2004-10-08 19:00:30 +01:00
|
|
|
<html>
|
|
|
|
<head><title>2004 Expo Logbook</title></head>
|
|
|
|
<link rel="stylesheet" type="text/css" href="../../css/main2.css" />
|
|
|
|
<body>
|
|
|
|
|
|
|
|
<h1>Expo 2004</h1>
|
|
|
|
|
2004-10-09 14:55:20 +01:00
|
|
|
<!-- <d> = date; <w> = who; <t> = trip title; <g> = time underGround, <b> = definition of new passage name. -->
|
2004-10-08 19:00:30 +01:00
|
|
|
|
|
|
|
<d>5/7/04</d> <w><u>Mark S</u>, Olly M et al</w> <t>In Cambridge</t>
|
|
|
|
|
|
|
|
<p>And so it was that at 12.41 on Monday 5th July did the weighbridge at Madingley Mulch pronounce one white Citroën C15D van, by the
|
|
|
|
registration mark of L852 MFL, to be 400kg overweight – weighing in at nearly two tonnes. Mark and Olly were not best pleased, the
|
|
|
|
previous days and morning having been spent cramming Expo goods into every nook and cranny about the van.</p>
|
|
|
|
|
|
|
|
<p>It was a combination of the appaling handling and the measly < 1cm of suspension clearance at the rubber stop which persuaded us to
|
|
|
|
have the van weighed. It was cearly far more overweight than in previous years – so much so that it was more than 200kg over the
|
|
|
|
total maximum load on the tyres!</p>
|
|
|
|
|
|
|
|
<p>We returned to the Tackle Store having summoned Martin and Dave, and soon began the tedious task of emptying about 300kg of shit out of
|
|
|
|
the van – each item being monotonously weighed on Martin's bathroom scales. Many, many phone calls ensued and after various silly
|
|
|
|
plans (including driving to Expo and then coming back the next day for a second load, utilising a cheap day return on the ferry from
|
|
|
|
Calais!) we settled on a haulier who would transport it to Munich for 300 quid. Not too bad in fact, given it would cost well over 200
|
|
|
|
quid to do the two-drives plan. (In fact, subsequently a cheaper company were found.) We declined one company's quote of three thousand
|
|
|
|
pounds, refilled the van with lighter items and set off for Milton Tesco's, to collect journey food. At about 5.40pm all was ready (minus
|
|
|
|
the various tasks which we hadn't had time to do due to the massive hiatus). We set off for Earl's place and arrived without mishaps,
|
|
|
|
planning to leave for Dover at 4am. Expo had begun.</p>
|
|
|
|
|
|
|
|
<d>6/7/04</d> <w><u>Mark S</u>, Olly M</w> <t>Driving to Austria</t>
|
|
|
|
|
|
|
|
<p>Arose at 3.30pm and left Earl's place just after five past four on Tuesday morning. The ferry was at 6am and we arrived just at the
|
|
|
|
right time after a stop for fuel. (Got to the port around 5.20am.)</p>
|
|
|
|
|
|
|
|
<p>The ferry was on time and we set off about 8.20am French time onto the motorway. Driving in shifts, there were no mishaps until Mark's
|
|
|
|
shift around Nürnburg.</p>
|
|
|
|
|
|
|
|
<p><i>[The Nürnburg incident, which apparently involved a high-speed emergency stop with inadequate brakes, never got written up in
|
|
|
|
the enormous space left for it on the page.]</i></p>
|
|
|
|
|
|
|
|
<d>6/7/04</d> <w><u>Dave</u></w> <t>Dave's trip out</t>
|
|
|
|
|
|
|
|
<p>All went v. smoothly; up at 3am (ouch!), coach to Stansted, Ryanair to Salzburg, tram, train etc to arrive at Bad Aussee at around 3pm.
|
|
|
|
Bus timetable appears to be beyond the comprehension of mere mortals, so I walked. Then fell asleep, woke up and spent four hours watching
|
|
|
|
German TV. (Something important has happened to the state governor of Steiermark, but I have no idea what.)</p>
|
|
|
|
|
|
|
|
<d>7/7/04</d> <w>Olly M, Mark and <u>Dave</u></w>
|
|
|
|
|
|
|
|
<p>Walked up hill. Snow level very high. Had considerable fun hauling gear out of Traungold (caving gear + some digging were needed).</p>
|
|
|
|
|
|
|
|
<g>T/U: Dave 1hr</g>
|
|
|
|
|
|
|
|
<d>8/7/04</d> <w>Olly M, Mark and <u>Dave</u></w>
|
|
|
|
|
|
|
|
<p>More getting stuff out of snow-choked holes.</p>
|
|
|
|
|
|
|
|
<g>T/U: Olly M 1hr</g>
|
|
|
|
|
|
|
|
<d>10/7/04</d> <w><u>Dave</u>, Olly M</w> <t>204A rigging</t>
|
|
|
|
|
|
|
|
<p>Rigged down to bottom of A ent pitch. Owing to lack of rope we didn't get any further than that + ran out of excuses for walking
|
|
|
|
downhill in the rain.</p>
|
|
|
|
|
|
|
|
<g>T/U: Dave 1.25hrs Olly 0.75hrs</g>
|
|
|
|
|
|
|
|
<d>??</d> <w><u>Julia</u> and Anthony...</w> <t>..are here</t>
|
|
|
|
|
|
|
|
<p>Det er veldig variskelig â snakke [illegible]. Men jeg mâ prøve. We left Anthony's office at 3.00pm on Friday (I
|
|
|
|
remembered the guitar). Getting out of Norge not easy, but achieved eventually. 6 hours Oslo to Gøteborg. Then lots more hours
|
|
|
|
through Sweden, Denmark and Germany. Sweden + Germany go on far too long especially. Our stereo died, but it only cost 20 NOK so it's fair
|
|
|
|
enough. No traffic jams once outside Sweden. It took ages, Dour ate lots of chocolate, I didn't fall asleep too much, Expo is great + so
|
|
|
|
is Gösser.</p>
|
|
|
|
|
|
|
|
<p><i>[In different pen and Dour's handwriting]</i>I say chaps, it's a dashed long way from Oslo to expo, what?</p>
|
|
|
|
|
|
|
|
<d>13/7/04</d> <w><u>Julia</u></w>
|
|
|
|
|
|
|
|
<p>Oh, so caving songs get written in the rain, right. Well, plenty of rain here, so let's have some inspiration. There's Duncan's first
|
|
|
|
bit:</p>
|
|
|
|
|
|
|
|
<blockquote>
|
|
|
|
When I first came to Cambridge I was only 18<br />
|
|
|
|
With a fiver in my pocket and my old dangly bag<br />
|
|
|
|
So I went down the Panton to check out the scene<br />
|
|
|
|
But I soon ended up as a beardy old lag.
