expoweb/plateau/182/histry.htm

115 lines
5.5 KiB
HTML
Raw Normal View History

2001-08-15 19:29:27 +01:00
<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.0//EN">
<html lang=en>
<!-- embryonic 182 history file -->
<head>
<title>
1623/182 Puffball and Icing Sugar Cave history
</title>
</head>
<body>
<h1>182 Puffball and Icing Sugar Cave History</h1>
<h3>1990</h3>
<a href="../../years/1990/log.htm#1990-182-1">07.30</a>
Discovery by Jeremy (15 min) and Adam (35 min)<br>
<a href="../../years/1990/log.htm#1990-182-2">08.02</a>
Joe (1 hr) and Adam (2 hr) push and find going<br>
<h3>1991</h3>
<a href="../../years/1991/log.htm#1991-182-1">07.04</a>
Del, Juliette, Julian H, John (3&frac12; hrs) start rigging<br>
<a href="../../years/1991/log.htm#1991-182-2">07.05</a>
Tony, John, Mark M (8 hrs) explore Shell Pitch and Q8<br>
<a href="../../years/1991/log.htm#1991-182-3">07.06</a>
Del, Juliette, Julian H, Mark M (9 hrs) push beyond Shell pitch<br>
<a href="../../years/1991/log.htm#1991-182-4">07.07</a>
Gill, Jon, Olly (7 hrs) push end and survey partway out<br>
<a href="../../years/1991/log.htm#1991-182-5">07.08</a>
Gill, Olly (11 hrs) survey down first rope, pushed Tarzan's Folly to Dark Room<br>
<a href="../../years/1991/log.htm#1991-182-6">07.09</a>
Mark M, Julian T, Olly (10 hrs) push From Dark Room to Cloud Chamber<br>
<a href="../../years/1991/log.htm#1991-182-7">07.10</a>
Tony, Del, Julian H, Juliette (10&frac12; hrs) survey, and push Fat Knot
Fruity - hit by flood pulse<br>
<a href="../../years/1991/log.htm#1991-182-8">07.12</a>
Mark D, Jon (8&frac12; hrs) push down Traditional Style pitches<br>
<a href="../../years/1991/log.htm#1991-182-9">07.12</a>
Julian H, Mark M, Julian S (9&frac12; hrs) survey from Darkroom down 2 pitches<br>
<a href="../../years/1991/log.htm#1991-182-10">07.16</a>
Mark D, Julian H (4 hrs) push lead above Q8<br>
<a href="../../years/1991/log.htm#1991-182-11">07.17</a>
Wookey, Julian H (3&frac34; hrs) flood-aborted survey/derig<br>
<a href="../../years/1991/log.htm#1991-182-12">07.23</a>
Andy, Wook (10 hrs) derig 1st wave<br>
<a href="../../years/1991/log.htm#1991-182-13">07.24</a>
Henri, Olly (8&frac34; hrs) derig 2nd wave<br>
<h3>1992</h3>
<a href="../../years/1992/log.htm#1992-182-1">06.26</a>
Mark M, Julian H, Alastair (9 hrs), Matt (6 hrs) rig in<br>
<a href="../../years/1992/log.htm#1992-182-2">07.02</a>
Mark M, Julian H, Alistair (9&frac12; hrs) rerig/push Piezo towards Dark Room<br>
<a href="../../years/1992/log.htm#1992-182-3">07.03</a>
Mark M, Julian H, Alistair (11 hrs) push Piezo into Darkroom<br>
<a href="../../years/1992/log.htm#1992-182-4">07.03</a>
Matt, Glen, Julian S (7 or 8 hrs) discover Brute Force and Ignorance<br>
<a href="../../years/1992/log.htm#1992-182-5">07.04</a>
Glen, Mark M (11 hrs) rerigging and ferrying gear to front<br>
<a href="../../years/1992/log.htm#1992-182-6">07.04</a>
Matt, Julian S (7 hrs) rig Ignorance into Dot-to-dot<br>
