<tr><td><ahref="/years/1977/andylg.htm#id1977-76-1">08.15</a></td><td> Andy W, Nick enter 106, find Plugged Shaft, 106A, 106B (1½ hrs)</td></tr>
<tr><td><ahref="/years/1977/andylg.htm#id1977-76-2">08.16</a></td><td> Nick, Simon, Andy W to -75m (3 hrs)</td></tr>
<tr><td><ahref="/years/1977/andylg.htm#id1977-76-3">08.17</a></td><td> Andy W, Simon, Nick mostly rerigging (6 hrs)</td></tr>
<tr><td><ahref="/years/1977/andylg.htm#id1977-76-4">08.20</a></td><td> Andy W, Simon, Nick to -110m, through choke and find Keg series (7 hrs)</td></tr>
<tr><td><ahref="/years/1977/andylg.htm#id1977-76-5">08.21</a></td><td> Andy W, Simon, Nick explore Keg Series, find Follow-Through to -135m (7 hrs)</td></tr>
<tr><td><ahref="/years/1977/andylg.htm#id1977-76-6">08.22</a></td><td> Andy W, Simon, Nick reach the Taproom -150m and derig to -75m (7 hrs)</td></tr>
<tr><td><ahref="/years/1977/andylg.htm#id1977-76-7">08.24</a></td><td> Rod Leach, Simon, Nick derig to surface</td></tr>
<tr><td><ahref="/years/1978/log.htm#id1978-76-5">08.03</a></td><td> Simon, Andy W SRT rig to Saved Shaft (7 hrs)</td></tr>
<tr><td><ahref="/years/1978/log.htm#id1978-76-6">08.04</a></td><td> Doug, Andy W into new ground at -150m (6/5½ hrs)</td></tr>
<tr><td><ahref="/years/1978/log.htm#id1978-76-7">08.05</a></td><td> Doug, Simon very little progress</td></tr>
<tr><td><ahref="/years/1978/log.htm#id1978-76-8">08.07</a></td><td> Doug, Simon rerig and some new pitch</td></tr>
<tr><td><ahref="/years/1978/log.htm#id1978-76-9">08.08-9</a></td><td> Julian, Nick 115m new depth overnight to Balcony (10½ hrs)</td></tr>
<tr><td><ahref="/years/1978/log.htm#id1978-76-10">08.09-10</a></td><td> Andy, Doug into Hall of the Greene King and boulder pitch (12¼ hrs)</td></tr>
<tr><td><ahref="/years/1978/log.htm#id1978-76-11">08.12-13</a></td><td> Nick, Julian, Simon overnighter down Fiesta Run (then crashed car)</td></tr>
<tr><td><ahref="/years/1978/log.htm#id1978-76-12">08.14</a></td><td> Andy W, Doug, Mike S survey and photo (7 hrs)</td></tr>
<tr><td><ahref="/years/1978/log.htm#id1978-76-13">08.16</a></td><td> Andy W, Doug derig to Taproom (10¾ hrs)</td></tr>
<tr><td><ahref="/years/1978/log.htm#id1978-76-14">08.19</a></td><td> Nick, Dave F, Jont, Vic, Rod, Doug derig to surface (7½ hrs or less)</td></tr>
<tr><td><ahref="/years/1979/log.htm#id1979-76-4">08.03</a></td><td> Ben, Andy W (10 hrs), Tony (6 hrs ?) rerigging and find Gents' pitch route</td></tr>
<tr><td><ahref="/years/1979/log.htm#id1979-76-5">08.05</a></td><td> Nick, Julian into new ground and a side lead to -400m (9 hrs)</td></tr>
<tr><td><ahref="/years/1979/log.htm#id1979-76-6">08.06</a></td><td> Ben, Andy W reorganise gear and push main way to -385m (11 hrs)</td></tr>
<tr><td><ahref="/years/1979/log.htm#id1979-76-7">08.07</a></td><td> Simon F (11¾ hrs), Simon K (12¾ hrs) tourist to end and some rerigging</td></tr>
<tr><td><ahref="/years/1979/log.htm#id1979-76-8">08.08</a></td><td> Nick, Julian derig side lead, push to within sight of end of Madlmeierschacht (8 hrs)</td></tr>
<tr><td><ahref="/years/1979/log.htm#id1979-76-9">08.08</a></td><td> Andy W, Tony unsuccessful surveying trip (5 hrs)</td></tr>
<tr><td><ahref="/years/1979/log.htm#id1979-76-10">08.10</a></td><td> Ben, Andy W bit of rerigging then aborted due to wet (6 hrs)</td></tr>
<tr><td><ahref="/years/1979/log.htm#id1979-76-11">08.13</a></td><td> Julian, Andy W, Ben, Simon F, Nick push to bottom and derig to HotGK (14-16 hrs)</td></tr>
<tr><td><ahref="/years/1979/log.htm#id1979-76-12">08.14</a></td><td> Tony, Andy C, Simon K derigging (6 hrs)</td></tr>