|
|
|
|
</blockquote>
|
|
|
|
|
|
|
|
<p>Still Duncan:</p>
|
|
|
|
|
|
|
|
<blockquote>
|
|
|
|
When the Mornflake + the Tunnocks bars were stacked in great piles<br />
|
|
|
|
With the old Expo trailer we would drag them for miles
|
|
|
|
</blockquote>
|
|
|
|
|
|
|
|
<p>Then me:</p>
|
|
|
|
|
|
|
|
<blockquote>
|
|
|
|
To the arse-end of Austria we carted our load<br />
|
|
|
|
Knowing free schapps awaited at the end of the road
|
|
|
|
</blockquote>
|
|
|
|
|
|
|
|
<p><strong>INSPIRATION NEEDED HERE</strong></p>
|
|
|
|
|
|
|
|
<p>Last verse:</p>
|
|
|
|
|
|
|
|
<blockquote>
|
|
|
|
And now I am lying here, I ain't had no booze<br />
|
|
|
|
I've been pushing and caving, and I'm all sore and bruised<br />
|
|
|
|
I feel like I'm dying, and I wish I could beg<br />
|
|
|
|
For a stretcher to carry me to old base camp.
|
|
|
|
</blockquote>
|
|
|
|
|
|
|
|
<d>12/7/04</d> <w><u>Jenny</u> + Olly B</w>
|
|
|
|
|
|
|
|
<p>We set off for our 3<sup>rd</sup> carry to Top Camp, and for the first time it wasn't raining. As we got to TC it got much darker, and
|
|
|
|
just as we started pitching the big expo tent it started to hail horizontally which was really quite grim... Eventually we got the tent up
|
|
|
|
and went to look for Eislufthöhle (76), Olly knew where it was, but couldn't remember quite how to get there so we walked around a
|
|
|
|
lot in the erratic boulders just below where 76 turned out to be.</p>
|
|
|
|
|
|
|
|
<d>13/7/04 <w><u>Jenny</u> + Olly B</w>
|
|
|
|
|
|
|
|
<p>Carried up our final load to TC, noticed that the tent had lots of big puddles. Perhaps optimistically, I assumed it had come into the
|
|
|
|
tent whilst we erected it in the hail storm, so I bailed out the water + we set off for 76, armed with a GPS. We got the [illegible] the
|
|
|
|
GPS point and wandered around and found 97 which still had paint marking it. This gave us an idea of where 76 was which we then found.
|
|
|
|
About 50m from 76, towards the ridge, was a very very good potential bivvy site – a big arched entrance maybe 15m across and 1.5m
|
|
|
|
high with a snow patchand a skylight. Probably room for ~6 people without too much rock moving + more people with more work, quite
|
|
|
|
sheltered as well as it opens out into a small sheltered valley (with room for a small tent). We walked back to TC laying cairns as we
|
|
|
|
went.</p>
|
|
|
|
|
|
|
|
<d>14/7/04</d> <w><u>Jenny</u> + Olly B</w>
|
|
|
|
|
|
|
|
<p>Woke up to find just how un-waterproof the tent was – lots of leaks through the ceiling and 3 puddles a couple of inches deep,
|
|
|
|
wet sleeping bags and other wet stuff which wasn't nice at all. Eventually got going after a short delay to dry out the lighter before we
|
|
|
|
could make breakfast. We walked back to 76 carrying lots of gear to relook at the bivvy with a view to actually using it – and it
|
|
|
|
looked a whole better <i>[sic]</i> than the tent. We carreid another load from TC adding more cairns as we went.</p>
|
|
|
|
|
|
|
|
<p>Olly taught me how to bolt by demonstrating to drill a tag spit for 97, then I put ones in for tags for 76 and 76b (76a was already
|
|
|
|
tagged). Then I went underground in the 76a entrance, it goes approximately horizontally for about 15m over a step on the way, there was
|
|
|
|
quite a lot of soft snow on the floor but no ice visible till near the pitch, where there was a small ice-shell. The pitch continues down
|
|
|
|
below where the 76 ent shaft comes in (but this looked too loose to be worth using). I placed my first two underground bolts, then looked
|
|
|
|
round the corner and saw an old spit which suggested that in the 70s the snow level was higher. I carried on down the sloping gully with
|
|
|
|
snow on the floor, the gully flattened out to a ledge with loose rocks. Just round the corner was a nice looking 10-20m pitch which looked
|
|
|
|
to land on a big snow ledge. Time was running out so I came back up and added a bolt to the top to make the rope hang in a nicer place.