<a href="../../years/1992/log.htm#1992-182-7">07.07</a>
Mark S, Clive (5 hrs) tourist to Natural Redundancy<br>
<a href="../../years/1992/log.htm#1992-182-8">07.08</a>
Olly, Julian S, Glen (7&frac12; hrs) pottering and down to Darkroom<br>
<a href="../../years/1992/log.htm#1992-182-9">07.08</a>
Matt, Julian H, Alistair, Mark M (14 hours) push Navigational Limit and collapse entrance<br>
<a href="../../years/1992/log.htm#1992-182-10">07.10</a>
(probably really 07.09) Olly (&frac14; hr) gingerly retrieves drill from entrance<br>
<a href="../../years/1992/log.htm#1992-182-11">07.10</a>
Dave, Andrew (3 hrs), "everybody else" stabilise entrance at some risk<br>
<a href="../../years/1992/log.htm#1992-182-12">07.11</a>
Julian H, Richard, Aggy (8&frac12; hrs) layed 600m cable and checked wet-weather rigging<br>
<a href="../../years/1992/log.htm#1992-182-13">07.14</a>
Alistair, Clive, Fran, Mark M (13 hrs) push two pitches to sump<br>
<a href="../../years/1992/log.htm#1992-182-14">07.14</a>
Richie, Jerry (9&frac12; hrs) tourist and pull drill up Piezo<br>
<a href="../../years/1992/log.htm#1992-182-15">07.14-15</a>
Olly, Julian S (9 hrs) do lots of survey<br>
<a href="../../years/1992/log.htm#1992-182-16">07.16</a>
Richie, Ali M (5&frac12; hrs) surveying in Strike 2<br>
<a href="../../years/1992/log.htm#1992-182-17">07.16</a>
Julian H, Wookey (11 hrs), Gill (8 hrs) surveying and some derig<br>
<a href="../../years/1992/log.htm#1992-182-18">07.17</a>
Olly, Julian S (9 hrs) surveying QS&amp;C<br>
<a href="../../years/1992/log.htm#1992-182-19">07.18</a>
Julian H, Mark M (11&frac12; hrs), Andy, Tony (8&frac12; hrs) photo and derig bottom<br>
<a href="../../years/1992/log.htm#1992-182-20">07.23</a>
Julian S (1&frac12; hrs) fails to derig as no rope to pull out<br>
<a href="../../years/1992/log.htm#1992-182-21">07.27</a>
Wookey, Olly (6 hrs 20) derig most<br>
<a href="../../years/1992/log.htm#1992-182-22">07.28</a>
Wookey, Olly (6 hrs 50) survey, push odds, derig more<br>
<a href="../../years/1992/log.htm#1992-182-23">07.30</a>
Clive (2 hrs?) goes to derig, but already done<br>
<a href="../../years/1992/log.htm#1992-182-24">08.01</a>
Olly (8&frac12; hrs) solo survey, push and derig<br>
<hr>
<!-- LINKS -->
<img alt="&gt;" src="../../../icons/lists/0.png">
2001-08-15 19:29:27 +01:00
<a href="../182.htm">Back to cave description</a><br>
<img alt="&gt;" src="../../../icons/lists/0.png">
2001-08-15 19:29:27 +01:00
<a href="../../index.htm">Back to Expedition Intro page</a><br>
<img alt="---&gt;" src="../../../icons/lists/1.png">
2001-08-15 19:29:27 +01:00
<a href="../../indxal.htm">Full Index</a><br>
<img alt="---&gt;" src="../../../icons/lists/1.png">
2001-08-15 19:29:27 +01:00
<a href="../../areas.htm">Other areas</a><br>
<img alt="------&gt;" src="../../../icons/lists/2.png">
2001-08-15 19:29:27 +01:00
<a href="../index.htm#182">Plateau area index</a>
</body>
</html>