<tr><td><ahref="/years/1979/log.htm#id1979-76-13">08.15</a></td><td> Nick, Simon F, Ben, Julian, Andy C final derig (6½ hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-07-14B">07.14</a></td><td> Jenny: Locate entrance, bolt+rig to head of Draught Bitter (3½ hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-07-17A">07.17</a></td><td> Jenny, OllyB: bolting, rigging and surveying in Plugged Shaft (6½ hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-07-18C">07.18</a></td><td> OllyB, Jenny: Surveying Draft Bitter and 76b (3 hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-07-19D">07.19</a></td><td> Jenny, OllyB: Discover Brave New World, survey The Test Tubes (8 hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-07-22D">07.22</a></td><td> Jenny, OllyB: Bolt and survey Lovers Leap (5½ hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-07-24B">07.24</a></td><td> OllyB, Jenny: Rig rest of Plugged shaft, Saved Shaft and into Keg Series (10 hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-07-25B">07.25</a></td><td> OllyB, Jenny: Surveying horizontal stuff in Brave New World (6 hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-07-26B">07.26</a></td><td> OllyB, Jenny: Brave New World, surveying horizontal stuff and descending A* pitch (11 hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-07-27C">07.27</a></td><td> OllyB, Jenny: Surveying in Brave New World (4¾ hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-07-29A">07.29</a></td><td> Jenny: Gear retrieval from Brave New World (1½ hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-07-30C">07.30</a></td><td> OllyB, Jenny: Bolt+survey down Keg Series to sump, survey along Razor Prance (12 hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-08-01B">08.01</a></td><td> OllyB, Jenny: Bolt down to Taproom, surveyed and de-rigged to bottom of Plugged Shaft (10 hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-08-03B">08.03</a></td><td> OllyB, Jenny: Survey Forward to the Past, and into All Ways Chamber from Brave New World (10½ hrs)</td></tr>
<tr><td><ahref="/years/2004/logbook.html#t2004-08-04C">08.04</a></td><td> OllyB (13¼ hrs), Jenny (13¾ hrs): Bolt and survey down Fault Pitch then survey The Boiling Tubes from Brave New World. De-rig everything left. </td></tr>
<tr><td><ahref="/years/2005/logbook.html#t2005-07-27A">07.27</a></td><td> Jenny, Olly (both 12 hrs), Dave (11½ hrs): Rigging to the Tap Room, and Adventures in Time and Space connection to Keg Series.</td></tr>
<tr><td><ahref="/years/2005/logbook.html#t2005-07-30B">07.30</a></td><td> Jenny, Olly: Rebelay failure in Plugged Shaft (1½ hrs).</td></tr>
<tr><td><ahref="/years/2005/logbook.html#t2005-07-31A">07.31</a></td><td> OllyB, Jenny, Dave: Rigging to Spent Ledge, tourist in Brave New World (11 hrs)</td></tr>
<tr><td><ahref="/years/2005/logbook.html#t2005-08-05B">08.05</a></td><td> OllyB, Jenny: Pleasant but Pointless, in Brave New World (9½ hrs)</td></tr>
<tr><td><ahref="/years/2005/logbook.html#t2005-08-07A">08.07</a></td><td> Jenny, OllyB: Batman and Pancake Chips in Brave New World (11 hrs)</td></tr>
<tr><td><ahref="/years/2005/logbook.html#t2005-08-10E">08.10</a></td><td> Jenny, OllyB: Loopy in Brave New World (12½ hrs)</td></tr>
<tr><td><ahref="/years/2005/logbook.html#t2005-08-11C">08.11</a></td><td> OllyB, Jenny: Keg Series derigging (6½ hrs)</td></tr>
<tr><td><ahref="/years/2005/logbook.html#t2005-08-12A">08.12</a></td><td> OllyB, Jenny: 1970's route, rigging and surveying down from spent ledge. Derigged out to Boulder Chamber (10 hrs)</td></tr>
<tr><td><ahref="/years/2005/logbook.html#t2005-08-13A">08.13</a></td><td> Jenny, OllyB: Final derig (3¾ hrs)</td></tr>