|
|
|
|
Then we got changed and walked back to the car via TC to collect our wet sleeping bags to dry them. On the way back we realised that
|
|
|
|
Olly's GPS was still getting a fix by the bivvy... Oh, whilst I was caving Olly cairned a path from the bivvy to the 204 path.</p>
|
|
|
|
|
|
|
|
<g>T/U Jenny 3.5hrs</g>
|
|
|
|
|
|
|
|
<p>3rd verse</p>
|
|
|
|
|
|
|
|
<blockquote>
|
|
|
|
Oh, the chill winds at night through the bivvy would blow<br />
|
|
|
|
But there were boys at the stone bridge to guide you below<br />
|
|
|
|
If you didn't fancy caving you could go and get drunk<br />
|
|
|
|
There was always lots of festering down at old base camp
|
|
|
|
</blockquote>
|
|
|
|
|
|
|
|
<d>14/7/04</d> <w><u>Dave</u>, Olly M, Stuart, Dour</w> <t>Ariston rigging</t>
|
|
|
|
|
|
|
|
<p>Wandered in down 204A re-rigging on Dave Brindle's rope. Dour put in a bolt enabling me to get close enough to the 2nd pitch to see
|
|
|
|
that it was open, which was a pleasant surprise seeing how much snow was around generally. At this point Dour returned to the surface
|
|
|
|
while Olly, Stuart and I wandered down Ariston. Ran out of rope at Steel Toecap and headed out.</p>
|
|
|
|
|
|
|
|
<g>T/U Dave, Olly, Stuart 6.5hrs, Dour 1hr</g>
|
|
|
|
|
|
|
|
<d>15/7/04</d> <w><u>Olly M</u>, Stuart, Peter</w> <t>204E rigging</t>
|
|
|
|
|
|
|
|
<p>Had much difficulty finding the entrance, it was further than I remembered. Took ages to rig the pitch, then went out.</p>
|
|
|
|
|
|
|
|
<g>T/U Olly, Stuart, Pete 2.5hours</g>
|
|
|
|
|
|
|
|
<d>15/7/04</d> <w><u>Dave</u>, Mark D, Nial</w> <t>Kiwi Suit rigging</t>
|
|
|
|
|
|
|
|
<p>Continued rig down bottom pitch of Ariston (which is shite) and 54m pitch in Kiwi Suit. Realising we had only three hangers left, we
|
|
|
|
put in the next 8m pitch but didn't descend, + buggered off out. Nial + Mark apparently got lost in the crawls at the bottom of
|
|
|
|
Wolpertinger Way and were out an hour after I was; I really ought to have hung around to point out the route – sorry guys, but I was
|
|
|
|
cold + knackered + wanted to go downhill.</p>
|
|
|
|
|
|
|
|
<p><i>[Mark D's handwriting]</i> Scientific note: air temp measured at Pot-U-Like 2°C.</p>
|
|
|
|
|
|
|
|
<g>T/U Dave 5.5hrs, Nial, MarkD 6.5</g>
|
|
|
|
|
|
|
|
<d>18/7/04</d> <w>Dour, <u>Mark D</u></w> <t>Razor Dance rigging</t>
|
|
|
|
|
|
|
|
<p>Early start – underground by 10:00! Speedy descent to Kiwi Suit, where we picked up the bag of rope left on the 15th. We now had
|
|
|
|
3 1/2 bags of rope between us, which was considered A LOT. Mark rigged the bottom 2 pitches of Kiwi Suit, then Dour took up the cudgels
|
|
|
|
and proceeded to rig Razor Dance down to the 2002 limit – the Steady Now pitch. Left the rest of the rope at that point and turned
|
|
|
|
round at 16:00. Uneventful ascent, Mark D out at 19:45, Dour 21:15. Dour must buy a magic foot jammer!</p>
|
|
|
|
|
|
|
|
<p>Scientific note: the gravel in the crawl between Ariston + Kiwi Suit is very interesting and is in different sizes in different
|
|
|
|
passages, which gives some indication of the water flow during phreas. This should be (a) recorded and (b) taped off to avoid damage.
|
|
|
|
MSD.</p>
|
|
|
|
|
|
|
|
<g>TU Mark 10hrs Dour 11.25hrs</g>
|
|
|
|
|
|
|
|
<d>16/7/04</d> <w>Jenny, <u>Olly B</u></w>
|
|
|
|
|
|
|
|
<p>We bolted on down from the head of Draught Bitter (where the draught was so fierce it made my eyes water while drilling a hole for a
|
|
|
|
bolt). A deviation off a 70s spit got us to a little rock bridge, and a rebelay off another unusually well preserved and flush 70s spit to
|
|
|
|
the "rock bridge lead". Rebelay off a natural spike (shape enhanced with a bolt hammer), and we're at our first lead. I poked out the
|
|
|
|
looser rocks, and peered down into a serpentine rift below. I put in a spit, gardened more, and squeezed in, Jenny feeding rope from above
|
|
|
|
(the bag was too fat). Along the rift, an aven intersects, and goes down a shaft. Another spit, and another awkward squeeze, and I dropped
|
|
|
|
the pitch, but it was blind. Back up, and the rift seems to form a U, both ends look like the end at snow slopes, presumably out on the
|
|
|
|
pitch (though we're yet to confirm this). We ascend to the rock bridge, and head on down. I can see a ledge which will keep us away from
|
|
|
|
falling snow & rocks, but after two spits I'm still not there and my legs are losing feeling. Jenny is cold too so we exit.</p>
|
|
|
|
|
|
|
|
<d>17/7/04</d> <w>Olly + <u>Jenny</u></w>
|
|
|
|
|
|
|
|
<p>Back down 76 again, this time it's my turn to bolt. I get down to the bolts Olly put in yesterday (after adding a spit for a deviation
|
|
|
|
on the way down to stop the rope cutting through the big snow plug), and spend quite a while swinging around trying to work out what is
|
|
|
|
attached to what (tacklesack, hangers, deviation...). Eventually I sorted it all out and follow Olly's advice to rig the deviation as a
|
|
|
|
rebelay temporarily to enable me to swing onto the ledge more easily. The rebelay was all exciting and wide and free-hanging, but I
|
|
|
|
managed to cope, then just as I start to swing I noticed the rope would rub, so had to go back up, pass the rebelay, add an extra maillon,
|
|
|
|
pass the rebelay and start swinging.</p>
|
|
|
|
|
|
|
|
<p><i>[Diagram of a stick-Jenny attempting to swing onto a ledge]</i></p>
|
|
|
|
|
|
|
|
<p>I landed on the ledge and did some gardening of rocks, which boomed lots and made the ledge feel really rather exposed. Olly was
|
|
|
|
complaining about the cold so I put in a bolt rather too quickly and he came down to the ledge. Olly took over the bolting so he could
|
|
|
|
warm up, and started a traverse along from the ledge, passing a small lead up a tube on the left. Down and across a bit I think (I
|
|
|
|
couldn't really see from where I was). After warming up outside + drinking some hot chocolate, we returned to survey from the A entrance
|
|
|
|
to the pitches (draft bitter). Then returned to BC, racing darkness + an electrical storm.</p>
|
|
|
|
|
|
|
|
<g>Total TU 6.5hrs</g>
|
|
|
|
|
|
|
|
<d>5/7/04</d> <w><u>Martin</u></w>
|
|
|
|
|
|
|
|
<p>I was phoned, "There is a problem", "Please bring your bathroom scales", "400kg overweight", "bollocks" (thought Martin).
