on a piccying trip in their own sweet
|
||||
time, the deriggers of the party descended intrepidly down the cave to the
|
||||
bottom of the big shaft. Leaving Ben to disappear and pollute yet another
|
||||
recess with his yards of bog paper and other matter, John and myself
|
||||
continued resolutely down the narrow rift to derig the bottom ladders. This
|
||||
was just about completed, and we were beginning to remark on the sheer
|
||||
efficiency of the operation when a small doubt began tp filter through
|
||||
John's cold-benumbed brain. Where was the hammer ? The pitch was hastily
|
||||
rerigged, hammer was retrieved, and derigging continued. Andy and Mike made
|
||||
an appearance on the ledge at the top of the 110' pitch and tackle hauling
|
||||
up the shaft was done, passing tackle on to Andy and Mike, to ferry up the
|
||||
rift. Most of the tackle was up the rift by the time that the whole cave was
|
||||
resounding with John's frustrated Yells and Screams, as he swore at carbide
|
||||
and tackle, stuck halfway up the rift with no lights. Tackle hauling
|
||||
continued apace, with Andy ferrying several times up the ninety foot,
|
||||
oblivious of the horrendous and daunting wear in the middle of the rope,
|
||||
noticed later by Ben. John, Andy and myself sneaked up out of the pot before
|
||||
Ben and Mike had even realised that they had been left to deal with the
|
||||
remaining tackle at the bottom of the entrance pitch. While we enjoyed the
|
||||
warm sunshine, Ben sweated and swore, emerging some hours later as the sun
|
||||
was sinking. Nicky.
|
||||
|
||||
<p><a href="#1978-107-9">Previous trip</a>/
|
||||
<a href="../../plateau/107.htm">Guidebook description</a><hr>
|
||||
|
||||
<a name="1978-76-14">Eislufthöhle</a> 19th August 1978 - derigging.
|
||||
Nick, Dave, Jont, Vic, Rod, Doug.
|
||||
|
||||
<p>An alpine start by Dave and self meant we got underground before the sun
|
||||
got a bit too warm. Went down to top of big pitch where we split up; Dave
|
||||
waiting at the pitch head and with me descending to derig the next couple of
|
||||
pitches. Started out, derigging, bolt-greasing etc. as we went, and met Jont
|
||||
just below the Taproom. Started to stagger out now and met Vic and Rod on
|
||||
the last pitch of last year (we ought to have a name for it, and if we
|
||||
haven't already, then we'd better get thinking). Meanwhile, Doug had been in
|
||||
to the Taproom and exitted with a tockle bog (Full too !) A slow exit up
|
||||
Plugged Shaft with antics from Jont, his ascenders and his carbide lamp, and
|
||||
with the Bluewater being as awkward as ever. Had to abandon the crowbar.
|
||||
|
||||
<p>Out after a trip of 7½ hours (for me) and its really nice doing all
|
||||
those pitches whilst being wide awake !
|
||||
|
||||
<p><a href="#1978-76-13">Previous trip</a>/
|
||||
<a href="../1979/log.htm#1979-76-1">Next trip</a><hr>
|
||||
|
||||
<!-- LINKS -->
|
||||
<img alt=">" src="../../../icons/lists/0.gif">
|
||||
1978 Expedition info:<br>
|
||||
<img alt="--->" src="../../../icons/lists/1.gif">
|
||||
<a href="report.htm">Expo report, Cambridge Underground 1979</a><br>
|
||||
<img alt="--->" src="../../../icons/lists/1.gif">
|
||||
<a href="bcracc.htm">BCRA Caves & Caving Report</a><br>
|
||||
<img alt="--->" src="../../../icons/lists/1.gif">
|
||||
Eislufthöhle - <a href="descnt.htm">from Descent 40</a><br>
|
||||
<img alt="--->" src="../../../icons/lists/1.gif">
|
||||
Nick Thorne's write-up in <a href="782034.htm">Belfry Bulletin 366</a><br>
|
||||
<img alt="--->" src="../../../icons/lists/1.gif">
|
||||
1977/78 report from <a href="npc79.htm">NPC Journal</a><br>
|
||||
<img alt="--->" src="../../../icons/lists/1.gif">
|
||||
<a href="sponsr.htm">Sponsors</a><br>
|
||||
<img alt=">" src="../../../icons/lists/0.gif">
|
||||
<a href="../../pubs.htm#1978">Index</a> to all publications<br>
|
||||
<img alt=">" src="../../../icons/lists/0.gif">
|
||||
<a href="../../index.htm">Back to Expeditions intro page</a><br>
|
||||
<img alt=">" src="../../../icons/lists/0.gif">
|
||||
<a href="../../../index.htm">CUCC Home Page</a>
|
||||
|
||||
</body>
|
||||
</html>
|
||||
Reference in New Issue
Block a user