@ -731,6 +731,75 @@ The tag for p2018-dm-04 is in the foreground, the tackle sack is near the beginn
|
||||
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2024-07-19c">2024-07-19</div>
|
||||
<div class="trippeople"><u>Wookey</u>, Jono</div>
|
||||
<div class="triptitle">Balconhoehle - Rigging Mongol Rally</div>
|
||||
|
||||
<p>Walked up to top camp in the evening ready for trip down
|
||||
Balkonhoehle to get Mongol Raly rigged with Jono. I was somewhat
|
||||
perplexed to find no sign of Jono, and still not as it went dark. He
|
||||
eventually turned up about 10am the next morning. We had our gear to
|
||||
carry over so it wasn't a particularly early start.</p>
|
||||
|
||||
<p>I had forgotten a load of the upper passages, but did at least
|
||||
remember the obscure left turn for Honeycomb/Mongol Rally. Soon enough
|
||||
we arrived at the end of the rigging part-way down hangmans, complete
|
||||
with a rigging diag, some rope and a drill. Jono did this one,
|
||||
complaining at the bottom that the bolts didn't match the diagram,
|
||||
rigging a 2-bolt rebelay as a rather peculiar deviation. We realised
|
||||
that we were starting part-way down the rigging diagram, not the top,
|
||||
so he went back up to put it right whilst I continued to start Mongol
|
||||
Rally. Dragging the gear through was the usual faff (someone should
|
||||
just take a spade and make that crawl bigger).</p>
|
||||
|
||||
<p>So now it was my turn and I suited up with Anthony's nice new drill
|
||||
and 125m of rope. The 25m didn't quite reach across the traverse with
|
||||
a big thread round a boulder, so I put a bolt in the roof to improve
|
||||
the rigging (another one just over the hole in the floor would make
|
||||
the traverse line a lot more useful, I later realised). The rock was
|
||||
impressively cheesy, with about 20mm of goo to remove before getting
|
||||
to actual rock.</p>
|
||||
|
||||
<p>The rigging diagram suggested another bolt near the top so I added
|
||||
one about 6m down on a nose to the right, only to realise that one had
|
||||
probably already been done some previous year. I also realised at this
|
||||
point that the tape on Anthony's drill bit was set rather too short
|
||||
for reliable bolt-setting so adjusted it to give an extra 10mm of
|
||||
hole. I then added another bolt on the left, replacing one in the
|
||||
maximum rub-spot just under a lip (very odd placement). This finally
|
||||
removed all the rubs on this top slope and actually made the
|
||||
changeovers nicer, so I think it's an improvement. </p>
|
||||
|
||||
<p>Next dilemma was whether to use the bolt on a nose (with hanger
|
||||
left behind) or the reflectored bolt on the well-used muddy route. The
|
||||
nose was harder to get to but gave a nicer hang (and was suggested on
|
||||
the rigging diagram). With a sling to help the changeover it actually
|
||||
worked quite well, although maybe the obvious route would also work
|
||||
fine - there is no way of knowing without trying both and I had faffed
|
||||
enough by now. Continued down for another hour or so rigging
|
||||
rebelays. The rigging guide is accurate. Hummed and hawed some more at
|
||||
the odder bits of rigging trying to work out what 'better' might look
|
||||
like. Left one bit (with a nearly horizontal deviation) some extra
|
||||
rope to come back to and add a bolt if time allowed but pressed on
|
||||
until the rope ran out, just on the same ledge that had had a knot
|
||||
pass in 2022. Looks like that is where 100m gets you to.</p>
|
||||
|
||||
<p>We were out of time so called it a day and headed off out, only
|
||||
realising on the way out that the rope bag we had left contained a
|
||||
note 'top of mongol rally' in it so we had used the wrong one (misled
|
||||
by the '25m' rope in the top matching the '25m' rope marked on the
|
||||
topo for the traverse. Oh well.</p>
|
||||
|
||||
<p>Got out around 11:30, having had a very satisfying trip, Jono had
|
||||
finally got underground and enjoyed himself. It was a chill trip with
|
||||
almost zero stress, and we'd done enough to make a camping trip
|
||||
feasible next time.</p>
|
||||
|
||||
<div class="timeug">T/U: 10.5 hours</div>
|
||||
<div class="editentry"><br /><a href="/logbookedit/2024-07-19c">Edit this entry</a><br /></div>
|
||||
|
||||
<hr />
|
||||
|
||||
<div class="tripdate" id="2024-07-20a">2024-07-20</div>
|
||||
<div class="trippeople"><u>PS</u>,Christian,Colin,Harry,</div>
|
||||
<div class="triptitle">Bascamp - New arrivals</div>
|
||||
|
Loading…
Reference in New Issue
Block a user