|
|
|
|
Solutions ...another car ... too crap .. another trailer ... too long ... DSL ... too expensive ...</p>
|
|
|
|
|
|
|
|
<p>After some time trying to find someone to fit a tow bar to Mark's van for a non-existent trailer, a haulier was found to transport from
|
|
|
|
Newton Hall to Munich. This required me to find cardboard boxes, twenty minutes after the bloke came to collect them.</p>
|
|
|
|
|
|
|
|
<p>The next day Fast Freight hauliers gave a better quote. If I measured the height, width and girth of the pallet. So on Tuesday, I
|
|
|
|
stacked a fine tower of boxes in the tacklestore. I got a quote, and on Wednesday I stacked a slightly dodgy pile of boxes. The van turned
|
|
|
|
up to collect it, wiht his hydraulic tail gate and his pump hand truck. The pump truck did not fit under the pallet, leaving the truck
|
|
|
|
driver and I to lift the 390kg pallet on to another pallet. After much grunting and straining we lifted the boxes on to a "decent" pallet.
|
|
|
|
On Friday I received a message saying the cheque I sent on Thursday had not arrived. So I ignored it, and it all turned up in Bad Aussee
|
|
|
|
on Monday.</p>
|
|
|
|
|
|
|
|
<d>19/7/04</d> <w><u>Martin</u>, Nial</w>
|
|
|
|
|
|
|
|
<p>Went in E, noticed rubs (Olly says it wasn't his (threatened with hammer)). Rigged Taking the Piss, with PPE green string. Rigged Wot
|
|
|
|
No Bolts, from first hole using two bolts! (Deviation needed). 03-67B pushed to conclusion, 03-68B, 03-69B pushed to beginning of Faith
|
|
|
|
traverse. Pencil broke, so took some photos.</p>
|
|
|
|
|
|
|
|
<d>18/7/04</d> <w>Olly B + <u>Jenny</u></w>
|
|
|
|
|
|
|
|
<p>Walked back up to the bivvy, and sat around for a while feeling too hot. Eventually got underground with a plan of finishing surveying
|
|
|
|
what we have found. We started at Draught Bitter, and surveyed downwards. I realised how crap surveying pitches was, especially really
|
|
|
|
draughty pitches that twist around lots meaning you can't easily do plumbs. Only once did we both need to be hanging from the same rope
|
|
|
|
for a little while. Got down to the higher rock bridge (the one with the rebelay) before we got cold and unenthused. Olly went out whilst
|
|
|
|
I swung around looking at possible leads and so I could draw things better. The big snow plug appears to be partly resting on another rock
|
|
|
|
bridge, with an alternative smaller route down behind it. There were also two smallish (~1 or 2m in diameter) aven tube type things going
|
2004-10-10 13:05:20 +01:00
|
|
|
up from behind. I then checked out the small aven with ice near the top of Draught Bitter – this didn't appear to go too far. Once out we
|
2004-10-08 19:00:30 +01:00
|
|
|
surveyed in the 76b entrance. This was less nice as the rocks are very sharp, the roof is a bit loose and there is a little climb in the
|
|
|
|
middle. Definitely not worth using as an entrance when 76a is so much nicer.</p>
|
|
|
|
|
|
|
|
<g>T/U 3hrs</g>
|
|
|
|
|
2004-10-09 14:55:20 +01:00
|
|
|
<d>19/7/04</d> <w>Olly B + <u>Jenny</u></w> <t>76: Brave New World</t>
|
|
|
|
|
|
|
|
<p>Went back down 76 with bolting gear with a view to ticking off Olly's lead on the ledge and then rigging on down. I lined Olly up the
|
|
|
|
short but exposed climb, then couldn't see what was happening for ages. Olly got to the end of the rope and assured me it was safe to
|
|
|
|
untie, and then went off exploring. I sat on a ledge with my light off (in case Olly's passage came back to the shaft). Ages later, and
|
|
|
|
just as I was getting worried, Olly returned. I convinced him that seeing as he was there it was worth bolting and then surveying. So
|
|
|
|
whilst he bolted the climb I prussiked out for the survey kit.</p>
|
|
|
|
|
|
|
|
<p>45 minutes later I was back at the climb to find Olly had dropped my spanner after putting in the backup. I passed him up a maillon and
|
|
|
|
he tightened the Y-hang bolts and I came up. The crawling passage led on past two sharp corners (Pool Sink fashion) and a passage off on
|
|
|
|
the right to a pitch. We carried on, and after the odd lower bit some more passages branched off at a drafty spot: two more tube type
|
|
|
|
things, one high on the left and one on the right, then a narrow (~50cm) crack on the left that appears after a few metres to lead to a
|
|
|
|
snow slope. (Looking at the locations, we suspect this might be part of 99.) Continuing along the passage + past another low bit I
|
|
|
|
suddenly emerged in the top of a big vadose passage, several metres high and going in both directions!</p>
|
|
|
|
|
|
|
|
<p>Upstream led to a choke, so we sureveyed out from here, passing another couple of passages on the way. We had a quick look downstream,
|
|
|
|
but didn't survey. Soon an aven joined and the passage increased in size and became looser. In front a pitch dropped down and the passage
|
|
|
|
seemed to continue above. To the left another couple of passages left! Amazed and and pleased at our finds we continued to survey out,
|
|
|
|
getting very annoyed with the crappy compass. After 35 legs we eventually tied the survey in with the previous one, and could leave the
|
|
|
|
cave!</p>
|
|
|
|
|
|
|
|
<g>T/U 8hrs</g>
|
|
|
|
|
|
|
|
<d>18/7/04</d> <w><u>Dave</u>, Becka, Nial</w> <t>Gaffered rig + tourist</t>
|
|
|
|
|
|
|
|
<p>Wandered down Gaffered, while Nial + Becka touristed up Swings and aparently pushed a QM somewhere. (Becka: where was it?) (<i>[Becka's
|
|
|
|
