plumbing in the QMs page a bit more thoroughly

This commit is contained in:
2020-01-05 18:31:14 +00:00
parent d954a7e8dd
commit 298778bedd
3 changed files with 22 additions and 10 deletions

View File

@@ -27,9 +27,10 @@ draw only what was recorded faithfully in the cave. If this makes your
drawing look bad - record more next time! If things really are unclear,
consider taking a copy of this drawing back into the cave to clarify it.</p>
<p>Drawing a cave is not easy but anyone can learn to do it.
Read the brief <a href="XI-2-11.pdf">Cave Mapping - Sketching the Detail"</a>
5-page llustrated guide by Ken Grimes which makes everything clear.
<h3>Preparing input into to Tunnel or Therion</h3>
[to be written] - See <a href="newcave.html#therion">
drawing around the centre-line</a>
<p>The actual published cave-survey is produced by software these days.
<p>Make sure the drawing clearly shows the point of connection to previous
surveys (look at the relevant drawing in the old survey book to ensure the
@@ -39,6 +40,13 @@ of any new question marks, with an estimate of quality and any difficulties
which will be encountered (eg. if it is a climb, are bolts going to be
needed ? If a dig, is it a few loose boulders or a crawl over mud?)</p>
<h3>Archaic: hand-drawing the final survey</h3>
<p>Drawing a cave entirely by hand is not easy but anyone can learn to do it.
Read the brief <a href="XI-2-11.pdf">Cave Mapping - Sketching the Detail"</a>
5-page llustrated guide by Ken Grimes which makes everything clear. For preliminary exploration (Grade 1 surveys) this is still appropriate.
<p>CUCC use a set of symbols pretty close to the standard ones promulgated
by the BCRA, with occasional differences - such as large-enough boulders
which are sketched to scale using the US symbol. The current state of