Fix unparseable place titles

This commit is contained in:
2023-09-04 19:45:49 +03:00
parent 5282c45515
commit 08b32e099d

View File

@@ -145,8 +145,8 @@ someone mentioned caving and all the parties changed.
<div class="tripdate" id="1979-07-31b">1979-07-31</div> <div class="tripdate" id="1979-07-31b">1979-07-31</div>
<div class="trippeople">Nick Thorne, <u>Tony Malcolm</u>, </div> <div class="trippeople">Nick Thorne, <u>Tony Malcolm</u>, </div>
<div class="triptitle"><a id="id1979-76-1">Eislufth&ouml;hle</a> - 1623/106</div> <div class="triptitle">Eislufth&ouml;hle - 1623/106</div>
<br /><br />I got the short straw and ended up in the caving team. (Andy W asked me to <a id="id1979-76-1">Eislufth&ouml;hle</a><br /><br />I got the short straw and ended up in the caving team. (Andy W asked me to
mention that he carried the Bluewater up to the cave.) I'm writing this in mention that he carried the Bluewater up to the cave.) I'm writing this in
Bar Fischer, looking across at this bird wearing tight white jeans ... Bar Fischer, looking across at this bird wearing tight white jeans ...
phew&nbsp;! God, I must concentrate. Got underground, rigged the snow slope with a phew&nbsp;! God, I must concentrate. Got underground, rigged the snow slope with a
@@ -157,12 +157,14 @@ differently. The snow platform had disappeared. At least the first two
rebelays of last year are buried in about 4' of snow. More rebolting will be rebelays of last year are buried in about 4' of snow. More rebolting will be
needed, and we had no driver or anchors, hence lack of complete penetration needed, and we had no driver or anchors, hence lack of complete penetration
(LCP). (LCP).
<br />
<br />
<br /><br />Walked off the plateau after a <div class="timeug">1 hour</div> trip. Whilst walking off, Tony <br /><br />Walked off the plateau after a <div class="timeug">1 hour</div> trip. Whilst walking off, Tony
noticed the huge phreatic entrance passed on the walk in. Small passage led noticed the huge phreatic entrance passed on the walk in. Small passage led
off from back of above, possible draught, but semi-blocked by boulder - off from back of above, possible draught, but semi-blocked by boulder -
should yield to a hammer and needs looking at. should yield to a hammer and needs looking at.
<br />
<br />
<br /><br />Nick <br /><br />Nick
<div class="timeug">T/U: 0.0 hours</div> <div class="timeug">T/U: 0.0 hours</div>
<div class="editentry"><br /><a href="/logbookedit/1979-07-31b">Edit this entry</a><br /></div> <div class="editentry"><br /><a href="/logbookedit/1979-07-31b">Edit this entry</a><br /></div>
@@ -225,11 +227,13 @@ pretty bad.
<div class="tripdate" id="1979-08-02a">1979-08-02</div> <div class="tripdate" id="1979-08-02a">1979-08-02</div>
<div class="trippeople">Nick Thorne, <u>Julian Griffiths</u>, </div> <div class="trippeople">Nick Thorne, <u>Julian Griffiths</u>, </div>
<div class="triptitle"><a id="id1979-76-3">Eislufth&ouml;hle - camped at col</a></div> <div class="triptitle">Eislufth&ouml;hle - camped at col</div>
<a id="id1979-76-3">Eislufth&ouml;hle camped at col</a>
<br /><br />Having camped the previous evening at the col we were underground by 7.00 <br /><br />Having camped the previous evening at the col we were underground by 7.00
am. Got about 15m below the last rebelay in Plugged Shaft and placed an airy am. Got about 15m below the last rebelay in Plugged Shaft and placed an airy
bolt on the left hand wall - no ledges in sight. bolt on the left hand wall - no ledges in sight.
<br />
<br />
<br /><br />15-20m below this we found one of last year's bolts and so rigged the <br /><br />15-20m below this we found one of last year's bolts and so rigged the
final section of Plugged Shaft. Thrashed on down, rigging as we went until final section of Plugged Shaft. Thrashed on down, rigging as we went until
we reached the top of the 55m pitch. As we wanted to put a bolt in at the we reached the top of the 55m pitch. As we wanted to put a bolt in at the