handwriting]</i> By station 12 on RH wall, wasn't down as QM. Didn't go. Surveyed 2/8/04. Also looked at QMs on Colonnades, nothing
|
|
|
|
easy.)</p>
|
|
|
|
|
|
|
|
<p>Met up again at the bottom of Tape Worm pitch, where Becka and I just about contrived to find the bolts between us. (Becka added a bolt
|
|
|
|
to the traverse below Tape Worm.) Ran out of hangers after Eyehole pitch, so turned around and came out.</p>
|
|
|
|
|
|
|
|
<p>Becka suggested a wander up Treeumphant to Chocolate Salty Balls. It's very nice passage; we poked around for a while before heading
|
2004-10-10 13:05:20 +01:00
|
|
|
out. On the way back, had a stare at what may be QM 00-34C – it's rubbish, a tube at roof level which might be climbable into with one or
|
2004-10-09 14:55:20 +01:00
|
|
|
two bolts, but all the rock is awful.</p>
|
|
|
|
|
|
|
|
<g>T/U 8.5hrs</g>
|
|
|
|
|
|
|
|
<d>19/7/04</d> <w>Olly M, <u>Dave</u></w> <t>Razor Dance</t>
|
|
|
|
|
|
|
|
<p>Carried in the pushing rope, and rigged the pitches beyond Steady Now. Ran out of hangers at the top of Yeast. Also placed a hand bolt
|
|
|
|
at the top of Mystery Wind, so as to replace existing dodgy thread, but didn't have a hanger for it. Headed out without a great deal of
|
|
|
|
speed (I was very cold and Olly very knackered).</p>
|
|
|
|
|
2004-10-10 13:05:20 +01:00
|
|
|
<p><strong>NB</strong> The roof tube below Mystery Wind could do with a bolt and a sling or something as a handline – climbing out of it
|
2004-10-09 14:55:20 +01:00
|
|
|
on the downstream side is very awkward if you don't get yourself into the right orientation to start with. (I did a bizarre Superman-style
|
|
|
|
dive out of it which could have been very nasty. Fortunately I succeeded in landing on the tacklesack!)</p>
|
|
|
|
|
|
|
|
<g>T/U 12hrs</g>
|
|
|
|
|
|
|
|
<d>21/7/04</d> <w><u>Mark D</u>, Dour</w> <t>Razor Dance</t>
|
|
|
|
|
|
|
|
<p>An exceptionally early start (9.30 am!) and a quick trip down to the start of Razor Dance. Reached the pushing front at about 13:30
|
|
|
|
after rigging Yeast pitch. Dour bolted the traverse while Mark quickly dropped the pitch on naturals. The continuation at stream level was
|
|
|
|
really nasty. So we voted for the high traverse, which goes into a level with a real floor, <b>The Nordic Traverse</b>. We surveyed into
|
|
|
|
this, eventually reaching a small climb/pitch down (approx 5m). This was duly rigged and it lands in a small chamber, <b>Thirteen Year
|
2004-10-10 13:05:20 +01:00
|
|
|
Itch</b>. From here a further pitch of 18m was dropped back into the streamway. This pitch, <b>Pepper Pot</b>, was a real stunner – best
|
2004-10-09 14:55:20 +01:00
|
|
|
pitch in the cave (imho)! Below the pitch, the rift continues in the same awkward style. By now it was 16:30 so we quickly surveyed the
|
|
|
|
pitches and then headed out. Mark was out 20:15, Dour at about 22:45. See my note from the previous trip about Dour needing a foot
|
|
|
|
jammer!</p>
|
|
|
|
|
|
|
|
<p>This was a fantastic trip, one of the best I have ever done in Austria. Home tomorrow, but a great memory to take with me!</p>
|
|
|
|
|
|
|
|
<g>T/U Mark D 10.75hrs Dour 13.25hrs</g>
|
|
|
|
|
|
|
|
<d>19/7/04</d> <w><u>Becka</u> + Earl</w> <t>Gaffered rig to Underworld</t>
|
|
|
|
|
|
|
|
<p>Earl put in a Y-hang about 40% down from the top of Gaffered to help speed up using it + take us a bit further from the spray. Becka
|
|
|
|
replaced the two ropes Dave rigged yesterday with a 9mm (bit too skinny) 91m then Earl continued to rig down Gaffered, adding a backup
|
|
|
|
bolt to Eyehole and bolting the traverse up to Gaffered. Not long at bottom so we surveyed <b>QM 03-8A</b> which soon choked and went out.
|
|
|
|
Takes ~2hrs from bottom.</p>
|
|
|
|
|
|
|
|
<g>T/U 9hrs</g>
|
|
|
|
|
|
|
|
<d>20/7/04</d> <w><u>Becka</u>, Nial + Earl</w> <t>Underworld / Sirens push + survey</t>
|
|
|
|
|
2004-10-10 13:05:20 +01:00
|
|
|
<p>Finally ready to roll pushing: looked at <b>03-29A</b> rigged handline to edge of large chamber – no rope so leave that, plus
|
2004-10-09 14:55:20 +01:00
|
|
|
<b>03-30B</b> which needs a high-level traverse. (See our 22nd July trip.)</p>
|
|
|
|
|
|
|
|
<p>Ticked off + surveyed <b>03-28B</b>, <b>03-27B</b> and <b>03-26B</b>. I think <b>03-25B</b> can be downgraded to a "C" QM. Then up to
|
2004-10-10 13:05:20 +01:00
|
|
|
crystal pool. Surveyed chamber at <b>03-31B</b>. Nial climbed up to the mud filled pocket on the left of the chamber – apparently choked
|
2004-10-09 14:55:20 +01:00
|
|
|
with mud. The small pit in the floor of the chamber is blind except for a miserable boulder-filled hole whcih you can get to the other
|
|
|
|
side of from a small passage on the opposite side of the passage as 03-25B. There is a hole over your head in the chamber but Nial said
|
|
|
|
the banks of mud would make it very hard to get into, plus a miserable little hole on the opposite wall. Then surveyed from 03-21B to
|
|
|
|
03-22C to complete a small loop. <b>03-20B</b> doesn't exist, just mud-filled, though there is a miserable thin rift in the floor of the
|
|
|
|
chamber it's in. <b>03-19C</b> is still there (actually there are two roof tubes but the more promising, higher one would be tough to get
|
2004-10-10 13:05:20 +01:00
|
|
|
into). Re-checked <b>03-23C</b> – not at all promising, and <b>03-24C</b> likewise – a v.steep climb.</p>
|
2004-10-09 14:55:20 +01:00
|
|
|
|
|
|
|
<p>That seemed to tick off all the horizontal leads in Sirens (boo-hiss) so we went back to Eeyore and Earl started to bolt <b>03-3B</b>.
