diff --git a/cave_data/1623-107.html b/cave_data/1623-107.html
index e175c374d..d1283720d 100644
--- a/cave_data/1623-107.html
+++ b/cave_data/1623-107.html
@@ -131,10 +131,10 @@ a rebelay roughly halfway. This drops directly into the rift reached by the orig
disappears into the choked floor of this rift via a nasty wet crawl, rapidly becoming too small.
1978 (grade 5) survey 1978 (grade 5) survey
and also
-*ref 1999#23
-
Extended Elevation of 148 and 81 (2012):
-
+
Plan of 148 (2012):
-
+
Area plan, showing 81, 82, 107, 148, 1987-02, 2006-06 and 2006-76 (2012):
-
-There is also a 1980s survey area plan, drawn at 1:2000, showing 145, 82 and 148 on Gauß and Krüger
+
+There is also a 1980s survey area plan, drawn at 1:2000, showing 145, 82 and 148 on Gauß and Krüger
coordinates.
From the entrance (roomy and dry enough to leave surface gear), take the larger, R stooping passage (L passage runs parallel to this and re-joins at the entrance pitch) to reach the entrance pitch series (RIG02 - see rigging guide). This starts as a short, sloping drop which lands at a bridge. From here a second short drop reaches 2 ledges in a much larger shaft. Below these ledges traverse out to the longest hang. This is always wet and responds rapidly to rain, quickly becoming unpleasant and it can be impassable. This drops down with a deviation to a large, loose, drippy ledge. Traverse out to the final short drop to reach a spacious chamber at the bottom of the entrance pitch series called Room With A View. (An emergency dump - bothy, stove, food, etc. - should be left here in case returning cavers find the entrance pitch series too wet to ascend).
- -(Three passages off to the N of Room With A View lead to Levitation and Crushed Plumbs, see separate description below). From the base of the pitch go to the high point of the chamber then descend to the far side along the R wall of the chamber, past some large boulders, (The small passage leading down the boulder slope back under the pitch leads to the DigDug area, see separate description).
Levitation, Dig Dug and Crushed Plumbs
diff --git a/cave_data/1623-267.html b/cave_data/1623-267.html index 4ecaa40fc..c8c08a600 100644 --- a/cave_data/1623-267.html +++ b/cave_data/1623-267.html @@ -50,7 +50,7 @@ Some old notes seem to refer to it as 2007-76.- Plan, drawn 2015 +Plan, drawn 2015 There are two skylight entrances. These have been noted from the inside, but not located on the surface and not descended, thus they have not been allocated letters. diff --git a/cave_data/1623-81.html b/cave_data/1623-81.html index 5fc748b5a..c0bda5392 100644 --- a/cave_data/1623-81.html +++ b/cave_data/1623-81.html @@ -27,9 +27,9 @@
Extended Elevation of 148 and 81 (2012):
-
+
Area plan, showing 81, 82, 107, 148, 1987-02, 2006-06 and 2006-76 (2012):
-
+
Compare with original Grade 1 extended elevation in Cambridge Underground expedition report