|
2004-10-10 13:05:20 +01:00
|
|
|
Whilst he started, I checked <b>03-5B</b> – it's a blind pit, only 4m down. I also went down to <b>03-4B</b> – it's a smallish pitch/rift
|
2004-10-09 14:55:20 +01:00
|
|
|
whcih looks like it would connect to <b>03-2B</b> + big, chossy boulders at the top. Once again not at all enticing. Neither <b>03-7C</b>
|
|
|
|
or <b>03-6C</b> look to be much.</p>
|
|
|
|
|
|
|
|
<g>T/U 9hrs</g>
|
|
|
|
|
|
|
|
<p><i>[Extensively annotated copy of 2003 Underworld survey with ticked-off leads noted.]</i></p>
|
|
|
|
|
2004-10-10 13:05:20 +01:00
|
|
|
<d>21/7/04</d> <w><u>Becka</u> + Nial</w> <t>Surface Prospect</t>
|
|
|
|
|
|
|
|
<p>Wandered over col beyond 204 towards Grie&eszet; Kogel then back round on plateau side. Put in two tags on new caves:</p>
|
|
|
|
|
|
|
|
<ul>
|
|
|
|
<li><b>CUCC 2004-10</b>: Earl's GPS (WGS 84) N47° 41.740' E013°49.069'. Photo #54 on Nial's camera. 215° to Zinken; 309° to
|
|
|
|
peak of Grie&eszet; Kogel (stone arch visible). Entrance shaft with snow plug + pitch visible beyond. Can get to head of pitch by going
|
|
|
|
down a side tube next to main entrance shaft. Pitch < 10m.</li>
|
|
|
|
|
|
|
|
<li><b>CUCC 2004-11 (In Your Face cave)</b> Earl's GPS WGS84 N47° 41.597' E013° 49.047'. Photo #55 on Nial's camera. 202° to
|
|
|
|
Brauning Näse; 218° to Zinken. Strongly drafting entrance crawl to steep down phreatic passage to small chamber + pitch up-climb
|
|
|
|
on opposite wall. Tony + I surface surveyed to 2004-11 in the evening of 21st; Martin, Stuart + Nial did a push + underground survey on
|
|
|
|
22nd.</li>
|
|
|
|
</ul>
|
|
|
|
|
|
|
|
<p>We also found (but didn't tag as didn't seem promising enough!)</p>
|
|
|
|
<ol>
|
|
|
|
<li><b>N 47° 41.605' E013° 49.265'</b> – a 4m surface shaft.</li>
|
|
|
|
<li><b>N 41° 41.686' E013° 48.981'</b> – a too-tight but <em>very</em> strongly drafting hole.</li>
|
|
|
|
<li><b>N 47° 41.590' E013° 49.068'</b> – very close to 2004-11 and also drafting.</li>
|
|
|
|
</ol>
|
|
|
|
|
|
|
|
<p>We also re-found 2002-04.</p>
|
|
|
|
|
|
|
|
<p>Dave wanted to learn how to drill bolts so down to Earl's drill in the Underworld ... but first we surveyed + derigged Eeyore. Then
|
|
|
|
Dave derigged the 26m that Earl + Stuart had started to rig along the traverse in Sirens yesterday (they'd hoped to get to 03-18B). Took
|
|
|
|
all the junk to the end of Quiz Rift then Earl supervised Dave rigging 03-29A which went down the mud ramp then a Y-hang (bolt + boulder)
|
|
|
|
then a rebelay bolt then drop down to sloping ledge (~10m) to rebelay off a <em>small</em> knobble then down to floor. Another pitch
|
|
|
|
beyond this which Dave bolted but didn't have enough rope to descend.</p>
|
|
|
|
|
|
|
|
<p>Meanwhile Becka was hand bolting a traverse to get to 03-30B - three naturals and five (yes, far too many) bolts later I got to the
|
|
|
|
muddy up-slope only to be told there was no time to check it out because I had to survey Dave's pitch. Actually I was pooped by the having
|
|
|
|
spent half an hour suspended 5m above the floor in a rift far too wide to bridge, trying to get to the far side. I tried prusiking up my
|
|
|
|
own long cowstail, putting slings for extra footloops into cowstails + sheer brute ignorance. It was also pretty exciting (i.e. dynamic)
|
|
|
|
getting back - a free-hanging traverse. Surveyed Dave's pitches. Names: my traverse will be <b>The Generation Game</b>, Dave's first pitch
|
|
|
|
is <b>Gardeners' World</b>, and his next one is <b>University Challenge</b>. Way out up Gaffered was way, way, <strong>way</strong> too
|
|
|
|
muddy - I'd had to do a welly-brake on the way down + both my hand + my chest jammer were slipping on the way up ... but I didn't have
|
|
|
|
nearly as much fun as Dave who became an incandescent Mr. Angry + ended up prusiking twice as far as the rest of us. I left him to Earl's
|
|
|
|
calming tongue. <i>[I think my jammers are knackered - the teeth don't bite like they used to.—DL]</i>.</p>
|
|
|
|
|
|
|
|
<g>T/U 11 hours</g>
|
|
|
|
|
|
|
|
<d>21/7/04</d> <w><u>Jenny</u> + Olly B</w> <t>99</t>
|
|
|
|
|
|
|
|
<p>Walked back up to our bivvy in the sun; when we got there, Olly wasn't feeling too well, so we decided that I'd explore 99 whilst Olly
|
|
|
|
sat on the surface and patched his oversuit. I went down rigged off the v.dubious tag bolt and a spike. It went down an inclined rift with
|
|
|
|
snow on the floor for a bit less than 10m then wiggled round right and then left to be below itself again. Here there were 2 old spits,
|
|
|
|
teh first of which I rebelayed too. After this a draft was coing through a small ice-covered rift heading roughly towards the appropriate
|
|
|
|
part of Brave New World. I kicked lots of snow out of the way and attempted to fit through the pitch head; I got roughly half way before
|
|
|
|
feeling it was a bit too tight and committing, and dediced to come out, which was easier said than done.</p>
|
|
|
|
|
|
|
|
<p>After a while of fruitless wiggling I got a bit scared and asked Olly to put his caving gear on to come + help. As soon as Olly left I
|
|
|
|
found a foothold and freed myself sufficiently to escape, but at least Olly had practice at getting into caving gear quickly! I came out,
|
|
|
|
leaving the ice squeeze for either a day later on in expo with less ice, or a day with a hammer.</p>
|
|
|
|
|
|
|
|
<g>T/U Jenny 1hr</g>
|
|
|
|
|
|
|
|
<d>22/7/04</d> <w>Jenny, <u>Olly</u></w> <t>76</t>
|
|
|
|
|
|
|
|
<p>We went down 76 to push the pitch lead near the start of the "Test Tubes". It was unclear if the pitchhead was perched rocks or solid,
|
|
|
|
so I used a mostly convincing thread as a backup, and put in a traverse spit, then a Y hang out in the rift. The rift was a good 1.5m
|
|
|
|
wide, and tall so things looked promising. I descended and traversed upstream, but just round the corner was a pitch up. Downstream
|
|
|
|
dropped away and got narrower. Two rebelays later we were in the top of the rift, with a barely feasible squeeze into a lower level. The
|
|
|
|
bottom appeared to drop into blackness through a small hole - small stones dropped for a second or two if they got through the hole. The
|
|
|
|
position is such that this is very likely to be dropping into the original 70s pitch series, so there wasn't much motiviation for
|
|
|
|
desperate squeezes. Jenny tried to get through at a lower level, but that didn't work. So we surveyed out to connect to the previous Brave
|
|
|
|
New World survey and went home. Jenny put in a better placed spit for the ledge end of the pendule on the way out.</p>
|
|
|
|
|
|
|
|
<g>T/U 5.5hrs</g>
|
|
|
|
|
|
|
|
<d>22/7/04</d> <w><u>Olly</u>, Peter</w> <t>Random German</t>
|
|
|
|
|
|
|
|
<p>Pete and I had failed to walk up the previous evening so an 8am rising and a run to the bus stop was in order. Waiting in Bad Aussee
|
|
|
|
allowed a random German bloke to approach and ask us if we could "show him the caves". Julia's powers of dissuasion are clearly lacking
|
|
|
|
because this random person proceeded to follow me and Peter from the top of the toll road to the plateau and on to the stone bridge (Julia
|
|
|
|
had lunch with Dour so didn't walk with us). Upon arriving he asked where the toilet was, "I need a big one", so I showed him the shitting
|
|
|
|
grike. Thankfully his aim was true and no further flies were attracted to mal-aimed turds. He then had two cups of hot chocolate, took
|
|
|
|
photos, and translated the phone message. We bid farewell at the entrance to Hauchhöhle, and despite my best efforts at looking for a
|
|
|
|
corpse on the next walk down I found none and must assume he made it. Lucky really given his nice Nikon camera and the pictures of me and
|
|
|
|
Peter on his 35mm film...</p>
|
|
|
|
|
|
|
|
<d>22/7/04</d> <w><u>Olly</u>, Peter</w> <t>Hauchhöhle</t>
|
|
|
|
|
|
|
|
<p>Julia had asked people to look at Hauchhöhle so Pete and I decided to have a poke. A survey was produced showing the main way on
|
|
|
|
to be to the left at the bottom of the (first) pitch. Pete rigged the pitch and followed my bad advice of rethreading the rope around the
|
|
|
|
natural backup because we only had one sling. Dour had told me a deviation was needed to stop the rope rubbing and he was indeed correct.
|
|
|
|
So I spent the next half hour putting in a spit and getting groin injuries, while Pete scrotted around in every unpromising lead he could
|
|
|
|
find. At one point the digested aroma of shrimp noodles à la Blue Dragon chased him out of such a passage and the Flatulence Series
|
|
|
|
was born.</p>
|
|
|
|
|
|
|
|
<p>By the time I had finished bolting, he had unfortunately found a tight rift that appeared to go, culminating in a climb that I had to
|
|
|
|
convince Peter to descend (with the aid of 2 slings lark's-footed around a natural). After that it was all downhill as each unsurveyed bit
|
|
|
|
of passage led to a further junction with two new leads. We pushed all the leads we could for several hours, with Pete pushing a
|
|
|
|
particular oxbow several times (<b>Clifton's Circuit</b>). Then we ran away to the Stone Bridge and recounted tales of our great adventure
|
|
|
|
and miles of cave passage to whoever would listen.</p>
|
|
|
|
|
|
|
|
<g>T/U 6hrs</g>
|
|
|
|
|
|
|
|
<d>23/7/04</d> <w><u>Dave</u>, Pete, Olly M</w> <t>Hauchhöhle surveying</t>
|
|
|
|
|
|
|
|
<p>Pete + Olly had returned to camp the previous day with tales of caverns measureless to man, and nothing surveyed. So I jumped at the
|
|
|
|
chance to go and practice my survey note-taking, hoping to go on to bolt down the pitches (or rather show Olly how).</p>
|
|
|
|
|
|
|
|
<p>However I had somewhat underestimated the amount! Eleven hours later we crawled out, knackered, with 58 legs of survey in the book even
|
|
|
|
ignoring all the oxbows and loops, and more passage still going. (Olly had put one bolt in the pitch before getting caught up in the
|
|
|
|
surveying as well.)</p>
|
|
|
|
|
|
|
|
<g>T/U Pete + Dave 11h, Olly 10h</g>
|
|
|
|
|
|
|
|
<d>24/7/04</d> <w><u>Dave</u>, Becka, Pete, Olly M, Earl</w> <t>Hauchhöhle again</t>
|
|
|
|
|
|
|
|
<p>A complex plan emerged over breakfast. Team keen (Dave + Becka) would go in and do some more surveying; team fester (Olly + Earl) would
|
|
|
|
bolt the pitch; and team artistic (Pete) would take some photos. At 11.30 team science (Dour) would shout dow surface hole 2002-02 so we
|
|
|
|
could check if it connected to the daylight aven in the main Hauchhöhle trunk. At 5pm the underground teams would meet up; Olly, Pete
|
|
|
|
and I would bugger off down the hill and Earl + Becka would keep on caving.</p>
|
|
|
|
|
|
|
|
<p>This complex plan worked surprisingly well. 2002-02 does connect. Pete got his photos. Becka + I surveyed some existing stuff; Becka
|
|
|
|
found a bypass to Tacklesack Blues via a roof tube. Then Becka spotted a traverse over the head of one of our pitches. After a quick
|
|
|
|
detour to collect the rope, and using a sling larks-footed around my belt as an improvised cowstail, we were across. Hey presto, yet more
|
|
|
|
passage! (<b>Sweet Sight</b> passage.) Stomp stomp stomp for 150m or so. Walked down the hill with 28 legs more survey in my pocket, in
|
|
|
|
addition to the previous day.</p>
|
|
|
|
|
|
|
|
<p><i>[Continuation in Becka's handwriting]</i> Earl kept rigging the pitch but the drill battery ran out after the pitchhead + deviation
|
|
|
|
bolts (part way through a Y-hang ~20m down from the pitchhead - probably another 15m drop beyond here). We then went back to Sweet Sight
|
|
|
|
passage + went up the left-hand roof tube QM just after the drippy aven with the bat skeleton. We surveyed 8 legs up there, past a tight
|
|
|
|
thrutch into an aven with water coming in and a too tight rift off. Out + home.</p>
|
|
|
|
|
|
|
|
<g>T/U Dave 6.5h; Olly 4h; Pete 4h; Earl 7h; Becka 9.5h</g>
|
|
|
|
|
|
|
|
<d>24/7/04</d> <w><u>Jenny</u> + Olly B</w> <t>Eislufthöhle - rigging down 70's route to Keg Series</t>
|
|
|
|
|
|
|
|
<p>We decided that today we would continue down the 70s route and see how far we could get with the rope + hangers we had. I wanted to
|
|
|
|
play with the drill, so set off down to the current end of the rigging (the next ledge on from the Test Tube passage) and put in a nice
|
|
|
|
Y-hang. Meanwhile Olly swung around on the snow plugs below to retrieve my spanner he had lost. The pitch was really nice - the best so
|
|
|
|
far, a lovely hang in a huge shaft, on down to the next ledge + some 1970s spits, one of which was used as part of the Y, a deviation
|
|
|
|
later and I was at the bottom of "Plugged Shaft" on a bouldery floor with a huge bit of scaffold bar longer than I am! The next pitch
|
|
|
|
wasn't far away, and as we weren't certain how solid the floor was we continued the rope round - this is where the 112m rope ended, so we
|
|
|
|
tied on the 85m and Olly bolted down "Saved Shaft" with, as is typical of this cave, a deviation. We now arrived at a HUGE boulder pile,
|
|
|
|
with at least one boulder bigger than a car! The way on was under these with the draft. The boulders actually looked quite wedged, but it
|
|
|
|
is probably worth trying to get over the top sometime (a) to see if it goes anywhere new and (b) in the hope that it is safer. Olly rigged
|
|
|
|
a traverse line through the boulders, as once on the other side you are in a rift with veg in the floor <i>[that's what I think this
|
|
|
|
says]</i> dropping away into "Keg Series" 30 odd metres below. Olly rigged down this after doing some gardening of rocks at the pitch
|
|
|
|
head, including one ~1m across... Olly got to the bottom of the first pitch and carried on down. I set off down this pitch, being really
|
|
|
|
careful of all the loose stuff still there, and reached the bottom just as Olly had reached the end of the rope below. The pitch was quite
|
|
|
|
drippy by the end, and perhaps needs rigging differently for times of rain. Anyway, with no rope, one hanger and no maillons left we
|
|
|
|
decided to survey out, pulling the rope up to the top of the pitch so we can garden more next time. We wanted to survey with a plumb leg,
|
|
|
|
but the pitch wasn't quite free hanging, so the plan was for Olly to go up, and swing across to where it would plumb from. This worked
|
|
|
|
well until Olly dislodged a small rock with his foot which fell 12m to me below. As I was looking up at the tape it did not bounce off my
|
|
|
|
helmet but hit me on the top of my nose / bottom of my forehead. It hurt lots and I screamed lots thinking I was properly broken. After a
|
|
|
|
bit I realised Olly was asking in quite a concerned way if I was OK, so I thought for a bit if I was, my nose hurt lots, but there was
|
|
|
|
only a very small bit of blood, and once I opened my eyes I realised that I could see alright, so I shouted back that I was OK, and cried
|
|
|
|
some more until the pain died away a bit. We did a bit of surveyeing. Then decided to give up until we had done more gardening and
|
|
|
|
rigging, and went back to teh base of Saved Shaft. We surveyed back till it connected at The Ledge and went home.</p>
|
|
|
|
|
|
|
|
<g>T/U 10 hours</g>
|
|
|
|
|
|
|
|
<d>25/7/04</d> <w>Olly + <u>Jenny</u></w> <t>76 - Brave New World</t>
|
|
|
|
|
|
|
|
<p>Olly fettled the rigging in the entrance to add a tight guide line above the rock bridge, and we went into the Test Tube, and onto
|
|
|
|
Brave New World, this time turning right to the pitch, traversing round it (which I found scary as it was loose) and itno the oxbow on the
|
|
|
|
left, from here we followed walking passage past some calcite and gypsum pretties until we hit a T-junction with an even bigger passage.
|
|
|
|
We followed this right and came to another junction, in from of us was a pitch down, with a passage appearing to continue over it, and
|
|
|
|
passage heading off left, as we had no tackle we followed this to a junction / chamber. Here a very small passage went left, a pitch went
|
|
|
|
down in front and a smallish passage went right. We decided to survey back from here till it joined with the 1st Brave New World
|
|
|
|
survey.</p>
|
|
|
|
|
|
|
|
<g>T/U 6hrs</g>
|
|
|
|
|
|
|
|
<p>Walked up to 204 in the evening to see where it was and say "hi" to Earl + Becka. 204 bivvy is ~45mins from our bivvy, but I don't walk
|
|
|
|
very fast.</p>
|
|
|
|
|
|
|
|
|
2004-10-09 14:55:20 +01:00
|
|
|
|
2004-10-08 19:00:30 +01:00
|
|
|
|